finishing plant 中文意思是什麼

finishing plant 解釋
后縮聚設備
  • finishing : adj. 最後的。n. 完成修整,精加工;結尾,結束。
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  1. Medium plate plant of chongqing iron & steel has reconstructed technically the original two stand rolling mills ( roughing mill and finishing mill ) and changed dc drive system into ac frequency converter drive system

    重慶鋼鐵集團公司中板廠對兩臺主軋機(粗軋機和精軋機)驅動系統進行了技術改造,將原來的直流驅動系統全部改造成變頻調速驅動系統。
  2. For finishing coat of epoxy floor paint on concrete floor and other concrete surfaces which need to be protected in chemical plant, pulp mill, paper mill, pharmaceutical factory and petrochemical works, etc

    本品用以塗布化工廠、紙漿廠、造紙廠、制藥廠、石化類企業等工廠的混凝土地坪,和其他需要保護的混凝土表面,作為環氧地坪漆面漆。
  3. Combustible : generalgarbage, plant waste, plastics, rubbers, tires, dying and finishing industrial waste, plastic foam, polystyrene, resins, discarded engine oil

    適用行業:民生廢棄物染整業、工廠事業廢棄物、代處理業、公有焚燒廠。
  4. Dafeng city center of the dyeing and finishing plant was founded in june 2006, is a collection of textiles, dyeing, finishing one - stop production of export - oriented enterprises

    大豐市盛宏印染整理廠創辦於2006年6月,是一家集紡織、印染、整理一條龍生產出口型企業。
  5. In year 2005, our new main plant was built in jiading district, shanghai. hugong valve factory has also recently employed 556 people, including 158 technical engineers and 3 senior engineers. we also have more than 10 workshops for precise casting, hot forging and stamping, welding, heat treatment, finishing, machining and assembly

    下設精密鑄造熱鍛壓焊接熱處理精加工裝配等十多個車間擁有數控加工中心等離子焊接機全自動氣體保護焊半自動真空熔焊機超頻真空熱處理車球專用數控車床高效加工專機理化和探傷設備等各類加工檢測設備300多臺套。
  6. Now eagle ottawa china has leather plang ( including finishing & cutting ) and trim plant ( including sewing and wrapping ) are both in the mass production. which both are located in xin zhuang industrial park

    目前中國的皮革工廠(專業生產汽車皮革塗飾與切割)及內飾件工廠(專業生產汽車皮革座套及內飾件包覆)都在正式生產中,兩家工廠均位於莘莊工業區。
  7. Now eagle ottawa china has finished finishing & cutting plant and trim plant is under construction, which both are located in xin zhuang industrial park

    通過應用支持、研究和開發努力創造最優質和奢華的產品,已成為卓越和精良品質的標準。
  8. Abstract : the main problems of hydraulic system of finishing line of plate plant of shaoguan iron and steel co. are analyzed, and the measures of reformation are put forward

    文摘:對韶鋼中板新精整線液壓系統在調試和生產中出現的主要問題進行了分析,並提出了技改措施。
  9. Some $ 4 billion has been committed to finishing a third tunnel to bring water into the city, $ 1. 6 billion to build a badly needed water - filtration plant and $ 13 billion for the most ambitious school - building upgrade ever

    大約40億美元已確定用於完成第三條地道以引水入城, 16億美元用於建造一個急需的污水凈化工廠,還有130億美元用於有史以來最大規模的學校修繕計劃。
分享友人