  1. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具有結構新、工藝復雜、體積大、運輸困難,將常規鐵路的橋梁廠製造橋梁、經過鐵路運梁到工地、邊鋪邊架進行橋梁製造與架設的傳統施工模式應用到該線是行不通的,必須在現場預制橋梁、並採用專門的運架梁設備進行橋梁架設,因此箱梁的製造、架設施工成為該線施工技術攻關的重點和難點。
  2. The buildings ordinance would be amended to empower bd to effectively cease illegal erection on site immediately

    建築物條例將予修訂,以授權屋宇署即時現場制止僭建工程。
  3. Enhancing building authority s powers to stop erection of ubws immediately on site ; e. upgrading advisory letters to statutory warning notices registrable against the title with the land registry

    五將勸諭信提升為法定警告通知,而這項通知將可在土地注冊處的有關物業業權上注冊。
  4. The main span steelwork was fabricated at shekou in mainland china mainland and assembled on site into units of 8. 7 metres long, the deck slabs being cast on each unit before erection

    橋面主架由鋼製件組合而成,在中國內地蛇口製造及於工地裝嵌成長8 . 7米的組件,並於吊放前,在每塊組件上鑄造橋面平板。
  5. Furthermore, the construction management of the fabrication and erection of the box beam is in complexity for the new workmanship, various procedures, and very special site conditions which should be taken into account so as to achieve the construction objectives in terms of safety, quality, progress respectively. with the various external affections, the working period was extremely tight for fabrication and erection of the box beam by the sixth company limited of fifth china railway group on the qinshen special passenger line, consequently, progress management became the

    因諸多外界原因的影響,中鐵五局六公司在秦沈客運專線進行制梁和架梁施工中都遇到異常緊張的工期要求,施工進度管理成為其施工管理的關鍵,文中重點介紹的網路法組織箱梁製造施工和結合現場實際、分析施工工序、測定作業效率來控制架梁進度的方法對箱梁的製造與架設施工是極為有效的、科學的管理方法,對施工項目的各項管理都有借鑒意義。