finished cable中文意思是什麼

finished cable解釋
成品電纜

  • finished: adj. 1. 完成了的,完結了的。2. 精巧的,製作完美的。3. 〈美俚〉死了的;完蛋了的。
  • cable: n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...

※英文詞彙finished cable在字典百科英英字典中的解釋。

  1. The company founded quality quality system certificate of conformity by iso9002 standard districtly. and pass iso9002 quality system certificate of conformity of shanghai auditing center of quality system the truth of our company is creating eternal satiafication by fine product and excellent service. huaqing bare wire power cable control cable purpose jacketed cable insulated wire xlpe cable fire - resistant cable requence - transmitting cable pass each kinds of inspection and appraisement of china and province. each index attain nation advanced level, and gain praise conformably of all consumer, such as power, oil, architecture. originally founded in 1986, qingdao jiaozhou cable co. ltd., whose original name is jiaozhou city cable factory, finished the enterprise reformation and founded the limited liability company in 1998

    公司的前身膠州市電纜廠,是一九八六年建立的膠州市第一家電纜企業,經過多年的努力,企業榮獲了青島市「明星企業」 「百強企業」 「先進企業」 「優秀企業」 「重合同守信譽企業」 ,全國中型電纜行業「質量信譽最佳企業」國家經貿委城鄉電網改造「推薦企業」 ,國家廣電總局「器材入網單位」等多項榮譽稱號及證書。
  2. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江的1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊的地理區位條件和極具代表性的船舶交通管理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段的船舶交通管理探索和實踐。 1984年11月15日當時的長江航政管理局在長江尹公洲水域率先施行交通管制;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通管制段建立現代化交管系統的可行性論證; 1990年大沙雷達站? ?內河第一座雷達交管站建成,摸索實施現代化雷達交管的船舶交通管理新途徑; 1997年長江下游南京至瀏河口船舶交通管理系統建成聯網投入正式運行,同時將大沙交管雷達信號通過光纜傳輸至交管中心,統一實施全轄區船舶交通管理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監控系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  3. The optimization model of the cable tensile force is established, resolving the ideal finished state of considering syntheticly the requirement including the dead load, active load and presress of structure, meanwhile, providing a forward - calculating method for determining the rational construction state on the foundation of the optimization model. on the other hand how to determine and adjust the important parameter, the cable midst tensile forces and the main feam form setting levels in constructing cable - stayed bridge, has also been analyzed, besides, the corresponding calculation method is introduced and applied to the actual construction controlling of xian tao han jiang highway bridge well

    本文以仙桃漢江公路大橋為工程背景在斜拉橋設計計算方面進行了的研究,建立了斜拉橋索力優化模型,一方面解決了能綜合考慮結構恆載、活載及預應力等多方面因素的理想成橋狀態確定問題;另一方面在確定合理施工受力狀態問題上提出了一套以索力優化模型為基礎的正裝計演算法。同時對斜拉橋施工中關鍵參數斜拉索中間索力和主梁立模標高的確定和調整做了進一步的分析,提供了相應的計算方法,並應用於仙桃漢江公路大橋施工控制過程中,取得了良好的效果。
  4. When there are 3 ground wires, they were put between main wire cores, which not increase outer diameter of finished cable

    個地線時分別放在主線芯之間,不增加成纜外徑。
  5. Ugefp and ugefhp cables composed by 3 insulated shielded main wire core and 1 ground wire. finished cable wraped black chloroprene rubber sheath

    個地線組成。成纜后外面擠包黑色氯丁橡皮護套。
分享友人