engine-out test 中文意思是什麼

engine-out test 解釋
發動機停車情況下試驗
  • engine : n. 1. 機械,機器。2. 引擎,蒸汽機,發動機。3. 機車,車頭。4. 工具;〈古語〉方法,手段。vt. 給…安裝發動機。
  • out : adv 1 〈位置及運動的方向〉向外,向外部;在外,在外部;出去,出外,離開;離岸,向海面;(船等)開...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. Carry out 15 port and starboard turning test with main engine at 100 % mcr, record its steady turning diameter, time and maximum heeling angle

    在主機滿負荷的情況下作左及右15回轉試驗,記錄回轉直徑、時間及最大橫傾角。
  2. It directly affects the engine ' s working reliability whether it ' s good or not. according to the past method, piston can only be decided whether it meets the need of engineering in test after it has been turn out. this paper simulates the real working condition of piston by combining the ked method and fe - contact analysis way. it reflects deforming rule of piston, and makes it possible that the structure problem of piston skirt can only be found during the design period, so the cost of developing new product is lowered and the time is shorted. this paper proves that the thought is practical and the result of simulation to piston lr4100 is in accord with practice

    活塞裙部形線是活塞的關鍵結構之一,它的好壞直接影響發動機工作可靠性,以往的判定方法只有在活塞加工完成後,才能通過實驗方法判定設計,能否滿足工程實際的需要,本文通過ked方法與有限元接觸方法的結合,模擬實際活塞工作情況,較為準確的反映出,活塞裙部的變形規律,在設計階段發現活塞裙部的設計結構問題,節省新產品開發成本,縮短開發周期。
  3. Other content in this paper is the design and investigation of spiral inlet port. the geometries that compose intake port have been repeatedly when intake port scheme was designed. the intake port scheme has been carried out steady - flow test. the experiment data has been analyzed and investigated, then the performance of inlet port has been estimated by the fluid coefficient and the whirl ratio. at last, the spiral inlet port scheme has been selected based on matching relation of the factors of combustion system. in addition, how to " intake port synthesis performance coefficienf ' evaluate engine intake port has been discussed

    本文的另一項內容是螺旋進氣道的設計和研究。通過對進氣道的幾個主要結構參數進行反復修改擬定進氣道方案,並對其進行穩流試驗,分析和研究試驗數據,利用流通系數、渦流比進行進氣道性能評估,根據燃燒系統要素的匹配關系,確定了兩種螺旋進氣道方案。另外,本文探討了「進氣道綜合性能系數」對發動機渦流進氣道性能的評估能力。
  4. Furthermore, on the theoretics of the balancing machine and associations with the practicalities of the motorcycle crank, it has reasoned out the test principles and mathematic model of the unbalance mass checking device of the motorcycle engine crank set, which is supported by the new method

    提出了新型試驗方法所採用試驗裝置的測試原理和數學模型,並設計出了模型機。模型機正在製造中。第三:得到了一個結論:摩托車發動機曲柄連桿機構的動平衡率等於旋轉不平衡量除以往復不平衡量。
  5. In order to carry out the acoustic and aerodynamics performances tests, seven resonators are designed and made, and a specialized engine intake silencer and exhaust silencers test bench was designed. the tests and analysis are performed as well. on the basis of the intake noise spectrum of sc7080a, a three - parallel - connected resonant silencer is designed, and that has efficiently controlled the acceleration noise of sc7080a

    在此基礎上設計並加工了兩類七個共振型進氣消聲器,研製了發動機進排氣消聲器性能測試實驗臺,開發了發動機進排氣消聲器聲學性能測試軟體,並在該實驗臺上測試了所設計的進氣消聲器靜態工況下的傳聲損失,從實驗的角度研究了共振腔的尺寸、形狀對其共振頻率的影響及其趨勢。
  6. A useful technique has been provided and developed for the researching and analyzing the factors and variation of flow field in the intake duct of diesel engine. to find out a new method to measure flow measurement, different intake duct on different conditions are experimented and researched by real - time holographic interferometry. real - time holography interferometry has many characteristics, such as high precision, non - destructive, high contrast of interference fringes and full field test

    該方法具有精度高、非接觸、條紋對比度好、對被測物體形狀和表面無特殊要求的特點,實驗了對三維非定常流動過程的可視化實時採集,為了解和分析不同流量、不同結構參數下進氣道內氣流運動狀態和流動特性的變化關系及其影響因素提供了一種有效的測試手段。
  7. Therefore, it is necessary for us to conduct a series of principle analysis on different sections of the station such as the fuel system, lube system and cooling system of the diesel engine for generators, and the shaft generator as well as the main switchboard etc. it is also important to carry out at meantime a number of reliability tests and analyze the test results so as to assure all the units of the station will run smoothly

    因此,我們通過對船舶電站中柴油機的供油系統、潤滑系統、冷卻系統、軸帶發電機、主配電板等各個環節從原理上進行分析,並進行必要的可靠性試驗,對試驗數據進行分析,確保船舶電站各個環節的運行良好。
分享友人