end finish 中文意思是什麼

end finish 解釋
管端加工要求
  • end : n 1 端,尖,末端,終點。2 邊緣;極點,極限。3 結局,結果。4 目的。5 最後,死。6 【紡織;印染】經...
  • finish : vt 1 完畢,完成,結束;使…畢業,使…卒業。2 磨光,【機械工程】給…拋光;給…最後加工;潤飾,修整,整...
  1. By investigation on the relationship between period, quantity, extend of ostrinia furnacalis emergence and meteorological factors in qiqihaer, this paper analyzes the factors which effect on period, quantity, extend of ostrinia furnacalis about annual wave. the beginning time of ostrinia furnacalis pupae emergence depends on average temperature in may and june, weather conditions in july decide whether ostrinia furnacalis pupae finish ahead of time ; the beginning time of eclosion is decided by average lowest temperature and precipitation in may and june, and the end time of eclosion is decided by average lowest temperature in june and july, meantime, the length of time of ostrinia furnacalis eclosion and time of grub emergence influence on the extent of ostrinia furnacalis. an important condition of a great emergence of ostrinia furnacalis is that how temperature matchs humidity, which substantially result in reduction of maize output

    本研究項目通過對齊齊哈爾市玉米螟發生期、發生量、發生程度與氣象條件關系的分析,找出玉米螟發生期、發生量、發生程度年際波動的影響因子: 5 、 6月的平均氣溫決定了玉米螟化蛹開始的早晚, 7月的天氣條件決定玉米螟化蛹是否提前結束; 5 、 6月的平均最低氣溫和降水則決定羽化開始的早晚, 6 、 7月的平均最低氣溫又決定了玉米螟羽化結束的早晚;而玉米螟羽化持續時間的長短和幼蟲發生的早晚影響了玉米螟的發生程度;溫濕條件配合適當與否是促使玉米螟大發生的重要條件,玉米螟大發生又會引起玉米的大幅度減產。
  2. People were at their wits end how to make merry and to finish the night with fitting hilarity

    大家不知道怎樣才能快樂起來,怎樣才能盡情歡樂地度過這一宵。
  3. Production and processing equipment : bearing production equipment, the ball processing equipment, bearing cleaning equipment, packaging equipment bearings, needle roller processing equipment, light jewelry processing equipment, spherical roller processing equipment, rough processing equipment, double - end grinders, spindle, wheel oilstone and other grinding materials, heat production, high - precision coordinates grinder, and outside grinder, seal marking machine, profilometry, contour dynamic analysis, hardness needle - sorting machine, a round instrument, processing tester, processing meter, dynamic vibration and noise analysis, vibration, noise testing device raceway ultra - precision instrument, roughness measuring instrument, the finish detector, sorting machine, converters and bearing products preservatives, lubricants, cleaning agents, such as processing raw materials

    生產及加工設備:軸承生產設備球加工設備軸承清洗設備軸承包裝設備滾針加工設備光飾加工設備球面滾子加工設備毛坯加工設備雙端面磨床電主軸砂輪油石和其他研磨材料熱處理生產高精度坐標磨床內外圓磨床印子打標機輪廓測量儀輪廓動態分析儀硬度針分選機圓度儀加工測試儀加工測量儀振動噪聲動態分析儀震動噪聲測試裝置滾道超精儀粗糙度測量儀光潔度檢測儀分選機變頻器及軸承產品防腐劑潤滑劑清洗劑加工原材料等。
  4. 2, the bearings production and processing equipment signal processing equipment, bearing cleaning equipment, packaging equipment bearings, the bearings production equipment, round instrument, blank processing equipment, double - end grinders, electric spindle and wheel grinding oilstone and other materials, printers marking machine measuring instrument, spherical roller processing equipment, raceway - seiki, roughness measuring instrument, the finish detector converter, hardness needle - sorting machine and new materials, lubricants, preservatives, cleaning agents, testing instruments

    2軸承生產加工設備球加工設備軸承清洗設備軸承包裝設備軸承生產設備圓度儀毛坯加工設備雙端面磨床電主軸砂輪油石及其他研磨材料印字打標機加工測量儀球面滾子加工設備滾道超精機粗糙度測量儀光潔度檢測儀變頻器硬度針分選機及新型材料潤滑劑防腐劑清潔劑測試儀器等。
  5. Midfielder albert celades and goalkeeper cesar will leave real madrid when their contracts finish at the end of the season, the primera liga club said on tuesday

    西班牙皇家馬德里隊中場球員塞拉德斯和守門員塞薩爾,將在本賽季結束后離開其效力了5年的伯納烏球場。
  6. We shall finish the civil work by the end of the year

    在年底前我們將完成土建工作。
  7. Intermediate frequency furnace ? continuous casting billets ? heated by heating furnace ? rough rolling ? head and tail end cutting ? intermediate rolling ? head and tail cutting ? finish rolling ? water cooling treatment ? multiple - length cutting and dividing ? cooling on the cooling bed ? cutting - to - length by cold shear ? collecting and bundling ? to warehouse

    中頻熔爐連續的鑄件鋼坯重復加熱的熔爐粗軋頂端和尾端切斷中間壓軋頂端和尾端切斷完成壓軋水冷處理多功能的長度切割和分段在冷床上冷卻冷卻后冷剪長度聚集捆包運到倉庫。
  8. Taking the worsted tweed pure wool fancy as an example, the influence of fiber, yarn, factors of fabric structure and processing conditions of end - finish to the pilling of worsted tweed fancy are investigated

    摘要以精紡粗花呢純毛織物為例,探討纖維、紗線、織物結構因素及后整理工藝條件對精紡粗花呢織物起毛起球的影響。
  9. Bearings roller bearings and other components. bearing ring precision rolling production line ; a high - precision, super efficient grinding automatic production line ; bearing assembly line ; signal processing equipment ; blank processing equipment ; crowning roller grinder ; end - grinder ; coordinate precision grinder ;, cylindrical grinder ; surface grinder ; spherical roller processing equipment ; raceway grinder ; heat treatment ; needle processing equipment ; polishing processing equipment ; roller - seiki ; rolling auto - sorting machine parts bearing hardness sorting machine bearing cleaning equipment ; contact angle measuring instrument ; contour meter ; bearing life experimental device ; bearing packaging equipment ; roundness instrument ; dynamic vibration noise analyzer ; noise vibration test equipment ; printing machine measuring instrument ; roughness tester ; scanning electron microscope ; finish detector ; inverter ; spindle, wheel, whetstone and other grinding materials

    軸承套圈精密輾擴生產線高精高效磨超自動生產線軸承自動裝配線球加工設備毛坯加工設備凸度滾子磨床雙端面磨床高精度坐標磨床內外圓磨床平面磨床球面滾子加工設備溝道磨床熱處理生產滾針加工設備光飾加工設備滾道超精機滾動體自動分選機軸承零件硬度選別機軸承清洗設備角接觸測量儀輪廓測量儀軸承壽命實驗裝置軸承包裝設備圓度儀振動噪音動態分析儀振動噪音測試裝置印字機加工測量儀粗糙度測試儀掃描電子顯微鏡光潔度檢測儀變頻器電主軸砂輪油石和其他研磨材料
  10. Starting a task as late as possible without delaying the project end date or the finish date of a successor task

    在不推遲項目或后續任務的完成日期前提下,盡可能晚地開始任務。
  11. Finish the monthly financial reports after month - end according to established standards and procedures

    根據制度和程序,在月末完成月度的財務報表。
  12. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面優化方面,本文在利用已經比較成熟的縱橫斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精度,有助於準確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  13. Mrs. hale : i ‘ ll just finish up this end. ( suddenly stopping and leaning forward. ) mrs. peters

    黑爾夫人:我只是把這端縫完。 (突然停下來向前探身)彼得斯夫人?
  14. In the end, the official interior ministry results gave mr. ahmadinejad the second place finish and the runoff spot

    最後,內政部的正式計票結果表明,艾哈邁迪。內賈德獲得第二名,參加決選
  15. After the processing of chromosome image, using then method of tab, we can finish automatic division of chromosome image and get the single chromosomes. in the automatic processing of chromosome division, we can erase impurity and save chromosomes that we will need to label in the end. area, girth, centromer index are important features in identifying the chromosomes

    對染色體圖像進行處理以後,利用標號法實現了染色體圖像的自動分割,得到單條染色體圖像,在染色體的自動分割提取的過程中,可以對雜質實行去除,而保留我們需要用來進行識別的染色體,面積,周長,著絲粒指數是識別染色體的重要特徵。
  16. When you enter start and finish dates for tasks, you force those tasks to begin and end no earlier than the dates you have entered

    如果輸入任務的開始日期和完成日期時,則是強制規定任務的開始日期或完成日期不得早於輸入的日期。
  17. All programs start with the special word begin and finish with end.

    所有程序都用專用字begin(開始)表示開始,用end(結束)表示結束。
  18. All programs start with the special word begin and finish with end

    所有程序都用專用字begin (開始)表示開始,用end (結束)表示結束。
  19. Federer then went on to successfully defend his title, defeating lleyton hewitt in the 2004 final and finish as the year - end world no. 1 with 11 titles

    然後擊敗休伊特,成功衛冕大師杯,以11個冠軍頭銜和年度世界第一結束了2004年。
  20. " if we want to finish third now we will have to produce better performances than that between now and the end of the season.

    「如果我們想取得聯賽第三的位置,從現在起到賽季結束就必須有更好的表現。 」
分享友人