floor plane 中文意思是什麼

floor plane 解釋
底平面
  • floor : n 1 地板,地面。2 (樓房的)層。3 (船底的)肋板。4 (海洋、山洞等的)底。5 議員席;經紀人席。6 ...
  • plane : n 懸鈴木屬樹木。n 1 平面,水平面,面。2 (知識等的)發達程度,水平,階段。3 【航空】機翼面;〈常 ...
  1. The building located in the tianjing dagon power station and us floor plane means a eleetron maik

    該工程位於天津大港發電廠內,建築的平面構思為一個電力符號。
  2. An indonesian navy commander says ships searching for a missing passenger plane have found metal objects on the sea floor

    印度尼西亞海軍的一名指揮官說,搜尋失蹤客機的船隻在海底找到了一些金屬物件。
  3. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  4. Textile floor coverings - tiles - determination of dimensional changes due to the effects of varied water and heat conditions and distorsion out of plane

    鋪地織物.磚.因濕度和溫度變化及表面扭曲引起的尺寸變化的測定
  5. Imitate the old floor in the style of the ancients : adopt wood assortments such as birch, oak wood, color wood, elm to be base material, by that the manpower surface plane is sure to process the roughness handling the different in soaking various colour and lustre of forest paint, reaching

    仿古仿舊地板:採用樺木、柞木、色木、榆木等材種為基材,經人工表面刨切加工處理在浸林各種色澤不同的油漆,達到凹凸不平。
  6. The men were on their way up the north tower of the centre, close to the 70th floor, when the first plane struck at 8. 47am. " we felt a muted thud, " shivam iyer told the new york times. " the building shook

    在9月11日世界貿易中心遭到恐怖襲擊后,一名玻璃清洗工用手中的清洗工具的金屬刃口鑿穿了電梯井的墻壁,從而使與他一道困在一部電梯內的5名男子得以逃生。
  7. The research object in this text is the actual project - - the mansion of yatingyuan ( 40 layers above the ground, 125. 4 meter high ). the structure - design is by satwe and the analysis of the structure dynamic characteristic and earthquake response by sap2000, whose calculation models are set up according to the actual size of the structure. in satwe, the analysis model of beam and column is simulated by frame - element, slab is plane - element, shear - wall is wall - element and slab is infinitely rigid in the internal and zero in the external ; in sap2000, beam and column is frame - element, slab and shear - wall is shell - element and slab is elastic floor

    本文以實際工程項目? ?雅庭園商業中心大廈(地面以上40層,建築總高度為125 . 4米)為研究對象,結構設計採用satwe ,結構的動力特性和地震反應分析採用sap2000 。結構satwe和sap2000分析的計算模型均按結構的實際尺寸建立, satwe分析模型的樑柱採用桿元模擬,樓板用薄壁殼元模擬和剪力墻用墻元模擬,樓板平面內無限剛、平面外剛度為零; sap2000分析模型的樑柱採用桿元模擬,樓板和剪力墻用殼元模擬,樓板為彈性板。
  8. According to the special stratum condition 、 soil parameter 、 pile frame system in the protecting landslide of hongtian jianfeng in yongan city in fujian province, compile a fem program of plane strain and analyze the interaction by nonlinear fem on intensity discount. in the program, duncan - chang model is applied to earth, elasticity model is applied to pile and rock ; goodman element is set between pile and rock - earth and applied to simulate sliding plane and flexible floor ; sequential pole elements with original stress are applied to anchor cable

    在程序中土體採用了duncan - chang雙曲線本構模型,樁和錨固層以下的巖體採用了線彈性本構模型,並且在樁和巖土體間設置了無厚度的古德曼( goodman )單元,對于軟弱夾層和已知的滑裂面也採用古德曼單元模擬,錨索採用的是具有初始應力的連續桿單元模擬。
  9. On the basis, three elastic calculation coefficients of the two - way composite slab on three common boundary conditions are deduced and calculated by applying the classic elastic plane theory. in the thesis, the elastic design methods of pk prestressed composite two - way slab is explored and studied by the example. furthermore, it is also studied how to apply the yield - line design method to design the prestressed two - way composite floor slabs

    本文以此為依據,應用經典彎曲薄板理論,採用李維法推導和計算了這種雙向樓板三種常見邊界下的撓度和內彎矩彈性計算系數,並在此基礎上通過算例探討了pk預應力雙向疊合樓板的彈性設計方法,同時還對其塑性鉸線設計方法進行了研究。
  10. But fate intervened in september, when yoichi was one of 2, 823 people killed after two hijacked planes slammed into the twin towers of the world trade center and destroyed them. although yoichi had left his office high in the south tower after the first plane struck the other tower and evacuated to the ground floor, he went back up following an announcement that it was safe and was there when the second plane hit

    當時譽市正在世貿大樓中的北樓辦公,當第一架飛機撞到南部大樓的時候,他本來已經平安到達地面一層,但是當警報解除后,他又回到了樓上辦公室,誰知就在那時,第二架飛機撞向了他所在的北樓
  11. 3 - wire strands with tensile strength of 1570 mpa were collocated in the lower precast concrete slabs of superposed floor. the manner of reinforcement lap and other detailing were brought forward. plane dimensions of the tested floor are 9m and 12m, and height is 180mm

    本論文通過對前期試驗的分析總結,選用1570mpa的三股鋼絞線作預制底板的預應力鋼筋,提出了合理的板側橫向鋼筋搭接方式和其它構造措施,並按照現行規范設計並製作了試驗結構,樓蓋平面尺寸9 12m ,樓板厚度180mm 。
  12. Indonesian navy detects metal on ocean floor in search for missing plane

    印尼海軍尋失蹤客機探到海底金屬物
分享友人