excavated material 中文意思是什麼

excavated material 解釋
開挖料
  • material : adj 1 物質的(opp spiritual)。2 身體上的,肉體上的;物慾的,追求實利的;卑俗的。3 有形的,實體的...
  1. The material is trucked in dry form, as it comes off the filter, to the mines or excavated areas and dumped.

    物料從過濾機排出后以干物質的形式用卡車運到礦山或挖空處,然後棄去。
  2. 6 three sets of a method statement for the dredging, stockpiling and transportation of sediment ; and the stockpiling and transportation of construction waste and excavated material from within the works boundaries shall be deposited with the director before the commencement of construction of the relevant works of the projects

    在展開建造有關工程之前,須向署長存放3套關于工程界線內沉積物的浚挖、堆存及運送,以及建築廢料和挖出物料的堆存及運送的方法說明,以待批準。
  3. Based on the productive rolling experiments on two material sources of the excavated debris for construction of the downstream side of dam body, the compaction characteristics of the materials are analyzed and the rationality of the related design filling standards are verified, and then the economic and reasonable compaction method, rolling equipments and the construction parameters accorded with the filling standards concerned are recommended as well

    摘要通過對下游壩體填築石渣料的兩個料源進行生產性碾壓試驗, ?解分析其壓實特性,核實設計填築標準的合理性,推薦達到填築標準的經濟合理的壓實方法、機械類型、施工參數等。
  4. 15 all waste materials, excluding river and pond sediment, shall be segregated into categories covering : excavated material or construction waste suitable for reuse on - site, reclamation or fill, construction waste for disposal at public dump or landfill, chemical waste, and general refuse

    除河流及塘底的沉積物之外,所有廢物應予分類,可包括:適合原地再用、用作填海或填料的挖掘物料或建築廢料;棄置於公眾傾卸場或堆填區的建築廢料;化學廢物;以及一般垃圾。
  5. Abstract : in the filling construction of lianhua concrete face rockfill dam, we have paid attention to plan the material sources according to the actual conditions, such as, using the excavated materials in other structures in order to reduce the cost, adopting the measures of filling by zones to quicken the construction progress and solve the construction problems during the cold seasons, using the convenient transportation roads to the dam and good road surface quality to ensure the high intensity filling, and selecting the rational construction equipment to make full use of the all equipment

    文摘:蓮花面板堆石壩填築施工中,注意對築壩料源做出符合工程實際情況的規劃:利用其他建築物的開挖料降低造價;採用分區填築的措施,加快施工進度和解決寒冷季節施工問題;方便的上壩交通道路網和良好的路面,為高強度填築提供有力保證;選擇合理配套的施工設備使設備得到優化利用。
  6. The site was excavated and it was assessed that some potential for archaeological material remains. a watching brief is recommended to fully record this site

    結果顯示這地方有可能還存在古物殘留及建議進行監察以全面記錄這地點。
  7. The stability of high slopes relies directly on the material strength of rock and soil. the strength parameters used in the design are often obtained from the drilling samples before the slopes are excavated

    巖土高邊坡的穩定性直接取決于邊坡巖土材料的強度,常規邊坡設計時往往取邊坡開挖前地質勘探所取天然巖土的強度指標作為設計控制值。