fill construction 中文意思是什麼

fill construction 解釋
填土工程
  • fill : vt 1 注滿,裝滿,裝填,填充。2 (風)張滿(帆),使(帆背)受風。3 充滿,充實(知識等);普及。4 ...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. I plant product specifications complete, and the quality of sophisticated, divided into three series, a total of over 50 varieties, mainly : stainless steel nets, steel nets, copper networks, different flowers networks, galvanized screen, mine shaiwang, loading, taiban network, whose net investigate network, screens copper network ( brazzaville ), nickel screen ( brazzaville ), i - net, industrial lu : bu, polyethylene, chemical fill network, widely used in petroleum, chemical, construction, textile, pharmaceutical, aerospace, and other industries

    我廠產品規格齊全,質量精良,分為三大系列,共五十多個品種,主要有:不銹鋼網、鋼板網、銅網、勾花網、鍍鋅絲網、礦篩網、輸送帶、鈦板網、電焊網軋花網、窗紗銅網(布) 、鎳絲網(布) 、席型網、工業濾布、無紡布、化工填料網等,廣泛用於石油、化工、建築、紡織、醫藥、航空、航天等行業。
  2. Based on the theory of unsaturated soil mechanics and the properties of compacted expansive soil, this paper takes the northern part k12 + 840 - k12 + 920 of nanning urban highway as an example to studies some aspects of lime improvement of expansive soil and the technology of construction. the chief content of this paper is : the lime improvement mechanism of expansive soil ; confirm the technical parameters of lime mixed from the results of test in laboratory ; the scale - down test to define the maximum effective grain size of expansive soil when it is improved by lime ; by building bank slope model and making use of finite element seepage flow program of saturated - unsaturated to calculate the examples, this paper simulates the humidity site in order to checkout the effect of lime improvement ; studies and proves that it is feasible to mix blocky expansive soil and pulverous lime, and to fill roadbed by common construction machines etc.

    本文研究的工作就下述幾個方面展開:用石灰改良膨脹土的機理;通過室內試驗確定摻灰的技術指標;在室內進行膨脹土摻灰的最大有效粒徑的模擬試驗,即鈣離子水試驗,由此總結出「粉?塊」灰?土攪拌工藝的有效性、合理性和可行性;用數值方法對路堤使用期的濕度場進行模擬,並與路堤的強度?變形的計算域耦合,以檢驗土性改良的效果,從而探索一種描述改良膨脹土路堤運行工況的數值方法;用現有最常用的且費用最低的施工機具,對灰?土進行「粉?塊」攪拌摻和及路基的填築施工等。
  3. The construction bank card that you want to take you and id arrive open an account to fill in all right a piece of registration form that applies for to open the bank on the net, the bank on construction bank net is landed to download individual safety certificate inside 7 days after been deal with, in order to ensure the net hands in easy security, the system can hint you download individual safety certificate automatically, download please and appropriate is custodial certificate of good individual safety, if your individual certificate loses when your reshipment system, so the bank on your net with respect to invalidation, need to debut to the bank afresh

    你要帶上你的建行卡及身份證到開戶行填寫一張申請開通網上銀行的登記表,辦理好了之後就在七日內登陸建行網上銀行下載個人安全證書,以確保網上交易的安全性,系統會自動提示你下載個人安全證書,請下載並妥善保管好個人安全證書,假如你的個人證書在你重裝系統時遺失的話,那麼你的網上銀行就失效了,需重新到銀行開通。
  4. ( 3 ) according to the actual geology situation in the material field, use the " alternation " principle of the value engineering analysis methods, and then find a better construction method to satisfy the requirement of rock - fill material, through using chamber blasting to substitute muffling and using an - fo to substitute ammonium nitrate explosive, and then huge economical benefits were gained, for example, the unit cost of its rock - fill material reduced from 11. 77 m3 to 7. 17 / m3, and directly reduced the total cost by 4. 26 million of cost

    ( : 3 )依據料場的實際地質情況,通過價值工程活動,利用價值分析的「代替」原理,在滿足堆石料功能不變的條件下,採用洞室爆破代替深孔梯段爆破,採用按油炸藥代替錢梯炸藥,使得堆石料的開采成本顯著降低,從投標價的h . 70元/ m3降低到7 . 17元/ m3 ,降低了4 . 53元/ mj ,以上壩堆石料94 . 2萬m 「計,直接降低成本426 . 75萬元,產生了巨大的經濟效益。
  5. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁支護結構」的發展、應用和優缺點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多錨支護進行了結構受力對比分析;第三章介紹該支護結構的設計計算方法步驟,詳細介紹了支護結構各部分的設計方法;第四章介紹預應力錨桿肋梁支護系統最重要的兩個部分:帷幕和錨桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  6. It ' s reflected in four aspects : teaching target, teaching resources, teaching tactics and teaching assessment. the determination of teaching contents is the emphasis, and the teaching contents is determined by teaching target ; the collection of material ( teaching resources ) is the difficulty - compose a script after making a careful study of the teaching material, then collect the material according to the script ; teaching tactics are embodied by the determination of information form and by the way in which the contents accord with the form so as to get the best result in teaching ; making teaching assessment guarantees the quality of the software. in the early making period, the original model method of system engineering is adopted to produce small experimental courseware and a further revision and improvement are made in consultation with some experts. also an agreement on the demand of the software system is reached. in the later making period, the software is appraised by experts from its stability, serviceability reasonableness of construction, and the scientific nature of contents, then it is put into use as an experiment. finally those who use it are required to fill the teaching feedback table

    教學設計理論是靈魂,它貫穿于整個軟體編制過程,從四個方面來體現:教學目標、教學資源、教學策略、教學評價。教學內容的確定是重點,根據教學目標來確定教學內容;素材的收集(教學資源)是難點,在鉆研教材的基礎上撰寫腳本,根據腳本去收集素材;教學策略體現在信息形式的確定,以及如何使內容與形式協調一致,達到教學最優化的效果;而進行教學評價是本軟體質量的保證,在軟體的製作的初期,採用系統工程論的原型模型法,開發出實驗性小課件,在徵求專家的意見的基礎上進一步修改、完善、確認軟體系統的需求併到達一致的理解,在軟體製作的後期,再請專家從軟體的穩定性、可操作性、結構的合理性、內容的科學性等方面進行鑒定,最後將軟體作實驗性投入使用,再讓實驗對象填寫教學反饋信息表。
  7. Abstract : as lanzhou construction areas extend towards gaolan mountains, baita mountains and the valley regions, the problem of environmental control for the made fill & excavation reconstruction project sites becomes more and more obvious

    黃土填挖改造工程場區的環境條件十分復雜,只注重工程建設而忽視環境治理,將危及建築物和工程場地的長期安全。
  8. Research on construction technology of earth and rock - fill dams and tailing dam, soft foundation improvement and aseismatic engineering

    土石壩工程、灰渣築壩技術、軟土地基加固、工程抗震等研究領域取得了富有創造性、具有國際先進水平的成果。
  9. In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province

    本文針對嚴寒地區砼面板堆石壩施工技術研究方面的不足,結合我國黑龍江省牡丹江上的蓮花水電站,面板堆石壩的施工實踐,通過施工的原型實驗,對砼面板堆石壩在嚴寒條件下的施工技術進行了研究和總結。
  10. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  11. Contractors are reminded to segregate inert materials from other construction wastes before separate disposal to public fill and landfill. for construction contracts commencing after july 1999, a trip - ticket system has been implemented to avoid illegal dumping and ensure proper disposal of construction and demolition materials

    所有由一九九九年七月以後生效的建築合約,均規定承建商必須採用新設的運載記錄制度以防止非法棄置建築廢料,並確保它們得到妥善處理。
  12. For the high - class highways builded on the area of lacustrine deposits soft soil, because earth fill of subgrade is very high and construction period is very short, the controlling of subgrade stability and settlement are the two key techniques

    對于通過湖相沉積軟土地區的高等級公路,當路基填土較高、工期較短時,必須解決地基穩定性控制及沉降控制兩個關鍵技術問題。
  13. The construction technologies of cave without top fill and tunnel gate

    明洞和洞門工程施工技術; 4
  14. The rock fill mound has the lowest construction cost, about 9 million for the criii including the cost of rock

    -毛石堆的造價最低,佔中區填海第三期工程約900萬元包括石填料的成本。
  15. The rock fill mound foundation has the merit of simple construction method. after dredging the soft marine clay, the rock fill is then laid into position by barge until the desired elevation is reached

    -毛石堆地基的優點是建造方法簡單,只需在挖走松軟的海泥后,以躉船把石填料投放在適當位置至所需的高度。
  16. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆蓋層上國內首座百米級的混凝土面板堆石壩。
  17. The major activities involved during the construction stage of the project are cut and fill earthworks, slope works, earth retaining walls, irrigation buffer lake, detention ponds and tanks, sand bunkers and golf course capping and turfing

    2 . 3 . 1在工程項目的施工期內,主要的工程活動包括挖填土方工程斜坡工程護土墻灌溉緩沖湖靜水塘缸沙坑及高爾夫球場的加蓋草皮鋪設。
  18. To impose charges on the disposal of construction waste at landfills, sorting facilities and public fill reception facilities

    (一)就棄置於堆填區、篩選分類設施和公眾填料接收設施的建築廢物徵收費用;
  19. 15 all waste materials, excluding river and pond sediment, shall be segregated into categories covering : excavated material or construction waste suitable for reuse on - site, reclamation or fill, construction waste for disposal at public dump or landfill, chemical waste, and general refuse

    除河流及塘底的沉積物之外,所有廢物應予分類,可包括:適合原地再用、用作填海或填料的挖掘物料或建築廢料;棄置於公眾傾卸場或堆填區的建築廢料;化學廢物;以及一般垃圾。
  20. The earth surface of the surface relief low - lying region has been stagnating water all through the year, that effects the stability of the road foundation. through mainly analyzing the treatment of unfavorable geological foundation, this article discusses and settles three questions as followed : l. the treatment and construction methods of soft - soil foundation. 2. the treatment and settlement of high - fill construction foundation

    論文中著重分析了地質不良地基的處理方法,探討和解決了以下三方面問題:一、軟土地基的處治及施工方法;二、高填方路基的下沉與處理方法;三、鶴伊公路地質不良路段地基的處理方法。
分享友人