excavation works 中文意思是什麼

excavation works 解釋
挖掘工程;土方工程
  • excavation : n. 1. 開鑿;發掘;挖掘;挖土,剜通。2. 穴,洞;坑道,開鑿成的山路。3. 【考古】出土文物,發掘物。
  • works : 的印表機描述格式
  1. There are many factors which contribute to the uneven surface of precast paving slabs. this may be due to the heavy loading caused by illegal parking of vehicles on the footway ; improper construction methods and substandard reinstatement works after road excavation

    (二)導致預制鋪路磚表面凹凸不平的因素很多,包括在行人路上違例泊車,以致路面負荷過重;鋪砌方法不當;以及掘路后進行的修復工程不合標準等。
  2. Mole excavation works games - 4455 miniclip games

    鼴鼠挖掘工小游戲- 4399小游戲
  3. Monitoring of government road excavation works

    監察政府的掘路工程
  4. Mole excavation works introduction

    鼴鼠挖掘工游戲攻略
  5. Monitoring road excavation works

    監察掘路工程
  6. Mole excavation works games

    鼴鼠挖掘工小游戲
  7. Bulk excavation works

    大型挖掘工程
  8. Mole excavation works

    鼴鼠挖掘工
  9. Excavation works for the south abutment of bridge no. str06 near the pak kung au

    鄰近於伯公坳的橋編號str06進行南橋墩的挖掘工程
  10. Analysis and control of stratum settlement of shallow - buried concealed tunnel excavation works of urban subways

    城市地鐵淺埋暗挖隧道地層沉降分析與控制
  11. The sha ha excavation was one of the largest archaeological excavation works ever conducted in hong kong. the various cultural phases were deposited with well - stratified sequences. rich archaeological features and finds dated to the late neolithic period c. 5, 000 b. c

    沙下發掘可說是本港有史以來最大規模的田野發掘之一,總發掘面積達三千餘平方米,文化層序清晰明確,出土豐富新石器時代晚期(距今約五千年)及青銅器時代(距今約三千年)的遺跡和遺物,尚有不少漢代和宋明時期的文化遺存。
  12. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東道沿路和前水警總部地底的鐵路隧道,會以鉆挖隧道方式建造,除了在廣東道政府合署現址附近的工地內挖開地面以便興建新車站及引進隧道鉆挖機外,需要在廣東道路面進行的工程規模會很少,以便盡量減少對毗鄰環境的影響。
  13. On 30 october 2003, dlois learnt from a memorandum issued by afcd about the excavation works. upon verification of the land status and land use, dlois had taken immediate action, including erecting warning signs and stone posts along the affected stream to stop any further illegal excavation

    離島地政處於二三年十月三十日收到漁護署的便箋,在查證土地擁有權和用途后,已立即採取行動,包括在受影響河道上豎立警告牌及石柱以阻止任何非法挖掘行動繼續進行。
  14. In general, any person who carries out excavation works without first obtaining an excavation permit from the relevant district lands officer shall be guilty of an offence and liable upon conviction to a fine of $ 5, 000 and 6 months imprisonment

    一般而言,任何挖掘必須事先向該區地政專員申請並獲得挖掘準許證始可進行,否則便屬違法;一經定罪,可被罰款$ 5 , 000及監禁六個月。
  15. Any pond filling works or excavation works within the conservation zones, including " conservation areas ", " coastal protection areas " and " sites of special scientific interest ", in nearly all rural areas in the new territories must obtain the prior approval of the town planning board

    在大部份新界鄉郊的自然保育區、海岸保護區及具特殊科學價值地點等自然保育地帶內進行填塘或挖掘工程,均須事先取得城市規劃委員會批準方可進行。
  16. A government spokesman said today march 30 : " the amended ordinance will encourage better planning and timely completion of excavation works on public roads.

    政府發言人今日三月三十日說:政府希望通過修訂條例,鼓勵有關人士在籌劃公共道路的挖掘工程時會更為周詳,並及時完成。
  17. Meanwhile, the planning, lands and works panel is actively following up the proposed charging and penalty system for street excavation works, which is one of the issues studied in our report on " follow - up review on control of utility openings "

    此外,規劃地政及工程事務委員會現正積極跟進有關掘路工程收費及處罰制度的建議,而該建議制度是委員會報告書中「有關管制公用事業機構掘路工程的跟進審查」此個章節的研究事項之一。
  18. " the highways department has established a dedicated audit inspection team to ensure that road excavation works are properly carried out

    路政署已成立專責審核巡查隊,以確保掘路工程妥善進行。
  19. The contractors are required to set out clearly the manpower arrangements in each stage of the road excavation works in their tenders for such works ; and

    (一)承建商須否在競投掘路工程的投標書內清楚列明每個工程階段的人手安排;及
  20. The potential residual impacts will be insignificant provided that any identified contaminated land will be remediated to the acceptable standards prior to the site clearance excavation works, and the mitigation measures recommended will be properly implemented during the construction stage of the project

    挖掘工程進行前把所有已確定的受污染土地的影響減低至可接受水平和在工程項目的施工期間適當地實行建議的緩解措施,則潛在剩餘影響將並不顯著。
分享友人