economic generator 中文意思是什麼

economic generator 解釋
經濟收益
  • economic : adj. 1. 經濟學的;經濟(上)的;實用的。2. 〈罕用語〉經濟的,節儉的。3. 〈委婉語〉故意隱瞞的。
  • generator : n 1 產生者,生殖者,創始者。2 發電機,發生器。3 【音樂】基礎低音。4 = generatrix a D C generator...
  1. The basic software consists of topology analysis, on - line load flow computation, state estimator, security analysis, dispatchers training simulator, short circuit current computation, and voltage / reactive power optimize, etc. the derived softwares consist of load control, capacitor optimizer configuration, transformer and feeder load distribution, impedance computation of generator, etc. network analysis software is powerful dispatch tool, though witch the current state of the power system can be realize, then improve the security and economic potential

    Dms網路分析的基本軟體有:網路結線分析、潮流計算、狀態估計、負荷預報、短路電流計算、電壓無功優化等。派生軟體有:負荷控制、電容器優化配置、變壓器與饋線負荷分配、電源阻抗計算等。網路分析軟體是有力的調度工具,通過它可以了解和掌握當前的運行狀態,從而挖掘安全和經濟方面的巨大潛力。
  2. So it is very indispensable and significant to develop the study - no operator on duty in gehp, with the exiting operation manpower resource in cypc to supervise more generator assets and bring them into maximal economic benefits

    因此在二江電廠開展無人值班研究工作,用長江電力股份公司內現有的運行人力資源管理更多的發電資產,使其發揮最大的經濟效益是非常必要也非常有意義的。
  3. In the end, the paper makes an thermodynamic analysis, evaluation of investment and techno - economic analysis on the retrofit plans of heat recovery steam generator and air pre - heater, which helps to make the evaluation of the plans from the view of energy conservation and economy benefit

    完成熱管布置設計和設備細部結構設計,繪制余熱回收設計圖紙。最後對所設計的余熱鍋爐和空氣預熱器方案進行熱力學分析、投資概算和技術經濟分析,從節能和經濟性角度評價了設計方案的效益。
  4. But recently in our country the initial investment and the fuel costs of bchp system are higher, so in this case it is necessary to optimize the important equipment - heat recovery steam generator ( hrsg ) to make the whole system have the best thermal - economic, and it will have the important meaning to popularize the bchp system smoothly in our country

    但是,目前國內bchp系統初投資和燃料價格都較高,在這種情況下對系統中的一個關鍵設備? ?余熱鍋爐進行參數優化,以使整個工程達到最佳的經濟性顯然非常必要,對bchp在國內的順利推廣具有重要意義。
  5. On the basis on these study results, we suggested some technical measures to reduce the coal residue in boiler to ensure a safe and economic operation of the generator set

    根據這些原因,有針對性地制定了防止和減輕爐內結渣的技術措施,以確保機組安全經濟運行。
分享友人