flood control regulation 中文意思是什麼

flood control regulation 解釋
防洪法規
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • regulation : n 1 規則,規程,規章,條例。2 控制,管理,限制,(情慾等的)節制。3 調整,調節,整頓。4 校準;穩...
  1. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海河流域大清河北支及中下遊河道洪水數值模擬的實際工作中,應用了一維河網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、泄洪閘控制調度以及近年來北方河道入滲的特點等條件,計算效果良好。
  2. Flood control and regulation of the yellow river at lanzhou section

    疏浚整治河道對珠江三角洲東平水道上段的影響
  3. By the turn of the century. the design of various flood control schemes for the river indus is progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    多項梧桐河防洪計劃的設計工作正在進行,預計完工日期可配合深圳河治理工程,目的是在二零零二年或之前,可減低發生水浸的危險。
  4. Protection against flooding is being improved in the area. the construction works for some of the flood control schemes for the river indus are progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    梧桐河防洪計劃多項工程正進行得如火如荼,竣工日期均已訂出,務使工程與深圳河治理工程配合,以期在二零零二年或之前減低水浸風險。
  5. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型試驗,比較分析各防洪整治方案下潼南河段水流條件的變化,及其對上游防洪、河道、大橋、電站、航運、河勢的影響,提出合理可行的工程方案
  6. First the author memorized the yellow river excavation history and concluded development of modern dredging science, and found that most researches of dredging are related to navigation regulation, little used to flood control especially in the yellow river with silty. based on the experiment of generalized physical model of the lower reach of the yellow river, and the study of the loaden flow mechanism and the dredging efficiency, the author get some new ideas as follows : 1

    通過對黃河疏浚的歷史以及現代疏浚工程學的發展進行了回顧和總結,認為已有的疏浚研究大多基於航道疏浚工程,對于防洪疏浚特別是在黃河這種多沙型河流上進行防洪疏浚的研究極為欠缺,本文基於黃河下遊河道概化模型試驗,對疏浚挖槽后水沙運動機理及效果等進行了研究,得到以下認識。
  7. The software greatly improves the precision and efficiency of design flood calculation of middle or small catchment. it has played a important role in the planning and designing of city flood control, river dredging and river regulation, communication

    本軟體大幅地提高了中小流域設計洪水計算的精度和效率,已經在城市防洪、河道整治、道路交通規劃設計中實際運用,發揮了重要的作用
  8. Countermeasures for sediment management in reservoirs regulation for flood control located in the middle yellow river

    黃河中游水庫群防洪調度中泥沙處理對策
  9. On propagation and education of policy - regulation and knowledge of the yangtze flood control

    長江流域防洪法規與防洪知識宣傳教育
  10. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  11. The main conclusions of the research are shown as follows : ( 1 ) with meeting the comprehensive using demands including flood control, ice prevention and water supply of the main stream, aimed at the maximum generation electricity in a period of the reservoir regulation, built up the optimal regulation model of the longyangxia - liujiaxia system and sanmenxia - xiaolangdi system and adopted poa method to solve it, obtained long series compensation regulation results

    論文取得的主要成果如下: ( 1 )在滿足全河幹流防洪、防凌、供水等綜合利用要求的前提下,以水庫調度期發電量最大為目標,採用大系統分解協調方法,建立了龍劉和三小的優化模型,採用逐步優化演算法( poa )求解了該模型。
分享友人