extension bay 中文意思是什麼

extension bay 解釋
延伸油箱艙
  • extension : n 1 伸長,伸展,延長,延伸,擴展,擴大;廣度,范圍。2 延期;〈美國〉(房屋的)增建部分,(鐵路等...
  • bay : n 1 (比 gulf 小、比 cove 大的)灣,海灣。2 (山中的)凹地。3 【火箭】凹槽;盤,艙。4 【英軍】戰...
  1. The somali jet and the south china sea ( scs ) cef in the lower level play an important role in the onset of the south china sea summer monsoon ( scssm ). the somali jet is rapidly enhanced two pentads prior to the onset of scssm, thus accelerating the eastward extension of the westerly over the bay of bengal and leading to the eastward retreat of the western pacific subtropical high ( wpsh )

    低層的索馬里和南海越赤道氣流對南海夏季風的爆發有至關重要的作用,在南海夏季風爆發前2候,索馬里急流有一次迅速的增強,這一增強有利於加速孟加拉灣地區西風的向東擴展,並使控制在南海的西太平洋副高東撤;同時,南海越赤道氣流的迅速增強也加速副高的北上,共同促使南海夏季風全面爆發。
  2. Archaeological impact assessment for the extension of the golf course concluded that the bay at wan chai is an archaeological site

    3 . 16高爾夫球場擴展部分的考古影響評估總結得出灣仔的海灣是一個考古地點。
  3. The 36 hectares of land formed at hung hom bay reclamation will be used for private and public housing, commercial development, extension of the existing kowloon - canton railway freight yard, government, institutional and community facilities, schools, open space and road works

    紅?灣填海區內已開拓的36公頃土地,將用作興建私人及公共房屋、進行商業發展計劃、擴建現有的九廣鐵路貨運場、興建政府、團體及社區設施、學校、遊憩用地,以及進行道路工程。
  4. Extension of temporary restricted zones in quarry bay

    魚涌臨時限制區延長實施日期
  5. Road traffic amendment : extension of permitted area for new territories taxis to shenzhen bay port hong kong port area regulation 2007

    2007年道路交通修訂:擴大新界的士的許可地區至深圳灣口岸港方口岸區規例
  6. Road traffic amendment : extension of permitted area for new territories taxis to shenzhen bay port hong kong port area regulation 2007, published in the gazette as legal notice no. 68 of 2007

    2007年道路交通修訂:擴大新界的士的許可地區至深圳灣口岸港方口岸區規例即刊登于憲報的2007年第68號法律公告
  7. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line

    兩間鐵路公司正在落實六項鐵路工程,即西鐵地鐵將軍澳支線馬鞍山鐵路九尖沙咀支線竹篙灣鐵路線和上水至落馬洲支。
  8. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line. these projects are due to be completed in stages between 2002 and 2007 at a total cost of about $ 100 billion

    兩間鐵路公司正在落實六項鐵路工程,即西鐵、地鐵將軍澳支線、馬鞍山鐵路、九龍尖沙咀支線、竹篙灣鐵路線和上水至落馬洲支? 。各項工程預計在二零零二至二零零七年間分階段完成,總投資約一千億元。
  9. Furthermore, this paper illustrated the reason of transition of basin evolution style, i. e. from rifting and extension to uplifting and whole subsidence during dongying movement of bohai bay basin

    巖石圈快速拉伸、上地幔上涌和溫度升高以及殼下巖石圈的彈性回返可以很好地解釋東營運動的形成過程以及渤海灣盆地演化階段的轉折。
分享友人