earth testing 中文意思是什麼

earth testing 解釋
地電位測試
  • earth : n 1 〈常E 〉 地球。2 大地,陸地,地面,地上。3 土壤,土。4 【化學】土類;泥。5 世界人類;人的軀體...
  • testing : 測試系統
  1. Testing method for the performance of full screw earth auger

    長螺旋鉆孔機性能試驗方法
  2. Earth - moving machinery - dumpers - part 3 : testing methods

    運土機械.翻斗車.第3部分:測試方法
  3. Testing earth - moving machinery - method for determination of volumetric rating of crawler and wheel tractor dozer blades

    運土機械試驗.第1部分:履帶式拖拉機和輪式拖拉機推土刮板的容積額定值的測定方法
  4. Electrical safety in low voltage distribution systems up to 1000 v a. c. and 1500 v d. c. equipment for testing, measuring or monitoring of protective measures - resistance of earth connection and equipotential bonding

    不超過交流1000v和直流1500v的低壓配電系統電氣安全性.防護測試測量或監測設備.接地和等勢屏蔽接地阻抗
  5. Electrical safety in low voltage distribution systems up to 1000 v a. c. and 1500 v d. c. - equipment for testing, measuring or monitoring of protective measures - part 4 : resistance of earth connection and equipotential bonding

    1000v交流和1500v直流的低壓分配系統的電氣安全.防護測量的試驗測量和監測設備.第4部分:地面連接和等電位連接的電阻
  6. Testing earth - moving machinery - method for the determination of volumetric ratings for hydraulic excavator buckets and backhoe loader buckets

    運土機械試驗.液壓挖掘機鏟斗和反向鏟裝載鏟斗容量額定值測定方法
  7. Testing earth - moving machinery - method for the evaluation of lift capacity of pipelayers and wheel tractors or loaders equipped with side boom

    運土機械試驗.第6部分:側面帶起重吊桿的管道敷設機和輪式拖拉機或裝載機的升降能力評定方法
  8. Abstract : the authors discuss roundly source of loose earth fo r impact - deposit debris flow to develop taking pingchuan debris flow, one of the quite typical impact - deposit debris flows in southwest sichuan province , as an example in this paper. on the basis of detailed investigations in - situ, geotechn ial testing in lab and theory analysis, all results indicate obviously that moder ate and bulky loose earth in giant debris flow situating in southwest sichuan mo untainous area are main institute, whose tribulation are consistent with landform s. loose earth locating in mid - forepart catchment are quite unstable, so often be comes main source of loose earth of debris flow. formation of loose earth is cont rolled principally by geologic and geotechnical environment while human actions is the secondary factor for loose earth to form. in many times, human actions prov ide loose earth through loose earth stability

    文摘:本文以極具典型的平川泥石流為例比較全面的分析了沖淤變動型泥石流的物源問題.根據現場調研及室內巖土分析進行的研究成果顯示,川西南高山深谷地區的大型泥石流溝中的鬆散土體以中、粗粒段為主,其分佈與地形密切相關;位於泥石流溝中、前部位的鬆散土體的穩定性最差,是補給泥石流的重要物源;鬆散土體的發育主要受控于地質及巖土環境,人類活動只能影響鬆散土體的穩定性
  9. The first, site experiment is carried out. the paper analyze in - situ testing data of subgrade which is made up of plain concrete pile composite foundation and agitation pile composite foundation including pore pressure, layer settlement of soils between piles, earth pressure, lateral deformations

    發現正常荷載下,兩種復合地基路基的受力性狀不一樣,用建築垃圾填土樁距較大的素混凝土樁復合地基,淺層應力向樁體集中,並通過樁向深層擴散,樁間土與樁有較大的相對位移,樁頂和樁端的刺入較為明顯。
  10. Weapons testing with high - speed projectiles helped prove that material exchange between the planets is not so limited as had once been thought : in fact, some 500 kilograms of rock from mars are estimated to land on the earth each year

    武器實驗中發射的高速射彈也有助於證明行星際的物質交換並不像以前認為的那樣有限:事實上,每年約有500公斤火星巖石濺落到地球上。
  11. The in - situ testing includes surface deformations, sub - surface movements, earth pressures, pore water pressures, underground water levels, spt, stresses of pipes and pipe - soil contact stresses. in addition, the total jacking forces, deviations in line and level of the pipe line and earth pressures in the earth pressure balance machines ( epbm ) are also recorded. the results of field - testing are analyzed, and the variety of testing datum include earth pressures, pore water pressures and underground water levels during the course of the shield through it are studied

    現場測試內容包括地面變形、深層土體變形、土壓力變化、孔隙水壓力變化、地下水位變化、土體標準貫入試驗、管道內力變化、管土接觸應力變化以及頂管施工現場記錄(包括頂力、土壓力、平面偏差、高程偏差等) 。
  12. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  13. Global maritime distress and safety system - part 4 : inmarsat - c ship earth station and inmarsat enhanced group call equipment - operational and performance requirements, methods of testing and required test results

    海上呼救和安全裝置.第1部分: inmarsat - c船地面站和inmarsa增強群呼設備.操作和功能要求.試驗方法和規定試驗結果
  14. Testing earth - moving machinery - engine test code - net power

    運土機械試驗.發動機試驗法規.凈功率
  15. For few domestic and international studies of the radio propagation in the overburden of the earth ' s crust, this paper theoretically stresses the propagation problem of low frequency radio wave, including slf wave and vlf wave, in the medium and briefly introduces the theory of scale model testing method

    針對國內外有關電波在地殼覆蓋層中傳播研究工作的空白,本文主要從理論上討論低頻(包括特低頻和甚低頻)無線電波在該種介質中的傳播問題,並簡要介紹縮比模型測量理論。
  16. Electrical safety in low voltage distribution systems up to 1 kv a. c. and 1, 5 kv d. c. equipment for testing, measuring or monitoring of protective measures. part 4 : resistance of earth connection and equipotential bonding

    最高可達1 kv交流電和1 . 5 kv直流電的低壓配電系統中的電氣安全性.試驗測量或保護測量監測用設備.第4部分:接地和等電位連接電阻
  17. The changing law of the synchronous armature reaction reactance parameter of the rare - earth permanent magnet synchronous machines is given out by analyzing the testing data, and the reliability of the testing instrument is proved by the experiment

    通過對測試系統所測數據的分析研究,總結出了稀土永磁同步電機的電樞反應電抗參數的變化規律,並通過實驗驗證測量裝置的可靠性。
  18. Electrical safety in low voltage distribution systems up to 1 kv a. c. and 1, 5 kv d. c. equipment for testing, measuring or monitoring of protective measures. part 5 : resistance to earth

    最高可達1 kv交流電和1 . 5 kv直流電的低壓配電系統中的電氣安全性.試驗測量或保護測量監測用設備.第5部分:接地電阻
  19. The word " work " means the engineering, design ( including, but not limited to, primary design, extended preliminary design and preparation of detailed design and construction drawings ), construction ( including, but not limited to, early work, site setting out, earth back filling works, sub - structure works, civil works, above - ground works, installation and testing ) and construction management services to be performed by the development manager and subcontractors pursuant to the provisions of this contract and a written authorization, and as modified from time to time in accordance with the provisions of this contract, and includes all designs, drawings, plans, means, methods, techniques, sequences and procedures and, unless expressed to the contrary in this contract, all materials, tools, utilities, labor, equipment services, licenses, permits, tests, warranties, guarantees, transportation and other items and facilities of every kind necessary for the complete performance of this contract

    「工程」一詞應指由開發管理人和分包商根據本合同的規定和書面授權書執行的工程、設計(包括但不限於初步設計、擴初設計以及深化設計圖和施工圖的準備) 、施工(包括但不限於前期工作、現場布局、回填土工程、次結構工程、市政工程、地上工程、安裝和測試)及施工管理服務,該等服務可根據本合同的規定被不時修訂,並包括所有的設計、圖紙、計劃、手段、方法、技術、工序和程序以及,除非合同中有相反規定,所有的材料工具、設施、工人、設備服務、執照、許可證、測試、保證、擔保、交通以及其他為圓滿執行本合同所需要的各種物品和設施。
  20. Testing earth - moving machinery - verification of retarder capability of dumpers and tractor - scrapers

    運土機械試驗.第9部分:翻斗車和拖拉機刮板的減速器性能驗證
分享友人