estimating factor 中文意思是什麼

estimating factor 解釋
估算因子
  • estimating : 編寫預算
  • factor : n 1 〈英國〉經銷人;(代客買賣收取傭金的)經紀人;代理商;代辦人;〈蘇格蘭語〉 土地經管人。2 要素...
  1. The emphasis in this composition is windshear signal processing technology. some processing methods are introduced in detail, they are suppressing clutter, extracting windshear parameters, computing hazard factor and etc. the signal processing simulation is accomplished on computer, it includes simulating microburst echo signal, simulating ground clutter echo signal, filtering clutter, estimating wind speed and calculating hazard factor. from the simulated results, a dangerous windshear is detected 5o ~ 78s, so the radar performance meets the certification requirements proposed by faa and nasa

    本文重點研討了風切變信號處理技術,對雜波抑制技術、風切變特徵參數提取技術及危險因子計算方法等內容進行了深入的研究,並進行了計算機模擬,包括微下擊暴流回波信號模擬、地雜波回波信號模擬、雜波抑制、風速提取和危險因子計算。
  2. Energy estimating approach of fatigue crack initiation life for welded steel structures is obtained by using molski - glinka energy density equation, introducing the worst - case fatigue notch factor, and considering the effects of residual stress on fatigue

    本文採用應力應變能密度的molski - glinka方程,建立了一種預測焊接鋼結構疲勞裂紋形成壽命的能量方法。該方法引入了極值疲勞切口系數,並考慮了焊接殘余應力對裂紋形成壽命的影響。
  3. Clp ( cell loss probability ) is another main factor in network performance. a method of estimating the clp in an atm ( asynchronous transfer mode ) multiplexer which is fed by a self - similar arrival process is advanced in this paper

    丟失率clp ( celllossprobability )是網路性能分析中的另一個重要指標,本文給出了一種輸入是自相似過程的atm ( asynchronoustransfermode )復用器中估計丟失率的方法,這種方法基於大偏差理論。
  4. Based on the predicting model of effective stress concentration factor, estimating methods of s - n curve for welded steel structures are set up under symmetrical and unsymmetrical stress cycle respectively

    本文以有效應力集中系數預測模型為基礎,分別建立了對稱循環和非對稱循環時焊接鋼結構s - n曲線的理論預測方法。
  5. On the basis of collecting and processing many datum and materials. firstly. this paper analyzes main activities and cost constitutions of each stage of the life cycle of a fcs, and lay a foundation for later analysis and evaluation of system lcc. secondly, a basis method and usage range for estimating the system lcc are introduced. a multivariate linear regression model of pcs development cost and cost driven factor is built by use of the parametric method and supplies the base of cost estimation of newly - developed systems. thirdly, combine actual examples and make statistical analysis of lcc of a certain pcs developed by our institute, predict unhappened usage and service cost with grey prediction method, obtain proportion of each constitute to the lcc. forthly, according to actual conditions, use the fuzzy theory to overall evaluate efficacy of the fcs, fifthly, combimng our actual conditions, investigate specific measures of how to implement the life cycle cost management in our institute and put forward a new conception of developing web - based flight control system lcc management information system with pdm as the platform. at last, investigate important factors such as reliability and maintainability that may affect the life cycle cost of the fcs in detail, and put forward specific methods of lowering the life cycle cost of the fcs

    論文在收集和整理大量資料的基礎上,首先深入分析了飛控系統壽命周期各階段的主要活動以及各階段的費用構成,為以後系統壽命周期費用的分析和評價奠定了基礎;其次,介紹了壽命周期費用估算的基本方法和使用范圍,並利用參數法建立了飛控系統研製費用與費用驅動因子的多元線性回歸模型,為新研系統的費用估算提供了依據;第三,結合實例對我所研製的某型飛控系統的壽命周期費用進行統計分析,運用灰色預測方法對未發生的使用及維修費用進行預測,得出了該系統的壽命周期費用以及各組成部分所佔比例;第四,根據實際情況,首次運用模糊理論對飛控系統的系統效能進行了綜合評價,構造了飛控系統系統效能模糊綜合評價模型;第五,結合我所實際,探討了如何在本單位實施加強壽命周期費用管理的具體措施,提出以pdm為平臺,開發基於web的飛控系統lcc管理信息系統的新構思;最後,對影響飛控系統壽命周期費用的重要因素如可靠性和維修性等進行了詳細地研究,提出了降低飛控系統壽命周期費用的具體方法。
  6. If you are dealing with actions on conveying separating, mixing, estimating and if you aer looking for athe resolving way according to the factor in ecconomic. producing, ecology and the best supporting etc so on, you are just the customer of ours

    如果你處理各種類型的粉粒體物料?輸送、分離、混合、計量和自動化如果您正在根據經濟,生產,生態和最佳配合等因素尋求解決方法?那麼您就正好是我們的客戶。
  7. If you are dealing with actions on conveying separating, mixing, estimating and automation for all kinds of materials, and if you are looking for the resolving way according to the factor in ecconomic, producing, ecology and the best supporting etc so on, you are just the customer of ours

    如果您處理各種類型的粉粒體物料-輸送,分離,混合,計量和自動化-如果您正在根據經濟,生產,生態和最佳配合等因素尋求解決方法-那麼您就正好是我們的客戶。
  8. This paper contains three parts : cost estimating, profit decision and unbalanced bidding strategy. the cost estimaging part introduces the product assembly model and describes how to convert it to assembly logic net. then we use the msps algorithm to weigh the product complexity and get the analogy coefficient to estimate the cost. then we analyze the traits of bidding activity, erecting a profit decision model based on fuzzy set theory. this model can choose the best profit through quantifying quote objects, profit influence factor and candidate profits. then we introduce unbalanced bidding strategy on basis of the traits of the discrete manufacturing enterprise. we take amount, date, cost subjects and technology into account. we change the price of all parts of the product, in order to get more benefit negative influence. this paper introduces the design and implementation of the system

    接下來建立了基於模糊集的利潤率決策模型,以模糊集作為數學依據,量化企業投標目標、利潤率影響因素、投標利潤率三者之間的關系,為投標產品確定最適合的總利潤率,以最大化保證企業投標目標的實現。然後根據離散製造企業的特點,提出以bom為中心不平衡報價策略,從零件的需求數量、需求日期、成本科目劃分以及零件本身的技術難度進行考慮,通過在保持投標產品的投標總價基本不變的前提下,有意識有策略地調整產品各組成部分的報價,以達到既不提高總價,也不影響中標,又能在結算時獲得更理想的經濟效益的目標。
  9. For estimating the power tariff of hydropower project with long construction period, all the following factors shall be taken into account, that is, the inflation factor, the loan interest during construction period, the payable profit repayment and the power price during the operation period

    在測算建設期較長的水電項目上網電價時,要考慮通貨膨脹因素對上網電價的影響、建設期應計利息的劃分、資本金應付利潤的支付、拉平初期運行期電價等問題。
  10. The method of identifying and estimating the factor location effect is the main content of reseatch in the traditional experiment design with complete data ( the observation of experiment is known exactly ). in the standard method the identification of dispersion effects typically requires replications with the fixed factor levels

    在完全數據(即試驗的觀測值無截尾數據)情形下,因子位置效應的鑒別和估計方法是傳統試驗設計的主要研究內容;而對于因子的散度效應鑒別,傳統方法需要在固定因子水平組合下作若干次重復試驗。
  11. First, study the concept and the key technology for dfc and analyze every factor influencing the products " cost within the products " life cycle ; second, set up the estimating model of products " cost based on the function to meet the modem products " design idea of the " top - down ", unifying the products " cost and structure on this functional concept ; third, based on the functionally estimating model of the products " cost, propose two grades of products " cost estimating method based on the function. the method can be used in the cost " estimation in the whole course of product design ; finally, regarding solidworks as the developing platform, delphi as the programming tool, structure a based on function - based products " cost estimating system to tentatively prove the practicability and feasibility of this text ' s estimating method

    第一,研究面向成本設計的概念和關鍵技術,面向產品全生命周期分析影響產品成本的各項因素;第二,建立基於功能的產品成本估算模型,以適應「自頂向下」的現代產品的設計理念,將產品成本與產品結構在功能這一概念上得到統一;第三,在基於功能的產品成本估算模型的基礎上,提出了基於功能的產品成本兩級估算方法,此方法可用於產品設計全過程中產品成本的估算;最後,以浙江工業大學碩士學位論文摘要solidworks為開發平臺, delphi為編程工具,初步構建了基於功能的產品成本估算系統,驗證了本文估算方法的實用性和可行性。
  12. Based on analyzing the math model and running character of motor, this paper educes a method of estimating the real torque of motor by a way of energy conversion. by measuring the stator ' s current, voltage and the power factor of the motor, we can calculate the input power of the motor, and then we can get the electromagnetism power and the real electromagnetism torque

    本文在分析了電機的數學模型和電機運行特點的基礎上,通過測量電動機定子相電壓和定子相電流以及功率因數角的方法,得出電動機的輸入功率,並從電機能量轉換的基礎上,得到電機的電磁功率,由此得到電機的實際電磁轉矩。
分享友人