final volume 中文意思是什麼

final volume 解釋
最終容積
  • final : adj 最終的,最後的,終極的;結局的,結果的;決定性的。 the final ballot 決選投票。 the final caus...
  • volume : n. 1. 卷,冊;書籍;【歷史】書卷,卷軸。2. 〈常 pl. 〉大塊,大量,許多。3. 體積;容積;分量,額;【物、樂】音量;強度,響度。
  1. Like hydration, the final effects of fluid and salt depletion depend on the volume of fluid.

    象水合作用一樣,水和鹽分耗竭的最終效應,也是根據液體的容積而定的。
  2. But high strength concrete has many defects itself. mainly foy : with higher strength be much fragility ; the final strength increments are smaller for high volume silica - ash concrete ; because high strength concrete ’ s self - shrinkage is large, so the deformation performance is much severely with the strength increments

    而高強混凝土又有其自身缺陷,主要是:強度越高,脆性越大;摻入硅灰量大的高強混凝土,後期增長減小;由於高強混凝土自收縮大,因而變形性能也隨強度等級的提高而變得嚴重。
  3. Among the three methods used in the experiment of dna extraction, only ctab, adding pvp in the dna isolation step, had effectively reduced the disturbance from fiber or other plastids and extracted suitable genomic dna as template for rapd process. pcr amplifications were performed in a final volume of 25 mm3 containing 0. 5 units taq polymerase, 2

    通過在抽提緩沖液加入2的pvp 、並用異丙醇和乙醇沉澱基因組dna等改良措施, ctab法能避開大量纖維、多糖的影響,有效地從不同屬種的棕櫚科植物的幼嫩葉片中提取並純化了適合rapd的基因組dna 。
  4. Gin is the abbreviation for grouting intensity number. it is showed by the product of the final grouting pressure p ( unit : mpa ) on the grouting section and the grouting volume v ( unit : l / m ) on every one meter of the grouting section, which means the energy consumed on every one meter of grouting section. according to gin method, if during the grouting construction, same energy is consumed on every grouting section, i. e. gin keeps to be a constant, an approximately uniform impervious curtain can be obtained

    Gin ( groutingintensitynumber )即灌漿強度值,它用灌漿孔段上最終的灌漿壓力p ( mpa )和單位灌漿段長度漿液灌注量v ( l / m )的乘積表示,其含義為單位灌漿段上消耗的能量, gin法灌漿認為在灌漿施工中,保持各灌漿孔段上消耗一致的能量,即保持gin為常數,便可形成一道大致均勻的防滲帷幕。
  5. After analyzing the situation and influences of river shipping in jiangsu province, with qualitative and quantitative analysis methods, this paper forecasts the following contents, including the whole cargo transportation lord, the cargo transportation volume, the main bulk cargo volume and the main waterway volume in jiangsu. the final result is the theory basis of jiangsu river shipping strategy research

    本文通過對江蘇省內河航運業發展的實際情況和影響因素分析,運用定性和定量的預測方法,對江蘇省未來內河貨運總量(貨運量、貨運周轉量)發展趨勢以及貨流情況做出預測,為江蘇省內河航運合理定位和發展戰略的制定提供必要的數據和理論依據。
  6. From the information available for the preparation to be assayed ( the “ unknown ” ), assign to it an assumed potency per unit weight or volume, and on this assumption prepare on the day of the assay a stock solution and test dilution as specified for each antibiotic but with the same final diluent as used for the usp reference standard. the assay with 5levels of the standard requires only one level of the unknown at a concentration assumed equal to the median level of the standard

    根據有效的信息制備試驗溶液,指定一個假定的每單位重量的效價或者體積,然後在假設的基礎制備當天儲備液試驗和稀釋溶液作為每一種抗生素指定的效價,但是當使用相同usp參考標準品的最終稀釋液時,試驗應使用平行5的標準要求僅有一份未知的做為濃度等同於中部的標準。
  7. Furniture supplier shall be responsible for final connection of fume hood, canopy hood, vents of acid, flammable cabinets, and shall be communicating with hvac contractor for air exchange volume, air exchange rates to meet lab safety requirement

    實驗室傢具承包商將負責抽風櫃,排風罩和酸堿櫃等排風點的最後連接,並負責和空調及排風系統的承包商確定實驗室區域的排風量,換氣頻率等具體技術要求,確保實驗室的安全。
  8. Once the placement of the main light was final liz ed and the volume of the objects looked right, we placed filling lights

    一旦主光源的位置被最終確定,並且多數物品看起來感覺良好,我們就開始加上補光。
  9. For large volume customers, subsequent to the conclusion of price and volume of products, the company s field application staff will assist customers in the product evaluation until customers agree to the final version and send their purchaser orders to the company in country x. the sales people will then pass the order information to customer service staff of the company for inputting into the computer ordering system

    至於大額客戶,該公司與客戶議定產品定價及數量后,該公司的外勤職員會協助客戶評估產品,直至客戶同意產品的最後版本為止,客戶隨后會發出訂貨單予x國的該公司。營業人員會把訂貨資料通知該公司的客戶服務部職員,以便他們在電腦訂貨系統輸入資料。
  10. The tia final report provided in the cd - rom included in volume two of ifp recommended the implementation of a number of road improvement schemes in the form of a number of localized road junction improvements ( schemes 1c, 7, 8 and 9 ), a new link road between yan cheung road and lin cheung road ( scheme 3 ), a new vehicular underpass along lin cheung road ( scheme 4 ) and an elevated road above the western harbour crossing toll booth and additional slip road leading to west kowloon highway ( scheme 6 )

    載于發展建議邀請書第二冊所附光碟的交通影響評估最後報告,建議實施多項道路改善計劃,包括多條區內道路的路口改善計劃(計劃1c 、 7 、 8和9 ) 、欣翔道與連翔道之間的新連接道路(計劃3 ) 、沿連翔道一條新的行車隧道(計劃4 ) ,以及西區海底隧道繳費處對上的架空道路及通往西九龍快速公路的新增連接路(計劃6 ) 。
  11. In the wkcd traffic impact assessment final report ( tia report ) contained in the cd - rom included in volume two of ifp, an elevated road over the whc toll booth connecting wkcd and providing a slip road leading to west kowloon highway has been recommended for implementation by others

    請澄清,建議者須否根據該交通影響評估報告的建議,在西九龍文娛藝術區內辟設一條車輛通道連接西區海底隧道繳費處上的高架道路,或為辟設這通道作好準備。
  12. The reason is " table ", this kind of expression for information, is so abstract and lopsided that massive valuable information are ignored and final analytic result for traffic management policymaker is one - legged ( statistical figures show : 85 % databases have geographical attribute data, such as urban road, traffic volume, traffic signs and markings and so on )

    造成這種局面的主要原因就在於「表格」這種信息表達方式的抽象性、片面性,忽略了很多有價值的信息,最終給決策者呈現的分析結果不夠全面(統計結果表明, 85的數據庫中含有地理屬性數據如城市道路、交通流量、交通標志標線等) 。
  13. After that, reducing the volume of waste requiring final disposal - the point at which waste to energy incineration can play a part - and ensuring that disposal is carried out in landfills which are designed and managed to contain and treat gases and leachate to complete the strategy.

    我們接著須減少需要棄置的廢物體積,而在這階段廢物焚化能源回收正好發揮作用。最後,我們得確保廢物乃棄置在設計及運作上適合容納及處置氣體和滲濾污水的堆填區內。
  14. The suggested provision of 415 car parking spaces is only a broad indication of the level of parking provision required for the core arts and cultural facilities in the traffic impact assessment final report. the suggestion is derived from surveys carried out on the travel behaviour of patrons of a number of existing arts and cultural facilities in hong kong on the basis of the government s baseline. proponents are required to provide appropriate level of car parking provision according to type and scale of the facilities in their development proposals and their preliminary traffic study pursuant to section 4. 4. 3 ( a ) of volume one of ifp

    西九龍文娛藝術區交通影響評估最後報告建議提供415個停車位,只是就核心文藝設施的停車位供應量給出一個籠統的數字。這項建議是根據政府基線計劃提出,源於對本港現有多項文藝設施的觀眾對交通工具的選擇的調查。建議者須根據其發展建議的設施類別和規模,以及依據發展建議邀請書第一冊第4
  15. The traffic impact assessment ( tia ) final report provided in the cd - rom included in volume two of ifp recommended a number of road improvement schemes in the form of local road junction and infrastructural improvements

    載于發展建議邀請書第二冊所附光碟的交通影響評估最後報告,建議實施多項道路改善計劃,以改善區內道路的路口及基礎建設。
  16. The prediction is made in the volume of grain production, demand and transportation by time sequence p - rediction method. associated with qualitative analysis, it educes the final prediction results

    在預測東北地區糧食的產量、需求量及調運量時,採用了時間序列預測法,並結合定性預測方法,得出最終的預測結果。
分享友人