filter dam 中文意思是什麼

filter dam 解釋
濾水壩
  • filter : n 1 濾器,濾紙,過濾用料[砂、炭等]。2 【無線電】濾波器;【物理學】濾光鏡,濾色器。vt 過濾,用過濾...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  2. It is conclued that the filter layer can protect the core wall of earth - rock dam from flow erosion

    結果表明,寬度不大的裂縫在合適的反濾層保護下,能防止心墻土體被水流沖刷。
  3. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  4. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  5. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站粘土心墻土石壩摻合料的最大幹密度受反濾料與粘土料的摻合比例、反濾料含砂率的影響較大,因此擬通過本試驗確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾料含砂量變化對最大幹密度的影響程度及相關參數,從而確定心墻摻合料填築的實際壓實度。
  6. Application of geotechnical fabric in homogeneous earth dam filter construction

    土工織物在均質土壩反濾體施工中的應用
  7. Is it dam in particle, filter screen of inboard becoming certain to act as, cause imports and exports end pigeonhole difference is it get keep difference at the difference of pigeonholing controller set for to increase, start back flush, after back flush, press difference and return to normal, the filter resumes to filtering the working state normally again

    當被截流在濾網內側的顆粒達到一定程度,致使進出口端的壓差增大到壓差控制器所設定的壓差值時,開始進行反沖洗,通過反沖洗后,壓差恢復正常,過濾器又恢復到正常過濾工作狀態。
分享友人