final acceptance of construction 中文意思是什麼

final acceptance of construction 解釋
竣工驗收
  • final : adj 最終的,最後的,終極的;結局的,結果的;決定性的。 the final ballot 決選投票。 the final caus...
  • acceptance : n. 1. 接受;驗收2. 答應,承認;(政黨候選人)接受提名。3. 【商業】承兌,認付(期票)。
  • of : OF =Old French 古法語。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對高壩洲水利樞紐工程項目實施的研究,論證了高壩洲水利樞紐工程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐工程設計過程的全面管理,充分論證了設計方案的選擇及設計質量的高低,直接關繫到工程項目的投資、質量和工程進度的控制好壞;闡述了高壩洲水利樞紐工程施工過程的全面管理,論述了監理在施工過程中的管理程序和方法,施工單位遵循一定的監理程序,依據施工合同科學合理地完成施工任務;闡述了高壩洲水利樞紐物質設備的采購管理,通過對采購合同內容的論述,明確了物質設備采購時應注意的問題;闡述了高壩洲水利樞紐工程項目驗收及后評價,明確了高壩洲水利樞紐工程項目竣工驗收的內容;較全面地闡述了高壩洲水利樞紐工程項目實施的綜合管理,重點研究了保證高壩洲水利樞紐工程項目順利實施的信息管理、溝通管理、沖突管理和風險管理。
  2. The undertaking organization should carry out the assessment of the occupational - disease - prevention measures before the final acceptance of the construction project

    建設項目在竣工驗收前,建設單位應當進行職業病危害控制效果評價。
  3. Reinforcing inspection procedures prior to acceptance of work not only have we tightened the inspection procedures, we have also enhanced the objectivity in accepting the final inspection and testing results. this is to ensure that the completed piling work conforms with all the contractual specifications before a green light is given for the construction of the superstructure

    加強驗收在打樁工程方面,我們不單止收緊了驗收的規格,也提高了最後驗收測試的客觀性,以確保樁基礎的安裝工程全部符合合約上的規定,才批準建造上蓋工程。
  4. The final acceptance of construction : participated in together by the customer, designer, project supervision, project manager, confirm signing after confirm qualified, pay the fund of tail together

    竣工驗收:由顧客、設計師、工程監理、項目經理共同參與,驗收合格后確認簽字,共交付尾款。