erection system 中文意思是什麼

erection system 解釋
垂直安裝系統
  • erection : n. 1. 直立;樹立,建設;設立;架設;【機械工程】安裝,裝配。2. 建設物,建築物。3. 【醫學】勃起。
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. Cable - pulley element in finite element analysis of cableway erection system

    纜索吊裝系統有限元分析中的滑輪單元
  2. Engineering consu - etation of deiegn for coal - fired power dlant, especial in the fields of thermal system, mechanical equipment selection and the lagout and erection of the tquipment and piping in dower plant

    火力發電廠工程設計咨詢、熱機工藝系統擬定及其計算、熱力設備選型選擇、系統及設備的布置和安裝設計。
  3. Design and implementation of a management information system based on web for examining erection works drawing

    的建築工程施工圖審查管理信息系統設計
  4. The roll erection system now comes into play and provides an ever-increasing torque about the pitch axis.

    側擺修正系統開始工作,並繞俯仰軸提供一不斷增加的力矩。
  5. Through the calculating example results and the comparisons with other calculating theories, it is proved that the calculating formulas of the combined geometry curve theory is valid, practical and accurate. it can be used in the calculation of line shape at the preliminary design, and can meet the engineering need. ( 3 ) this thesis researches systemically on the calculating theory of the suspension bridge ’ s cable system, including calculating design line shape and internal force, erection line shape of cable and pre - displacement of saddle without loads, the fixed position for erecting cable and amendatory method of cable ’ s unstressed length

    通過算例驗證了混合線形理論公式的實用性和正確性,並且與其它計算理論的結果比較,證明公式有足夠的精度,可用做初步設計中主纜線形的計算,能夠滿足工程的需要; ( 3 )對自錨式懸索橋主纜系統計算理論進行了系統研究,包括成橋線形和內力計算、空纜線形和內力計算、鞍座預偏量計算、索夾安裝位置計算和索鞍處主纜無應力長度修正方法。
  6. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  7. Roller - type transportation line in common use of diversified suite erection line and finished product packing system, simple configuration and convenient use

    滾筒輸送線常用於各類組立線及物流成品包裝系統、結構簡單,使用方便!
  8. With reference to the cantilever erection of the continuous steel box girder of zhuanxing road overhead bridge crossing shenfengjin expressway in shanghai, this paper mainly describes the application of plc - controlled hydraulic sync jack - up system to the balanced cantilever erection of the box girder, closure construction of the girder at midspan, and the operation, control key points and corresponding technical requirements for application of the system

    摘要結合上海莘奉金高速公路顓興路跨線連續鋼箱梁懸臂架設施工,重點闡述了plc控制液壓同步頂升系統在鋼箱梁「對稱懸拼,跨中合龍」中的應用及操作控制要點、技術要求。
  9. Subjecting to the bridge features, a light - type temporary footbridge and its erection method, a new wire strand hoisting system, a simplified wire compacting machine and a manual wrapping machine are also developed

    根據本橋的特點,開發了輕型貓道及其架設施工方法、新型的索股架設系統、簡易緊纜機和手動纏絲機。
  10. Maerz scope of supply comprises design, engineering, supervision of erection and commissioning as well as key equipment for the mixed gas firing system

    麥爾茲供貨范圍包括:設計工程建築管理和調試以及混合煤氣燃燒系統的主要設備。
  11. First, the article analysis those major problems in front of the national enterprise and cruxes in the erection of the modern enterprise system are based on the analysis of modern enterprise system ' s feature, basic content and objective source. it also provides lots of forms by which national enterprise establishes modern enterprise system and corresponding reformation measures

    首先,在分析現代企業制度的特徵、基本內容和產生的客觀必然性的基礎上,剖析了國有企業面臨的主要問題和建立現代企業制度的難點,給出了國有企業建立現代企業制度的方式和配套改革措施。
  12. Dcs sales manager : college / university degree or above major in electrical engineering ; 3 years work experience in sales and marketing, or design and / or erection and commissioning of dcs or power electrical systems such as generator excitation system, large drives ; inter - personal communication skills ; proficient pc knowledge ; proficient in verbal & written english ; candidates must be highly self - motivated, success driven and ready to travel and take challenges

    人事行政經理:年齡30 - 40歲;大專及以上學歷; 5年以上人事行政管理工作經歷;英語熟練,電腦熟練,具備系統的人事行政專業知識;具有良好的組織管理能力、執行推進能力、溝通協調能力。
  13. The scope of supply of maerz comprises engineering, know - how, license, materials and equipment product discharge system, refractory lining, process air blowers and firing system as well as supervision services for erection and commissioning of the kiln plant

    麥爾茲供貨范圍包括:工程技術訣竅執照原料設備產品排放系統耐熱襯里處理空氣鼓風設備和燃燒系統以及窯建造和調試的管理服務。
  14. Speedy erection system

    快速裝配方法
  15. Self - erection system is applied to construction of most of modern large span concrete bridges. in the process of construction, cantilever beam is changing continuously because of the gravity of concrete, the stretching force, the load and temperature variation etc. in order to ensure that two cantilevers constructing opposite can normally close up and that the bridge linearity can accord with design, flexibility deformation has to be monitored

    現代大跨度混凝土橋梁多採用自架設體系施工,在混凝土自重、張拉力、橋面荷載、溫度變化等的作用下,懸臂梁體處于不斷的變化之中,為保證對向施工的兩端懸臂能正常合攏和控製成橋線形符合設計要求,需要對施工過程中的撓度變形進行監測。
分享友人