early distortion 中文意思是什麼

early distortion 解釋
超前畸變
  • early : n 厄利〈姓氏〉。adj 1 早;(果實等)早熟的。2 早日的,及早的。3 早期的,很久以前的,古代的;近日...
  • distortion : n. 1. 歪扭,扭曲。2. 【電學】(信號、波形等的)失真;【物理學】(透鏡成像產生的)畸變;【醫學】扭轉,變形。3. 竄改,歪曲,曲解。adj. -al
  1. Abstract : the crystal structures obtained by static solidification and vibration solidification were compared. it was showed that, in the case of vibration solidification, the orientation growth of the columnar crystal was not obvious, the equiaxial crystal appeared more early. the grains of both types of crystals were quite fine, hardness in the full section was relatively high, and the hardness distribution was uniform. in the former case, the solute segregation in dendritical austenite more severe, and there were lumps of distortion inclusion

    文摘:對球鐵金屬型靜凝固與振動凝固的結晶組織對比表明:後者柱狀晶方向性生長較弱,等軸晶出現較早,且兩者的晶粒均較細,全斷面硬度較高且分佈均勻;前者枝晶奧氏體內溶質偏析大,有畸變夾雜團塊。
  2. In this paper, it is studied and analyzed characteristic of stress, distortion etc. of pipe liner structure combining dahuofang transport water tunnel practice project, tunnel boring machine construction, and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load. in nonlinear finite element calculation model, folium cells have been simulated among pipe liner and pipe liner and wall rock. under varies load condition, it has educed that changing rule of stress, distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation

    本文結合實際工程,分析研究了大夥房水庫輸水隧道工程在採用掘進機施工方法的情況下,利用管片襯砌的結構應力、變形等受力特性,考慮地下結構初始應力和開挖荷載對襯砌內力的影響,採用薄層單元模擬襯砌管片之間、襯砌管片與圍巖之間的非線性有限元計算模型,通過分析計算得出不同荷載工況下各類典型圍巖段隧道襯砌管片受力特徵、應力和位移變化規律。
分享友人