excavated surface 中文意思是什麼

excavated surface 解釋
開挖面
  • surface : n 1 表面;地面;水面;廣場,空地。2 外觀,外表,皮毛。3 【幾】面;切口;【航空】翼面。adj 表面的...
  1. At the same time, the problem from the concrete cracking is effectively solved through the measures such as enhancing the quality of the excavated surface, adjusting the admixing ratio of fly - ash in the concrete, and lowering the temperature rise of the hydration heat

    同時通過提高開挖表面質量,以及調整粉煤灰摻量以降低水化熱溫升等措施,有效地解決了混凝土裂縫問題。
  2. Technology of laying pipeline by guiding drilling of trenchless technology mean a new technological method to control and guide rig to creep into through various kinds of guiding apparatus, lay all kinds of different underground pipelines under the condition of not excavated or excavating few in the earth ' s surface

    非開挖導向鉆進鋪管技術就是指通過各種導向儀控制鉆機鉆進的技術手段,在地表不開挖或少開挖的條件下進行鋪設各種地下管線的施工新技術。
  3. To counter the main reasons of piles ' displacement and inclination, i. e., 1 ) greater lodging after removal of pile cap ; 2 ) inclination of pile frame ; 3 ) driving into ballast course ; 4 ) obvious rolling of excavated mud surface, a set of effective measures dealing with deviation of marine driving are offered

    針對其中影響樁跑位和樁傾斜的主要原因,即: 1 )起帽后樁倒伏大; 2 )樁架不垂直; 3 )碎石層上沉樁; 4 )挖泥泥面起伏大,總結出一套控制水上沉樁偏位行之有效的方法。
  4. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有限元法模擬分析涵洞基坑開挖時,採用分層、分步模擬開挖過程的方法,即將計算域內單元分層「挖去」 ,使開挖表面成為無應力表面的方法,分析土體在卸載狀態時的應力場和位移場隨開挖深度的變化規律;在洞體施工后,回填土體時,據開挖完成時的應力場、位移場,通過逐級增加計算域內的單元數目,施加每級新增加單元的自重荷載,利用有限元法模擬基坑及上覆土體分層填築的施工過程,這不僅反映土體處于再加載應力狀態時,填土受力及變形的一般規律,而且這種將地基? ?涵洞? ?土體作為一個統一整體進行模擬的方法,量化了三者之間的相互作用關系。
  5. It reveals that the slope stability is mainly controlled by a set of joingts nearly parallel to the slope surface with a moderate to gentle dip angel. obvisouly, its persistence ration is the most important factor among all th e charatcteristics related to the stability analysis. on the other hand, the nature slopes and the excavated ones show a series superficial deformation and failure phenomena related to unloading process and time - dependent deformation, which are all described and recorded in detail in author ' s work

    經過現場地質調查發現,邊坡中一組sn向中緩傾角結構面對邊坡的失穩具有控制意義,它的存在導致了邊坡可能的失穩模式為平面滑動,即當坡腳被剝蝕或進行切腳開挖時,發生沿邊坡內sn向中緩傾節理滑移,沿后緣陡裂張開的一種滑動失穩模式。
  6. Surface collapse of coal field is one kind of geological disaster with great hazard, which may result from distortion and breakout of overlying strata that lose their support after underground coal beds are excavated in a large area

    摘要採煤區地面塌陷是由於地下煤層大面積采空引起上覆巖層失去支撐而變形崩落最後導致地面沉降一種危害很大的地質災害。
  7. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊坡工程復雜性和錨固工程的特殊性,待邊坡開挖揭示后,根據邊坡的實際地層巖性,風化程度、破碎程度、構造裂面、坡體結構和含水狀態等因素,綜合校核和分析判斷是否實際,對高邊坡防護加固進行動態設計,確保坡體穩定結構安全。
  8. Abstract : in the filling construction of lianhua concrete face rockfill dam, we have paid attention to plan the material sources according to the actual conditions, such as, using the excavated materials in other structures in order to reduce the cost, adopting the measures of filling by zones to quicken the construction progress and solve the construction problems during the cold seasons, using the convenient transportation roads to the dam and good road surface quality to ensure the high intensity filling, and selecting the rational construction equipment to make full use of the all equipment

    文摘:蓮花面板堆石壩填築施工中,注意對築壩料源做出符合工程實際情況的規劃:利用其他建築物的開挖料降低造價;採用分區填築的措施,加快施工進度和解決寒冷季節施工問題;方便的上壩交通道路網和良好的路面,為高強度填築提供有力保證;選擇合理配套的施工設備使設備得到優化利用。
  9. Based on matlab system, a multi - layer back propagation neural network model was developed, in which the effects of the depth from surface to the tunnel axis, tunnel diameter, groundwater level, as well as the elastic modulus, shear strength, side pressure coefficient and unit weight of soil and the space between excavated wall and lining on the ground subsidence were considered

    採用matlab系統開發了一個多層反向傳播神經網路模型,考慮了隧道的深度、隧道的直徑、地下水位、土的彈性模量、土的剪切強度、土的側壓系數、土的重度和開挖間隙對地表沉降的影響。
分享友人