formwork system 中文意思是什麼

formwork system 解釋
板模系統
  • formwork : 模板;模架
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. Reduce the use of timber by using alternative structural solutions ( e. g. metal hoarding, system form - work, metal form - work, semi - pre - cast flooring system, pre - cast roofing, dry walls and other structural means such as steel structural section, left - in formwork, etc. )

    改用其他結構方案(例如金屬圍板、標準化模板、金屬模板、半預制樓板系統、預制天面、干墻及其他結構措施,如鋼造結構架和內留的模板等) ,藉此減少使用木材
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. The prestressed concrete ( pc ) track girders of straddle - type monorail transit system carryies both the beams and the tracks on which the train runs, so the fabrication must make use of a special formwork because of its high precision

    摘要跨坐式單軌交通系統的預應力混凝土軌道梁既是承重梁又是車輛的軌道,其製作精度要求很高,必須採用專用的模板。
  4. Based on the assembling process analysis, the system engineering analysis to the construction formwork assembling machine was applied

    在仔細分析了建築模網裝配過程的基礎上,對模網裝配機進行系統工程的設計分析。
  5. The structure system of non - demoulding formwork board and shear wall are a new type structure resisting seismic. the development of which is to acquire a construct system instead of tradition brick masonries

    免拆模板及其剪力墻體系是一種節能的新型抗震結構體系,它的提出旨在找到一種替代傳統的磚混結構的建築體系。
  6. To evaluate the safety of fastener - style tubular steel formwork - support ( ftsf ) in project management, a safety assessment of multi - level and multi - attribute system was established on the basis of consultation with a number of ftsf experts

    為了評估現場扣件式鋼管支模架的施工風險,設計了一套多指標多層次的扣件式鋼管支模架的施工風險評估系統。
  7. The fourth chapter is the main introduction of the system use means of the making system, consisting of the creation of the manipulation guidance and formwork, the creation of teaching material composition, the design of the self - defining formwork, how to skim through the teaching material, how to educe the teaching material,

    第四章主要介紹製作系統的使用方法,包括操作向導與模板的創建、教材結構的創建、自定義模板的設計、如何瀏覽教材、如何導出教材、如何封裝教材、如何發布教材、幫助系統的使用以及製作系統在使用的過程中常見出現的問題及解決方法等。
  8. This paper mainly describes the constructions of the formwork which is used in the monorail transit system in chongqing, and indicates that during the track girders ' fabrication, it is very important to pay attention to steel fabrication, orientation of conduct for tendon passing, the mixing, molding and maintaining of the concrete and the stretching of the prestressed tendon

    介紹了重慶市單軌交通系統中的預應力混凝土軌道梁模板的構造,並闡述了在軌道梁製作過程中應重點做好鋼筋製作、預應力管道定位、混凝土拌制、成型、養護及預應力筋張拉等工序的工作。
  9. The multi - medium teaching material unified making system is composed of the rich variable and function supplied by authorware6. 0, and unites other external functions ( ie. *. u32, *. dll etc. ) and control pieces, and is also a authorware6. 0 source file that integrates the guide, teaching material and formwork

    《多媒體教材製作系統》是一個利用authorware6 . 0所提供的豐富的變石頁士學位論文mast丁二r 』 s日if從l凡量、函數,結合其它的外部函數(如* . u : 32 、 * . dll等) 、控制項等編寫而成的,它是一個集向導、教材和模板於一體的authorware6 . o源文件。
  10. For example, a drywall partition system was used instead of the conventional brick construction and leave - in metal formwork used for the concreting of floor slab

    此項目大量應用低廢料量技術,包括採用乾墻間隔系統取代傳統磚墻結構,地臺灌漿亦使用了內留模板。
  11. In 1999, 5 schools in tseung kwan o successfully used " system design formwork " and substituted the traditional timber formwork with precast construction and metal formwork

    一九九九年,將軍澳共有5間學校成功採用系統設計板模,並以預制方式和鋼模取代傳統的木板板模。
  12. In the construction of residential quarters at lee on road which has a repetitive floor plan, system aluminium formwork instead of the conventional timber formwork has been adopted

    在利安道宿舍的工程中,因為每層的平面圖設計相同,所以採用了系統式鋁模,以取代傳統的木板板模。
  13. Adopting modular designs and state - of - the - art construction methods, including the use of prefabricated components and system build formwork

    採用系統建造設計及現代化建築技術,如預制組件及標準組件模板等。
分享友人