elevation side 中文意思是什麼

elevation side 解釋
側面圖
  • elevation : n. 1. 高舉,高陞;【醫學】挺起,隆腫。2. 升級;上進,向上。3. 高尚。4. 高處,高地,高度;海拔;(槍炮的)仰角,射角;【測】標高。5. 【建築】正視圖;立視圖。
  • side : n 1 (左右上下等的)邊,側面;(事物內外等的)面,方面;(人、物等的)旁,旁邊。2 〈數〉(三角形...
  1. The elevation or side view is known as a dendrogram.

    立視圖式側視圖又叫樹枝狀圖。
  2. The surface deformation monitoring of the side - wall by combination of the forward intersection method with the analytical trigonometric elevation measurement demonstrates that the plane deformation and vertical deformation of the side - wall are small, and the quality of dam filling and side - wall construction is satisfactory

    用能夠滿足精度要求的前方交會法與解析三角高程測量法結合的方法對邊墻表面變形進行監測,結果表明,邊墻平面位移和垂直位移均較小,大壩填築和邊墻施工質量可靠。
  3. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  4. 178 that is a general ( front, rear, side, left, right, top, vertical, bottom, elevation, auxiliary, cut - away, birds eye ) view

    那是全視(前視、后視、側視、左視、右視、頂視、俯視、底視、立視、輔助、內部剖視、鳥瞰)圖。
  5. In this paper a date from some real projects are used to analyse the facors that will affect the energy dissipation and erosion prevention. such as flood discharge across the cofferdam, crest elevation, downriver cofferdam, roughness coefficient and the gradient of the surface of dam, and so on. in this paper, the program based on hydraulics is checkout by the tankeng waterpower project in zhejiang. the results prove that this program can be used to design any project where there is no obvious side shrinking phenomena

    本文結合工程實際對影響圍堰和壩體消能防沖的各種因素,包括過堰流量、壩面高程、下游圍堰堰頂高程、壩面糙率、壩面坡度等進行了分析,並藉助水力學知識和計算機語言編寫了圍堰和壩體的優化計算程序,並利用浙江灘坑水電站工程對所提出優化計算程序進行了驗證,證明了該程序在沒有明顯的側收縮的影響下,計算結果與實際情況較為吻合。
分享友人