forward pivot 中文意思是什麼

forward pivot 解釋
向前傳球
  • forward : adv 1 向前,前進 (opp backward)。2 【航海】在船頭,向船頭(opp aft)。3 今後,將來。4 出來,出...
  • pivot : n 1 【機械工程】交樞,樞軸,支軸,磨經〈磨的回轉軸〉;【物理學】支點,支樞;扇軸兒。2 樞要,中樞...
  1. A single pylon design, which features forward and aft sway braces, an aft pivot, electrical connections, and fuel and air connections, is used

    單塔設計的,其特點是前進和背蕩蕩背帶,背一個支點,電氣連接,燃料和空氣連接器
  2. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  3. The sprouting newborn shanxi buckwheat industry urgently needs a sturdy strategic pivot and the explicit development direction. that means to strengthen the proprietary intellectual property rights consciousness, to sharpen the independent innovation ability and diligently to carry forward to competitive advantage industry goal

    正在萌發新生的山西苦蕎產業,亟需一個牢靠的戰略支點和明確的發展方向,這就是? ?強化自主知識產權意識,提高自主創新能力,努力向競爭優勢型產業的目標推進。
  4. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
分享友人