electric power curve 中文意思是什麼

electric power curve 解釋
電功率曲線
  • electric : adj. 1. 電的;帶電的;起電的,導電的,發電的,電動的。2. 令人激動的,緊張的,驚人的。3. 〈美口〉(樂曲的)用電吉他演奏的。n. 〈口語〉1. 帶電物體。2. 電動車輛。
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • curve : n 1 曲線;彎曲;彎曲物。2 曲線規 (=French curve);【機械工程】曲線板;【棒球】曲線球;【統計學...
  1. In this article i do a lot of analysis for the data formed in the mobile samples with the basis of the research of data mining, mainly including : it analyses and summarizes the theory and technology of data, especially the further discussion of the data mining algorithm for time sequential. it introduces the course of the test curve of the power transmission system of electric mobile and discusses the technology and methods of pretreatment for curve data. it studies and develops the antitype system for the analyses of test curve data of the power transmission system of electric mobile with the mining and analysis of test curve data of the power transmission system of electric mobile and the basis of the algorithm of time sequential

    本文以目前數據挖掘的研究為基礎,對汽車樣品試驗中形成的大量數據進行分析處理,主要研究內容包括:分析和綜述了數據挖掘理論基礎和相關技術,特別是對時間序列挖掘演算法進行了深入的討論介紹了電動汽車動力傳動系統檢測曲線生成的基本過程,討論了曲線數據的預處理技術與方法以時間序列挖掘演算法為基礎,對電動汽車動力傳動系統檢測曲線數據進行了挖掘與分析,研究並開發了電動汽車動力傳動系統檢測曲線數據分析原型系統。
  2. The paper build a model of electric ship power system, include the model of motor and generator derived from simulink, the model of propeller build by the author, the model of load flow. after the process of model simulation, the dynamic curve of electrical ship were drawn out

    應用simulink已有的電機模塊,再自行建立螺旋槳的simulink模型,結合數據庫模塊和用戶自定義的s函數模塊,建立了電力推進船的船?機?漿匹配模型,並進行了模擬計算和動態特性模擬,並進行了模擬結果分析。
  3. Based on many references form civil and abroad, the author mainly studies the measurment theory and method for flux, raising height, axial power and rotational velocity. avoiding many complicated and intermediate courses for power wastage analysis, introduces the electric measurement and using efficiency curve of motor in measureing axial power, and satisfies the automatization of the device. the paper also provides a new method, inductive winding, in measuring rotational velocity of electromotor, supplys limitations of other method in measuring rotational velocity of electromotor in water, and meet practical needs in developing diving electric pump for corporation

    作者在參閱大量國內外有關文獻,著重探討了水泵流量、揚程、軸功率、轉速的測試原理和測試方法,提出了採用電測法並結合電機效率特性曲線測量水泵軸功率,從而避免了損耗分析法中大量復雜的中間過程,滿足了試驗裝置的自動化測量要求;採用漏磁感應線圈法測量電機轉速,彌補了其它轉速測量方法對水下電機測試的局限性,適應了萊恩公司開發潛水電泵的實際需要。
  4. 3 foot is power source terminal at eight - phase left - hand end, they are zero curve 、 live wire 、 ground wire or “ _ ” 、 “ + ” and ground, 5 、 6 foot are lose electric alarming fan - out ( replay normal close point, the equipment cut - out after losing electricity

    左端8位端子的1 、 2 、 3腳為電源端子,分別為零、火、地或「 」 「 」 、地; 5 、 6腳為失電告警輸出端(繼電器常閉點,裝置失電后斷開) 。
  5. The inverted pwm changing electric current the technique is applied in the prototype model. the prototype model was tested and operated on spot, power factor could reach beyond 0. 95, the effect of following modulating voltage was better, the curve of factor of modulated voltage of exchanging systems changed following load rate was linear, the output of wave form was a flat and steady sinusoidal wave

    樣機採用了逆變式pwm變流技術,對其進行了現場測試與試運行,測試結果是電網側的功率因數可達0 . 95以上,跟蹤調壓效果良好,變流系統輸出調壓系數( k )隨負載率( p )的變化曲線基本滿足直線關系,輸出波形呈平滑穩定的正弦波。
  6. We find that there usually exist peaks in the electric derivative curve and optic derivative curve of high power semiconductor laser, these two kinds of peaks are related properly, the peaks with reliability of device. while the peaks with relation with the reliability of device, while the peaks with same direction are usually related to the inner defects, same directin are usually related to the inner defects, carrier leakage and current leakage, so, the device with same direction peaks is usually unreliable one

    ( 2 ) m 、 h值大, b值小的器件是質量和可靠性不好的器件( 3 )導數曲線上的峰與光導數曲線上的峰相對應,反向峰通常與器件的可靠性無關,而同向峰的存在於器件的質量和可靠性密切相關,有同向峰的器件通常是質量不好的器件,這類器件老化后特性明顯變差,這意味著導數曲線上的同向峰可以作為高功率半導體激光器可靠性篩選的一個輔助判據。
  7. By effectively managing and controlling of electric load, we can improve load curve and advance using rate of power supply equipment, which can prevent from drawing strobe and limiting electricity and avoid affecting social produce and life

    對用電負荷進行有效的管理和控制可改善負荷曲線,提高發供電設備的利用率,可防止拉閘限電,避免影響社會生產和生活。
  8. Therefore, proto - northeast electric manage department worked out a power dispatch curve examinational ways toward each subordinate power plant. in each quarter they make a reactive dispatch curve examinational fingerpost definitely, demand each power plant run in prescript generating power and voltage

    因此,原東北電業管理局向各直屬發電廠制定了無功調度曲線考核辦法,每季度都明確下達一次各發電廠的無功調度曲線考核指標,要求各發電廠在規定的發電力率和電壓下運行。
  9. Abstract : a fast drag system is designed to simulate the law of speedvariations of a certain power system engine in the process of its start by means of electric power drag and the theory of automatic control and through adopting a new type of electric machine and frequency - change techniques, thus enabling the system to achieve quick start, instantaneous breakdown and accurate following of the electric machines speed variations curve set in advance at will

    文摘:運用電力拖動與自控理論,採用新型電機及變頻技術,設計一種快速拖動系統藉以模擬某動力系統發動機啟動過程轉速變化的規律,使該系統能夠達到快速啟動,瞬間制動,精確跟隨事先設定的電機轉速變化曲線的目的。
  10. With the increase of the electric power system capacity as well as the short lines, high currents will possibly occur in the transmission line when a fault happens at the end of the line. the iron core of the current transformer ( ct ) will become saturated easily because of the large current, or when the secondary load of the ct does n ' t match the 10 % error curve

    隨著電力系統容量增大以及短線的增加,在電力系統線路末端發生短路時,有可能出現很大的短路電流;在很大短路電流的作用下,或由於電流互感器二次側負載與10誤差曲線不匹配等原因,電流互感器鐵芯很容易飽和。
  11. The adopted alternative coefficient for capacity is from 1. 05 to 1. 10 and for electric generation 1. 05. in fact, the capacity benefits are related to maximum load, load curve and the weight of hydropower power capacity. while the benefits of coal consumption saving are related to load consumption characteristic and power structure in addition to maximum load and load curve of the power system

    當系統的水電(含抽水蓄能)比重較小時, 1 . 05 1 . 1容量替代系數可能偏小;而當抽水蓄能電站佔有一定比重時,這種方法又可能過高地估計了抽水蓄能電站的容量效益,因為它未能考慮某些月份抽水蓄能電站可能出現的空閑容量。
分享友人