environmental acceptance 中文意思是什麼

environmental acceptance 解釋
環境驗收
  • environmental : adj. 1. 環境的,環境產生的。2. 環境藝術的。adv. -ly
  • acceptance : n. 1. 接受;驗收2. 答應,承認;(政黨候選人)接受提名。3. 【商業】承兌,認付(期票)。
  1. The contents of guidebook include : the terms and definitions of night piece illuminating ; basic principle and request ; programming and design ; the night pieces of various illuminating of city facilities and views, such as the building, construction, square, road, the marking of advertisement, park, leisure facilities, dissolve hole and view of water ; the devices of night piece illuminating, equipments with high newly technical application ; power supply and control ; construction and check before acceptance ; the test and the evaluation of the result ; maintenance and management ; environmental protection and the economy energy, etc.,

    指南的內容包括:夜景照明術語與定義基本原則與要求規劃與設計各種城市設施與景觀的夜景照明,如建築構築物廣場道路廣告標志園林與休閑設施溶洞及水景等夜景照明器材設備與高新技術的應用供電與控制施工與驗收效果的測試與評價維護與管理環保與節能等等,並提出了需要注意的問題與解決的辦法。
  2. Article 15 projects for power networks such as transmission, substation, power dispatching telecommunication and automation projects, and environmental protection projects, shall be designed, constructed, inspected for acceptance and put into operation simultaneously with electricity generation projects

    第十五條輸變電工程、調度通信自動化工程等電網配套工程和環境保護工程,應當與發電工程項目同時設計、同時建設、同時驗收、同時投入使用。
  3. Increased landfill costs for steel mill waste residues, stricter environmental regulations and decreasing pubic acceptance of waste dumping is driving the iron and steel industy to apply environmentally balanced solutions on site

    試譯:由於鋼廠廢渣填埋所需的費用增多,環境法規更為嚴格,贊同廢品傾倒的公眾人數減少,促使鋼鐵行業在生產現場應用能與環境保持平衡的解決方案。
  4. Guide for the design, construction, and operation of safe and reliable substations for environmental acceptance

    符合環境要求的安全可靠變電站的設計建造和運行指南
  5. Abstract : procedures and basis of acceptance check of environmental protection in highway constructions are discussed. and the express ways for suggestions of acceptance ckeck are discussed as well

    文摘:探討了公路工程環保驗收的程序、依據及其驗收意見的表述方式等問題。
  6. The temporary trucking scheme is scheduled to be commissioned by january 2004 until commissioning and acceptance of the new permanent marpol waste transferring system between the marine basin and cwtc by the environmental protection department ( epd )

    擬實施的臨時運送計劃,預計於二零零四年一月開始運作,直至位於9號貨櫃碼頭新建的永久海洋污染廢物接收設施投入服務及獲得環境保護署(簡稱環保署)認收為止。
分享友人