finished plan 中文意思是什麼

finished plan 解釋
竣工圖
  • finished : adj. 1. 完成了的,完結了的。2. 精巧的,製作完美的。3. 〈美俚〉死了的;完蛋了的。
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. 9 inspect the amount, arrangement, fixing position of the signal equipment ( inspect all kinds of signal equipment according to “ navigation signal arrangement and mast structure drawing ” “ safe drawing ” ( such as signal light, signal shape things, signal flag, pyrotechnic signal, self igniting light of lifebuoy, sound signal etc ) whether satisfy finished plan, and check the qualified certificate of this equipment before and after installation on the ship

    信號設備的檢驗與試驗(按照《航行信號布置及桅桿結構圖》 , 《安全圖》 )檢查各種信號設備(如信號燈、信號形狀用品、信號旗、煙火信號、救生圈的自亮燈、聲音信號等)的數量、布置、安裝位置是否滿足設計的完工圖紙,並在安裝到船上之前和之後檢查這些設備的質量合格證。
  2. Eexploitation actuality : the travelling exploiture plan and stetting up has been finished

    開發現狀:已完成旅遊開發規劃和立項工作。
  3. First, according to different car - following situation, warning distance model and braking distance model are discussed detailed. then according to base function to be achieved, system plan is made, and based on this, design of applying circuit of needed power unit, information collection unit, warning unit and other units is finished. system control program is designed by mcs - 51 language

    根據不同的跟車情況對報警距離模型和制動距離模型進行了深入的探討;然後根據所要實現的基本功能,建立了系統方案,並以此為基礎,進行系統所需的電源、信息採集、警報輸出及其它裝置的應用電路設計;用mcs - 51匯編語言編制了系統控製程序;最後給出了模擬實驗的結果。
  4. On the basis of achieving the national key research projects on sichuan basin carried out from the sixth five - year plan to the ninth five - year plan and in combination with the research results finished by our predecessors, such a complicated problem is discussed from four aspects in considera tion of the exploration situation of the basin and the geological laws of natural gas distribution, and of opening up new realms

    筆者在參與四川盆地"六五" "九五"國家重點攻關項目基礎上,結合前人研究成果,從分析盆地勘探現狀、總結天然氣地質規律、開拓新領域這一思路,從四個方面探討這個復雜問題。
  5. An hour before supper andrew had finished enough of the battle plan to present it to the general.

    到晚飯前一小時,作戰方案已經大致準備就緒,安德魯向將軍交差了。
  6. From 1996 to 1998, as a project manager, i finished the studies on simple constructed venturi water film scrubber desulphurization technology and equipment for small and medium _ sized coal _ fired power plant. such studies are one of the projects required to rack one ' s brain with emphasis by ministry of science and technology in " ninth _ five _ year " plan. on the basis of the aboved researches, being entrusted with jiangxi provencial electric power bureau and guizhou provincial electric power bureau, we conducted the engineering feasible researches and preliminary design for nanchang power power plant and guixi power plant in jiangxi province, guiyang power plant in guizhou province, yongji power plant and taiyuan thermal power plant no. 2 in shanxi province to use venturi water film scrubber simple constructed desulphurization technology. the major technical targets of above consultation are around 70 % of desulphurization rate and improved dust removal efficiencies comparing with original efficiencies. the key features of this new technology are advanced and practical, low in investment cost, small in land occupied, suit for renovating the existing power plant and suited to chinese conditions

    1998年完成了"九.五"國家科技攻關項目< >的開發工作.在此基礎上,受貴州省電力局,江西省電力局,山西省電力局的委託,分別對貴陽發電廠,南昌發電廠,貴溪發電廠,永濟發電廠,太原第二熱電廠等進行了簡易脫硫技術的工程可行性研究以及初步設計等.上述咨詢內容中的主要技術指標是脫硫效率達到70 %左右,並可提高原除塵器的除塵效率.有投資低,佔地面積小,適合老廠改造,技術先進實用等特點
  7. As to self - finished engineering, used internal contract pattern to conduct construction organizing. ( 2 ) network plan technique has been fully introduced to plan management and schedule control, so that can finish constructing tasks according to time and quality

    以內部承包模式對自行完成工程進行施工組織。在計劃管理中全面導入網路計劃技術用於項目的計劃管理和進度控制,以確保按期保質完成施工任務。
  8. Constitute the maintenance plan of the responsible equipment and push it to be finished

    制定所管轄設備的年、季、月度檢修計劃,並督促計劃的有效實施。
  9. Secondly, a ship undocking process environmental forces testing plan is made by using the orthogonal design theory. measuring the environmental forces with different wind, wave and current combination from 0 ? to 90 ? and analyzing and processing the data are finished by using the analysis of variance method. comparing the experimental results with the results calculated using the ocimf method, the reliability of using the ocimf method is testified

    二、利用正交設計方法,制定了船舶出塢過程環境載荷測量方案,完成了船舶在出塢過程中從90到0過程中在不同風、浪、流組合下的環境外力測試和分析處理,利用級差分析方法,重點分析了風、浪、流以及方向對船舶出塢的影響程度大小,並把試驗結果和ocimf方法計算結果作了比較分析,驗證了ocimf方法計算結果的可靠性。
  10. This system has the friendly windows for dialogue between person and machine, can draw and label the plan of each roll groove with the way of parameterization drawing, under the condition that giving the size of the rough blank the specifications of the finished product and the technical parameters of the roll, selecting the minimum consumption as the target function, adopting the optimization, adopting the boundary condition of the grip the strength of roll and the check of the power - generating. moreover, the plan can be outputted in the software of autocad

    本系統具有友好的人機對話界面,可以在給定坯料尺寸、成品尺寸和軋機技術參數的條件下,以能耗最小為目標函數,採用最優化方法,在滿足咬入條件、軋機強度校核、電機校核等邊界條件下優化設計出最優的孔型系統,採用參數化繪圖方法將優化設計結果繪製成孔型圖並進行標注,最終可以向autocad繪圖軟體輸出。
  11. Income tax carries out detailed rules the 54th the 2nd section provision, building, installation, ship - fitter cheng and provide a service, duration exceeds 1 year, can decide the implementation of income by finishing plan or finished workload

    所得稅實施細則第54條第二款規定,建築、安裝、裝配工程和提供勞務,持續時間超過1年的,可以按完工進度或完成的工作量確定收入的實現。
  12. Here is an early plan of castle neuschwanstein, which was built and finished, and the final castle looks even nicer than this early planning model

    這是已經完工了的新天鵝堡的最初設計模型,但實際上建造而成的新天鵝堡要比這個模型上的漂亮許多。
  13. The article has set up a new assignment process on production logistics for the industrial port of wisco ' s finished product wharf, mixing the modernized information technology, especially the abundant applying on computer network, guiding with information, by strengthening the plan of production logistics to improve the passing ability of fished product wharf and steel ' s outbound quality and level, to reduce the inefficiencies assignment of every process in the product logistics, bring down the wastage with effect

    文章構建了武鋼工業港成品碼頭新的生產物流作業流程,融合現代信息技術尤其是計算機網路技術,以信息流為先導,通過增強生產物流的計劃性來提高成品碼頭的通過能力和鋼材外發質量與水平,減少生產物流各個環節的無效作業,有效降低物流損耗。
  14. Manage the timely receipt, materials movement and shipment of raw materials and finished goods. cooperate with production department and purchasing dept. for the production plan and purchasing plan

    管理收據、物料轉移,以及成品和原材料的發送,配合採購與生產制定相關計劃。
  15. On the basis of demonstrating the technical procedure of asphalt concrete mixing plant, the paper uses single - chip computer as the aggregate heated temperature controller. the design plan of the control system is presented. the interface assignment of hardware, the writing and debugging of the control program are finished

    本論文在闡述瀝青混凝土拌和設備工藝流程的基礎上,採用單片機作為瀝青混凝土拌和設備骨料加熱溫度控制器,提出了控制系統的設計方案,完成了介面分配及控製程序的編寫與調試。
  16. Any design change or engineering change of the contracted products will result in a di osal plan of the existing finished goods stock

    供方或需方需要對本協議涉及的產品作設計或工程更改時,需協商處理已有的成品庫存。
  17. Any design change or engineering change of the contracted products will result in a disposal plan of the existing finished goods stock

    供方或需方需要對本協議涉及的產品作設計或工程更改時,需協商處理已有的成品庫存。
  18. In recent years, directed and finished the architectural design of many large and middle scale buildings including suzhou youth travel service comprehensive building, automobile sale and repair center, kunshan lidu hotel ( 10 floors, 3 star level hotel ), zhenjiang yinshan mansion ( 12 floors, commercial office building ), anqing communication bank ( 18 floors ), etc ; presided over the plan and design of some residential quarter and primary and high schools ; presided over the plan and design of the 2nd stage project of yongfengyu paper industrial company in kunshan and the factory area of futai electronic co., ld ; worked on the technical check of architectural design in our institute

    近年來主持完成了蘇州市青年旅行社綜合樓、汽車銷售維修服務中心、崑山市麗都大酒店( 10層,三星級飯店) 、鎮江市銀山大廈( 12層商業辦公樓) 、安慶市交行大樓( 18層)等大中型建築的建築設計;主持了一些住宅小區、中小學的規劃和設計工作;主持永豐余紙業有限公司崑山二期工程,福泰電子有限公司廠區的規劃和設計工作,並從事院里建築設計的技術審核。
  19. Prepare finished goods released plan to qa according to the com. dispatching plan

    根據銷售分貨計劃制定成品放行計劃並通知質量保證部。
  20. Carrying out action plan to achieve targeted quality levels for materials at in coming, in - process stage besides finished goods testing and packing

    執行行動計劃以便達到來料,製成階段以及成品測試和包裝的既定質量標準
分享友人