elevation control 中文意思是什麼

elevation control 解釋
高程式控制制
  • elevation : n. 1. 高舉,高陞;【醫學】挺起,隆腫。2. 升級;上進,向上。3. 高尚。4. 高處,高地,高度;海拔;(槍炮的)仰角,射角;【測】標高。5. 【建築】正視圖;立視圖。
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  1. During construction of donghai bridge of yangshan deep - water port, bedrock bench mark, which is an important surveying datum mark, played an important part in control survey and elevation transmission

    摘要基巖標是重要的測量基準設施,在洋山深水港東海大橋的工程建設中發揮了控制測量與高程傳遞的重要作用。
  2. The investigation of downy mildew of off - season cabbage and its pollution - free control experiment were earned out in daxi town with a high elevation, dafang county, guizhou

    摘要2005年,在黔西北地區大方縣達溪鎮進行了夏秋反季節甘藍霜霉病發生危害調查及田間藥劑防效試驗。
  3. Other than paying attension to these areas during the operation, the author believes there are several points for the effective removal of cholesteatoma : 1 ) use of open or open - closed method for mastoidectomy ; 2 ) incision made over some safe site on the cholestratoma sac to remove its content beforehand, which will fascilitate the elevation of matrix after wards : 3 ) exposure of the fallopian canal in the tympanic cavity before lowering down the facial ridge ; 4 ) care be taken of pediatric cholesteatoma ; 5 ) good control of blood pressure and bleeding during the operation ; and 6 ) illumination

    除了特別的注意這些部位外,開放腔或開放后再封閉的手術法,由外而內的將外耳道先行擴大以充分露出術野,大型膽脂瘤囊袋內容物先取出再予剝離,講求顏面神經嵴削低的技巧,以及對小兒例的警戒心,術中出血的控制和照明的良好等,均為防止膽脂瘤殘留的要訣。
  4. With resonable calculating model and dynamic analysis method, the construction control elevation can be decided and so the precompression difficulty of support can be solved in the construction of large - span arched bridge

    採用精確的計算模型和動態分析技術,一次性給出施工控制標高,解決了大跨度拱橋有支架施工中支架需要預壓的問題。
  5. Resurvey the column axis and elevation line, and mark out the column form line, 1 : 2 cement mortar will be used to leveling at the column bottom. “ 井 ” shape rack will be set around each column, and mark elevation control line on it

    將柱軸線、標高線復測投點,彈出柱支模線,將柱腳支模處用1 : 2水泥砂漿找平,每根柱周圍搭設井字架,在井字架上抄測標高控制線。
  6. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  7. Firstly, the three main harmful factors " characters and rules, theirs effect on civil house, demolishment criterion and control measure will be researched systemically. secondly, fuzzy mathematics, system arrangement analytical method and expert consultation method are put forward and discussed specially to set up civil house security fuzzy multi - arrangement elevation model, to evaluate blasting harmful factors " effect to neighborhood civil house ' s safety in the construction of express way, to predict the security of civil house and to bring forward control measures. lately, the forecast of the civil houses " safety by using bp neural net model and optimize of the blasting parameters will also be discussed in the dissertation

    本文的主要研究工作有:系統地研究了爆破地震、爆破飛石、爆破空氣沖擊波三大有害因素的特徵及規律、對民房的影響、破壞判據和控制措施;提出並重點論述採用模糊數學和系統層次分析法及專家咨詢法建立民房安全性模糊多層次評價模型,對高速公路建設中爆破有害因素對鄰近民房安全進行評價,預測民房安全性,提出控制措施;利用bp神經網路模型對民房安全進行預測,並對爆破參數進行優化。
  8. Contents in the article include : u the location theory and method which using the r - d model and earth model without the ground control points ( gcp ) and digital elevation models ( dem ) ; 2

    在沒有地面控制點( groundcontrolpoint簡稱gcp ) 、沒有數字高程模型( digitalelevationmodels簡稱dem )的情況下利用r - d模型和地球模型進行定位的理論與方法。
  9. When the simulation calculation procedure is applied to the rib - hoisting process of nannidu arch bridge, simplification model suited to the case is established, the pre - rising elevation on the rib - hoisting course is predicted, and real - time control is discussed

    將模擬計算程序應用於南里渡特大橋拱肋吊裝過程,建立了適合現場計算的簡化模型,預測了拱肋吊裝階段的預抬標高,並對吊裝過程進行實時控制。
  10. The parametric speed of the curve is firstly approximated by the bezier polynomial which takes the lengths of control polygon ' s edges of the direction curve of normal as bezier coordinates. then the corresponding geometric offset approximation algorithm is given. moreover, an offset approximation with high precision is obtained by degree elevation of the direction curve of normal

    首先利用以法矢方向曲線的控制多邊形邊長為b zier縱標的b zier多項式來逼近曲線的參數速度,給出了相應的幾何等距逼近演算法,進一步結合法矢方向曲線的升階獲得了高精度逼近
  11. The preparations, drilling rig adjustment, pile distribution control, mixing verticality control, elevation measurement, elevation control of pile top and column bottom, curing agent choice and control of mixing speed and blending quantity, must be done well for strengthening soft soil foundation by mixing cement with soil in construction

    在實踐中要做到6點: 1 )調整好鉆機; 2 )控制好柱的分佈位里與攪拌軸的垂直度; 3 )測量好高程; 4 )控制好樁頂、柱底高程; 5 )選擇好固化劑; 6 )控制好攪拌速度和摻加量。
  12. A local elevation of privilege security issue has been identified in the server message block that could allow an attacker to compromise your windows - based system and gain control over it

    現已確認服務器消息塊中有一個本地特權提升安全問題,攻擊者可能會利用此問題危及windows系統的安全並獲取對該系統的控制權。
  13. Based on the existing research achievement, the paper take the elevation of formwork as the objective vector for ann, and raises the construction calculation and control method of objective vector

    借鑒現有的研究成果,確定以立模標高為神經網路的目標矢量,提出了目標矢量的組成、計算和調控方法。
  14. Furthermore, in control part, it owns analysis functions of design ( construction ) completion reasonable states and design ( construction ) segmental reasonable states, elevation of form erection or installation, simulation analysis, foresight of alarm and generalized optimization, among which, design of foresight of alarm will break through the difficulty of non - synchronism of

    在控制模塊中,具有設計(施工)結構合理狀態、設計(施工)節段合理狀態、立模(或安裝)標高、模擬分析、預警及廣義優化等多種功能模塊。尤其對預警設計,率先解決了強度和穩定性不同步的問題,確保施工過程的強度、穩定性安全。
  15. The deflection ' s computation is complicacy when considered the agents included concrete creep. so we should compare the calculation results with design date before construction to find the problem. we should continually adjust the elevation date in construction control to reduce the error

    考慮徐變后結構的撓度計算是極其復雜的,因為它包含了包括混凝土徐變在內的許多因素,而且即使計算出預拱度,在施工之前也應將計算數據並與設計值比較,從而發現問題。
  16. Based on lots of advanced results of computer graphics, modem mathematics, computer science and topography, etc. this thesis discussed the theory, techniques and arithmetic of three - dimensional terrain visualization in three - dimensional gis, such as terrain modeling techniques for digital elevation model, basic theory of three - dimensional terrain visualization, dynamical three - dimensional terrain display with simplified model, and spatial query methods within three - dimensional terrain maps. among these techniques, combined with concrete requirements for visualization in flood control decision - making system, this thesis emphasized on the following aspects : 1

    本文在吸取了計算機圖形學、現代數學、計算機科學、測繪學等眾多領域大量先進理論成果的基礎上,系統的論述了三維gis中地形三維可視化的理論、技術和演算法,包括數字高程模型的地形表面建模技術、地形三維可視化的基本理論、基於模型簡化的地形三維動態顯示技術以及基於三維地形圖的空間查詢技術。
  17. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以最佳成橋狀態作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為最佳成橋狀態法;以斜拉橋主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公式;用最佳成橋狀態法對一實橋工程進行了施工控制全過程計算研究,得到的成橋狀態與設計目標相當接近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
  18. The mark structure contains five parts : protective device, measure shaft, putright equipment, mark - bottom device and ground device, and gps measure pier functioning in elevation control and horizontal layout control is arranged as well

    標體結構包括保護裝置、引測裝置、導正裝置、標底裝置、地面裝置5大部分,並設gps測墩,兼有高程式控制制與平面位置控制的作用。
  19. A research on the application of plc to the ultra - low speed elevation control system

    在超低速升降控制系統中的應用研究
  20. Simple discussion of elevation control on maintainance project for expressway pavement

    淺談高速公路路面維修工程標高控制
分享友人