e-bridge 中文意思是什麼

e-bridge 解釋
神州商橋網
  • e : (pl E s e s )1 英文字母表第五字母。2 【音樂】E調,E音。3 E字形。4 〈美國〉(順序)第五等,(成...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  2. Your limousine is a luxurious mercedes benz e class for up to four passengers to and from hong kong international airport, including all luggage handling charges, tunnel and bridge tolls and driver gratuities

    我們特別安排了可供4人乘坐的豪華e - class賓士房車,接載您往返香港國際機場。為讓您的旅程倍感舒暢,行李處理費隧道過橋費及司機小費已包括在內。
  3. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集水面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精度較高,設計的洪水流量一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  4. The forum examined the role of donors and other actors in helping to bridge the international digital divide, develop e - commerce and e - government, and use icts to spur progress towards agreed international development goals

    論壇的作用,研究捐贈者和其他參與者在幫助彌合國際數字鴻溝,發展電子商務和電子政府,利用信息和通信技術促進商定的國際發展目標的進展情況。
  5. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  6. Highlink believes it ' s a small world when there ' re friends around, we ' d like to be the bridge between you and your customers by providing voice & data services, internet access, enterprise virtual private network ( vpn ), e - commerce, enterprise telecommunications integration, telecommunications project design / construction and building / residential telecommunications facilities, and customized value - added telecommunication services

    海鄰電訊以「海內存知己,天涯若比鄰」為服務理念,為客戶提供語音/數據專線、網際網路接入、企業虛擬專用網( vpn ) 、電子商務、企業通信整合、通信項目的設計/施工及樓宇/住宅通信配套,並根據客戶需求提供定製化的增值電信服務,輔助客戶通過海鄰電訊搭建的通信橋梁,溝通無限。
  7. For example, the technical problem of the hubei e ' huang bridge 6 # podium ' s in construction, the foundation of jing - sha bridge 2 # main tower, wen - zhou bridge main tower, wu - han bai sha - zhou bridge 3 # main tower, and qi - ao bridge main tower, etc. in overseas, the main trend of is very clear

    例如湖北鄂黃大橋6 #墩施工系列技術問題的處理,以及荊沙大橋2 #主塔、溫州大橋主塔、武漢白沙洲大橋3 #主塔、淇澳大橋主塔等基礎施工。
  8. In theory, it is feasible that using grey system theory to forecast flexibility. on the basis of this theory, taking 270 meters span continuous rigid frame bridge of humen bridge as an example, this paper analyzes the flexibility deformation in th e process of construction

    採用灰色系統理論來進行預測,從理論上來說具有一定的可行性,基於這一思想,本文以虎門大橋270米混凝土連續剛構橋施工中的撓度變形為例進行了計算分析。
  9. The first one is linker layer i. e. ccmmunication protocol, which is the bridge between software and hardware

    軟體體系結構可以分為四層,第一層為連接層,也就是通訊協議,是軟體與硬體溝通的橋梁。
  10. From hu - nei provincial highway no. 17 - 1 : from mingsing rd. to the north - turn left to jhonghua s. rd. - turn right to jhonghua e. rd. - turn left to minchuan rd. - anbei rd. - turn right across sihcao bridge - to sihcao blvd. total distance is 18. 5 km

    湖內(臺17甲省道)方向:自臺南市明興路北上左轉中華南路右轉中華西路左轉民權路安北路右轉跨過四草大橋四草大道直行即可抵達,全程約18 . 5公里
  11. How can libraries bridge the gap between their own services and systems and those of the e - learning environment

    圖書館如何築起服務與課程管理系統和數位學習間的橋梁?
  12. For recent years, adsl has world widely employed and widely used in many aspects such as vod, remote medical treatment and e - shopping etc. but we noticed that the traditional telephone networks are designed for the transmission of low frequency signals, and the adsl ' s frequency rang is from 0 to 1. 104mhz, so we must confront the signal attenuation, the loop line noise impairments, the crosstalk interferences, the bridge tap reflections and the rf disturbances problems and many other problems when transmitting the adsl signals one the telephone networks

    近幾年來, adsl在世界范圍內得到充分的使用,廣泛應用於視頻點播、遠程醫療、網上購物等各個方面。但是由於電話線網路是專門為傳輸低頻信號而設計,而adsl的頻譜范圍在0 1 . 104mhz內,因此在傳輸adsl信號時,面臨著信號衰減、線路噪聲、串音干擾、橋接抽頭反射和射頻干擾等等多方面的問題,這就要求在adsl開通之前對線路進行一系列的測試。
  13. Another control mode is the local control mode, i. e. the pc in home receives the message from gateway and saves that into database, then the jsp web server on pc acquires the household appliance ' s message by accessing the database through jdbc - odbc bridge to response the request of browser on remote terminal

    本地集中控制採用家庭pc機和網關相結合, pc上的應用程序提供統一的操作界面完成網關端數據信息的接收並將信息存到數據庫中。此外,家庭pc被配置成一臺jspweb服務器,該服務器通過jdbc - odbc橋訪問數據庫獲取設備的信息完成遠程控制終端瀏覽器的訪問請求的響應。
  14. In 1993, china started up three gold projects including gold - bridge, gold - check post, gold - tariff, which marked that the building of chinese e - government began. in 1999, the project of the government going into the network marked that the building of chinese e - government roundly have putted in practice

    我國1993年啟動的「三金工程」 (金橋、金卡、金關)標志著我國電子政府建設開始起步, 1999年的「政府上網工程」標志著我國電子政府建設全面實施。
  15. With the arrival of the 21 century, the automatization on ship control and management will get further improvement, and the existing ones will also be continuously perfected to a higher level, e. g. the ship ' s comprehensive automatization, one bridge system, global maritime distress and safety system ( gmdss ), global position system ( gps ), automatic identification system ( ais ), voyage digital record ( vdr ) and comprehensive multifunctional communication system etc.

    船舶綜合自動化、一人駕駛綜合導航系統、全球海上遇險安全系統、全球定位系統、船舶自動識別系統( ais ) 、船舶航行數據記錄儀( vdr )以及多功能綜合通信系統,亦將不斷完善,並向高層次階段發展。
  16. From rende county route no. 182 : from dongmen rd. to the east - turn right to jhonghua e. rd. - jhonghua s. rd. - turn right to jhonghua e. rd. - turn left to minchuan rd. - anbei rd. - turn right across sihcao bridge - to sihcao blvd. total distance is 20 km

    仁德( 182縣道)方向:自臺南市東門路左轉中華東路中華南路右轉中華西路左轉民權路安北路右轉跨過四草大橋四草大道直行即可抵達,全程約20公里
  17. D 、 the seismic response of jointless bridge were examined by spectrum analysis as well as transient dynamic analysis. e 、 the modes of a whole concrete model of jointless bridge by modes test, at the same time, the accuracy of finite element modeling and analysis was proved by it

    5 、對無伸縮縫橋按比例縮放的全橋模型進行實驗,測出結構的動力特性(固有頻率、振型、周期等) ,驗證有限元建模和分析的精確度
  18. The sceneries are including piled rainbow bridge, big sand dam, e lu long, moon lake ( chai shi tan reservoir ), and ma ti river

    包括疊虹橋景區、大沙壩景區、三腳洞景區、阿路龍景區、明月湖景區(即柴石灘水庫) 、馬蹄河景區。
  19. In comparison with the apups, the results have shown that the surface states of the hollow site are in good agreement with the experiment. so we concluded that the hollow site model is favourable for the gaas ( 113 ) ( l xi ) surface and the bridge site model should be e xcluded. 3

    3 .其他工作除此之外,論文還對鉛鹽pbte 、 pbse 、 pbs ( 001 )表面電子結構, ybco超導體表面氧特性、金屬ti和ni在金剛石表面的吸附和擴散等特性進行了研究。
  20. The committee are seriously concerned that because of the confidentiality provisions in the general conditions of contract for the bridge contracts concerned, the director of audit has to exclude from his report the relevant information, i. e. detailed information relating to the contractors, the dispute resolution processes and the settlement sums, thereby causing unnecessary delay in the committee s work and reducing the overall usefulness and timeliness of the director of audit s report

    委員會深切關注到,基於有關橋梁合約的合約一般章程所戴的保密條文,審計署署長須在其報告書內剔除有關資料,即關于承建商、解決爭議過程及和解金額的詳情,以致委員會的工作出現不必要的阻延,並減低了審計署署長報告書的整體效用及在時間上的適切性。
分享友人