erection design 中文意思是什麼

erection design 解釋
安裝設計
  • erection : n. 1. 直立;樹立,建設;設立;架設;【機械工程】安裝,裝配。2. 建設物,建築物。3. 【醫學】勃起。
  • design : vt 1 計劃,企圖,立意要…。2 指定,預定;留給,留著。3 設計,草擬,擬定,籌劃;起草,畫草圖,打(...
  1. Design and implementation of a management information system based on web for examining erection works drawing

    的建築工程施工圖審查管理信息系統設計
  2. This paper expounds some principles that should be followed in the model selection of the outdoor fire cock, and introduces the erection design of the outdoor fire cock

    闡述了室外消火栓選型時應遵循的原則,介紹了室外消火栓的安裝設計。
  3. The type of double cage hoist is scq150 150, scq100 100, and the single hoist is scq150, scq100. its high efficiency, high quality and advanced design has been fully used during the erection of the famous high bridges and building

    雙吊籠型號為scq150 150 , scq100 100 ,單籠型號為scq150 , scq100 .該系列升降機在上海浦東徐浦大橋,江陰長江大橋和廣東虎門大橋等著名大橋的施工中,充分顯示了高效優質的先進性。
  4. Through the calculating example results and the comparisons with other calculating theories, it is proved that the calculating formulas of the combined geometry curve theory is valid, practical and accurate. it can be used in the calculation of line shape at the preliminary design, and can meet the engineering need. ( 3 ) this thesis researches systemically on the calculating theory of the suspension bridge ’ s cable system, including calculating design line shape and internal force, erection line shape of cable and pre - displacement of saddle without loads, the fixed position for erecting cable and amendatory method of cable ’ s unstressed length

    通過算例驗證了混合線形理論公式的實用性和正確性,並且與其它計算理論的結果比較,證明公式有足夠的精度,可用做初步設計中主纜線形的計算,能夠滿足工程的需要; ( 3 )對自錨式懸索橋主纜系統計算理論進行了系統研究,包括成橋線形和內力計算、空纜線形和內力計算、鞍座預偏量計算、索夾安裝位置計算和索鞍處主纜無應力長度修正方法。
  5. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  6. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  7. This paper also makes brief description of the technical specifications, mechanical structure, major features of the italian beam transporting and erecting machine with type of nicola yj - 550, which was introduced firstly in china and chosen carefully in combination with the site conditions. the future beam erection and relevant design and construction can find the reference from description of this paper in terms of erection process for box beam, working efficiency of the italian beam transporting and erecting machine with type of nicola yj - 550, issues and revelations concerning about box beam erection, special beam erection method to avoid three legs supporting

    採用義大利nicolayj - 550型運架梁一體機進行箱梁架設是結合現場實際開展技術攻關、精心選定的施工方法,該型架橋機為國內首次引進,文中就其技術參數、組成結構、主要特點進行了簡要介紹;文中闡述的箱梁架設施工工序、運架梁一體機的作業效益、架梁施工應注意的問題及啟示、架梁施工克服「三條腿」的方法等均可作為今後箱梁架設及與箱梁架設相關的設計、施工工作的參考。
  8. Maerz scope of supply comprises design, engineering, supervision of erection and commissioning as well as key equipment for the mixed gas firing system

    麥爾茲供貨范圍包括:設計工程建築管理和調試以及混合煤氣燃燒系統的主要設備。
  9. Furthermore, in control part, it owns analysis functions of design ( construction ) completion reasonable states and design ( construction ) segmental reasonable states, elevation of form erection or installation, simulation analysis, foresight of alarm and generalized optimization, among which, design of foresight of alarm will break through the difficulty of non - synchronism of

    在控制模塊中,具有設計(施工)結構合理狀態、設計(施工)節段合理狀態、立模(或安裝)標高、模擬分析、預警及廣義優化等多種功能模塊。尤其對預警設計,率先解決了強度和穩定性不同步的問題,確保施工過程的強度、穩定性安全。
  10. Check pipe - hangers, supports, guides, expansion joints, and other pipe specialties for the removal of all shipping and erection stops and for the correctness of cold settings for the design service

    檢查管道吊架、支架、導向架、膨脹節及其它管道特殊件,以除去所有的運輸與安裝附件,確保設計服務冷設置的正確性。
  11. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁橋的鋼箱梁架設技術難題,重點闡述了施工方案,龍門吊、導梁設計,工藝要點等。
  12. Dcs sales manager : college / university degree or above major in electrical engineering ; 3 years work experience in sales and marketing, or design and / or erection and commissioning of dcs or power electrical systems such as generator excitation system, large drives ; inter - personal communication skills ; proficient pc knowledge ; proficient in verbal & written english ; candidates must be highly self - motivated, success driven and ready to travel and take challenges

    人事行政經理:年齡30 - 40歲;大專及以上學歷; 5年以上人事行政管理工作經歷;英語熟練,電腦熟練,具備系統的人事行政專業知識;具有良好的組織管理能力、執行推進能力、溝通協調能力。
  13. Experience in improving the design quality for erection of the drainage pipeline in shaft

    提高立井井筒排水管路安裝設計質量的幾點嘗試
  14. Part three describes the successful application of technical innovation strategy to each period of 15000 oxygenerator engineering management including design, erection and operation / maintenance. some of the technical innovations had been put into effect, which all have solved the actual vital problems of 15000 oxygenerator engineering. some of them even can avoid serious problem from happening a second time, which not only have shortened the time - limit of erection and commissioning, but also played an important role in ensuring the smooth and safely operation of 15000 oxygenerator

    第三部分論述了科技創新戰略在安陽鋼鐵公司15000制氧機工程管理的設計階段、安裝施工階段和運行維護階段的成功應用,許多科技創新,都已經付諸實踐,都是有針對性地解決了安鋼15000制氧機工程中的重大的實際問題,許多創新還可以避免一些重大問題的再次發生,不但縮短了安裝和調試工期並都已在確保安鋼公司15000制氧機安全穩定運行方面起到了重要作用。
  15. In view of very large scale of y - pipes of this project, the design of combined bearing of y - pipe and surrounding rock is adopted to decrease the difficulty of fabrication and erection

    摘要西龍抽水蓄能電站岔管規模遠超過國內已建工程,為降低製作、安裝難度,考慮岔管與圍巖聯合受力設計。
  16. Standard guide for design, fabrication, and erection of fiberglass reinforced plastic chimney liners with coal - fired units

    燃煤單位玻璃纖維增強塑料煙囪襯里的設計,製造及安裝標準導則
  17. This paper presents the design method for a long span concrete continuous girder bridge with precast segments, mixed arrangement of internal and external tendons, and to be constructed with cantilever erection by overhead launching gantry, and also discusses several issues of the type of the bridge in need of special considerations in aspect of design calculations and constructional design

    摘要介紹採用節段預制架橋機懸拼施工,採用體內、體外混合配束的大跨度混凝土連續梁僑的設計方法,對設計計算及在構造設計上需要特殊考慮的一些問題進行了探討。
  18. Self - erection system is applied to construction of most of modern large span concrete bridges. in the process of construction, cantilever beam is changing continuously because of the gravity of concrete, the stretching force, the load and temperature variation etc. in order to ensure that two cantilevers constructing opposite can normally close up and that the bridge linearity can accord with design, flexibility deformation has to be monitored

    現代大跨度混凝土橋梁多採用自架設體系施工,在混凝土自重、張拉力、橋面荷載、溫度變化等的作用下,懸臂梁體處于不斷的變化之中,為保證對向施工的兩端懸臂能正常合攏和控製成橋線形符合設計要求,需要對施工過程中的撓度變形進行監測。
  19. Bolted end - plate connections are often being used in light - steel frame owing to their simplicity and economy of fabrication and erection, and the study about its behavior and design method is more and more being taken seriously

    端板連接節點因其製作安裝簡便和經濟而成為輕型鋼結構中普遍採用的連接形式,其性能和設計方法的研究日益受到重視。
  20. Abstract : this paper mainly deals with the alternative comparison, overall design and critical technical problem analysis of qly50 / 16 full hydraulic girder erection crane designed according to the requirements of wuhu changjiang river bridge and comparison of the same kind of cranes applied at home and abroad

    文摘:介紹了針對蕪湖長江大橋需要設計的qly50 / 16全液壓架梁起重機方案的比選、總體設計、關鍵技術問題的分析,以及與國內外同類產品的對比。
分享友人