flood gate 中文意思是什麼

flood gate 解釋
潮門
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • gate : n 1 大門,扉,籬笆門,門扇。2 閘門;城門;洞門;隘口,峽道。3 【冶金】澆注道,澆口,切口;【無線...
  1. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某水閘工程在施工過程中擋墻及邊墩產生的裂縫,進行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對建築物的危害程度,提出了相應的控制措施,較好地保證水閘正常運行的功能。
  2. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海河流域大清河北支及中下遊河道洪水數值模擬的實際工作中,應用了一維河網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、泄洪閘控制調度以及近年來北方河道入滲的特點等條件,計算效果良好。
  3. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  4. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘壩、橋梁、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管道、電纜,必須符合國家規定的防洪標準、通航標準和其他有關的技術要求。
  5. A mathematic model is first introduced for optimizing the layout of flood - release structures in a high arch dam after an idea of the broad sense of construction costs for unit area gate is introduced, and the optimal computation of the layout of flood - release structures in xiao - wan arch dam demonstrates that this model is reasonable ; 4

    在引入了閘門廣義單位面積造價的基礎上,首次建立了高拱壩壩身泄洪建築物布置的數學優化模型,並通過對小灣拱壩壩身泄洪孔口的優化布置計算,說明所提出的數學優化模型是可用的; 4
  6. It is necessary to plan flood control and waterlogged elimination, calculate and analyse the size of water gate, as well as to bring forward the reasonable and feasible running way

    要解決好圍塗工程中的防洪除澇問題,必須做好全流域范圍內的防洪除澇規劃和圍區規劃工作,計算、分析並確定水閘規模,最後提出合理可行的水閘運用方式。
  7. Abstract : this paper summarizes a series of tests and inve stigations on general layout, const ruction diversion, flood disposal, navigation, river closure, form of gate opening s ection, pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results

    文摘:綜合闡述了珠江水利委員會科學研究所從1983 ? 1998年間對飛來峽水利樞紐的整體布置、施工導流、泄洪、通航、截流、閘孔斷面形式、閘下消能形式、閘下沖刷等所進行的一系列試驗和研究工作,並介紹主要試驗研究成果。
  8. Research and development of automatic water flood prevention gate

    自動防水閘門的研製開發
分享友人