forward prediction 中文意思是什麼

forward prediction 解釋
正向預測
  • forward : adv 1 向前,前進 (opp backward)。2 【航海】在船頭,向船頭(opp aft)。3 今後,將來。4 出來,出...
  • prediction : n. 1. 預言,預告。2. 被預言的事物。3. 【氣象學】預測,預報。
  1. In consideration of the crises of both the industrial water and the domestic water in the estuarial areas of the yangtze river caused by the decrease of the channel runoff and the intrusion of the sea water during the dry season in dry year, the concept, method and planning framework of the water resources allocation for the areas mentioned above along the main stem of the river are put forward herein based on the preliminary prediction of the future water demands by taking the water resources allocation therein during the dry seasons as the actual case in combination with the status quo of the water environment and water resources utilization concerned

    摘要針對枯水年枯水季,因河道徑流量較少,鹽水入侵的頻率和強度顯著提高而引起的長江河口沿岸地區生產生活用水安全,文中結合長江口地區水資源利用和水環境現狀,以大通以下長江幹流地區在枯水季水量分配為實例,在初步預測未來河口地區水資源需求的基礎上,提出長江口地區水資源配置的思路、方法及方案框架。
  2. This paper puts forward bp improvable algorithm and exponent prediction pattern depending on neural network " s approach ability to non - linear function. comparing with traditional prediction algorithm, bp algorithm is verified to be feasible and accurate on exponent prediction

    本文藉助神經網路對非線性函數的逼近能力,提出了bp演算法的改進型演算法及基於bp演算法的指數預測模型,通過對比傳統預測演算法,證實改進后bp演算法用於證券預測的可行性及準確性。
  3. Thus this paper puts forward the dynamic time series period analysis and prediction model. it combines the basic principle of the stepwise regression period analysis to the multiplayer - transfer method. it can not only effectively select every latent period of a time series, but also take advantage of the selected latent periods to make a long - term prediction

    因此本文提出了動態時間序列周期分析預測模型,它是將多層遞階方法與逐步回歸周期分析的基本原理相結合,使之既可以有效地選取時間序列的各個隱含周期,也可以利用所選取的隱含周期作較長的時間預測。
  4. She adapted the regional climate model from the experimental climate prediction centre ecpc of the scripps institution of oceanography. visitors from ecpc were all impressed by her ability and commitment, and in turn by the observatory s commitment in taking forward seasonal forecasting using the ecpc s regional climate model

    該大學氣候實驗預測中心的人員來訪天文臺時,莫不稱贊她的才幹和毅力,亦肯定了天文臺不遺餘力地把該中心的區域氣候模式應用於季度氣候方面的貢獻和決心,提升部門在國際氣候模式和水文學界的形象。
  5. As to planar visco - elastic prediction of settlement, this paper fixes on range of the back - calculation parameters range, analyzes back - calculation parameters which are indispensably in the course of anti - analysis. since it is difficult to acquire the optimization result in simultaneous back - calculation, this paper puts forward a calculation method which combined with investigation data and field experiment data to minimize the parameters to get optimization

    ( 2 )針對二維粘彈性沉降預測,確定了模型反演參數的取值范圍,對于多層軟土地基變量同時反演很難獲得最優解的問題,提出結合工程勘察和現場實驗以減少參數的方法獲得最優解。
  6. The third section of the essay, analyzes the distributing law of passenger flow of public traffic, brings forward a new prediction method which could keep accordance to the practical distributing law of passenger flow by and large, furthermore, could meet the demand of optimizing bus dispatch system. this method based on intelligent technology breaks through the traditional way

    第三部分研究了城市公共交通線路日客流量分佈規律,提出了一種可操作性的、能在總體均值上符合線路客流客觀變化規律、可滿足以城市公共交通線路調度為目的和以此為精度要求的城市公共交通線路每日客流量預測方法。
  7. On the base of summarizing and evaluating chinese soil erosion models, this paper brings forward future developing directions that the soil erosion models should pay attention to : ( 1 ) paying attention to the theory researches of soil erosion models, consummating from erosion factors basis erosion prediction to erosion processes quantity and theory researches, studying each erosion factor and its interaction impact on erosion processes, and sediment dispersion, transportation and deposition action on complex slopeland, as well as different catchments scales ; ( 2 ) reinforcing the study of gravitation erosion and cave erosion mechanism, and big and middle scale catchments erosion models ; and ( 3 ) making the best of advanced rs and gis technology, providing plentiful datum for erosion models researches, making and for soil erosion models checkout

    在總結和評價中國土壤侵蝕模型的基礎上,提出了今後土壤侵蝕模型應該注重的發展方向: ( 1 )注重土壤侵蝕模型的理論研究,將從以侵蝕因子為基礎的侵蝕預報向侵蝕過程的量化研究和理論完善,研究各侵蝕因子及其交互作用對侵蝕過程的影響,泥沙在復雜坡面以及不同流域尺度間的分散、輸移和沉積作用; ( 2 )加強對重力侵蝕、洞穴侵蝕機制的研究,加強對大中流域侵蝕模型的研究; ( 3 )充分利用先進的rs 、 gis技術,為侵蝕模型的研究提供大量的數據源,以利於對土壤侵蝕模型的檢驗。
  8. Based on the analysis of the characteristics of the raw mix slurry preparing process in alumina sintering production process, firstly, a mechanism model based on material balance principle was established as the master - rule model for the quality prediction ; secondly, considering the problem that the alkali liquor composition was unstable and its real - time measurement was difficult, a nn ( neural networks ) prediction model for the prediction of the alkali liquor composition was set up and nesting - integrated with the mechanism model ; finally, using the gray theory for the information mining from the errors of the mechanism model, a gm ( 1, 1 ) compensation model was put forward and parallel - connection - integrated with the mechanism model, achieving a raw mix slurry quality prediction model

    摘要針對燒結法氧化鋁生產過程中生料漿配料工藝的特點,根據物料平衡的原理建立機理模型,作為生料漿質量預測的主規律模型;針對堿液成分波動大且難以實時檢測的問題,對堿液成分含量建立了神經網路預測模型,並和機理模型進行嵌套集成;利用灰色理論對機理模型的偏差數據進行信息挖掘,建立了gm ( 1 , 1 )補償模型,並與機理模型進行並聯集成,獲得生料漿質量預測模型。
  9. Creep life - prediction model was put forward from creep experimental results

    由蠕變數據得到蠕變壽命預測模型。
  10. This paper introduces the evolution of analytic tools for viv response of slender marine structures, and then put forward a prediction model for viv of a slender riser in which fluid force coefficients obtained in forced oscillation tests are applied more directly than other similar models

    文中介紹了細長海洋結構物渦激振動預報工具的發展,進而提出了一種基於圓柱體受迫振蕩實驗數據的預報模型。
  11. This paper narrates the meaning of research in the applied field of prediction for the ultimate bearing capacity of the integrate pile, introduces several typical predication methods for the ultimate bearing capacity of pile, and gives the way for making model. one of them is the partial least - squares regression method which is put forward by me with the help of mathematics knowledge. the method can offer full range analysis for the ultimate bearing capacity of pile

    本論文主要內容敘述了預測法在完整樁極限承載力中應用研究的意義,引入幾種典型的預測法對樁極限承載力進行預測,闡明了模型的建立方法及過程,其中偏最小二乘回歸預測法是本人藉助數理知識提出的一種新的預測法,用此法可以對樁極限承載力進行全過程分析,本論文最後用marc軟體進行模擬模擬預測,進一步實現了預測的實用性。
  12. The key to prediction of casting shrinkage / porosity lies in ascertaining the critical value of temperature gradient and niyama criterion. the thesis put forward two methods to ascertain the value, one is which is positive - direction and the other is negative - direction. we verify the realistic arithmetic of temperature gradient method and niyama criterion method by experiment, and we can draw a conclusion that the arithmetic is correct and reasonable in most cases and choice of developing tool is sound

    臨界梯度值和新山判據臨界值的確定是實現縮孔縮松預測的關鍵,本文提出了確定臨界值的正向法和反向法,並以高鉻鑄鐵件縮孔縮松預測和鑄造工藝改進為研究對象,應用正向法,確定了溫度梯度法的臨界值為180 m 。
  13. On the basic of the detailed analysis on main causes and main prediction methods of casting shrinkage / porosity, we put forward two methods to describe the solid phase rate of materials solidification. one is liner - distributing method, and the other is parabola - distributing method. and then, we apply the former to the system

    本文在充分分析鑄件縮孔縮松產生機理與主要預測方法的基礎上,提出了材料凝固固相率的線性分佈法和拋物線分佈法,並將前者應用於系統中;同時提出了溫度梯度法和新山判據法的實現演算法,此演算法具有一定的靈活性。
  14. It is necessary to make more profound research in the field of settlement prediction. in this dissertation, on base of the existing work, the three - point method which is the mostly used method in the settlement prediction has been studied thoroughly firstly, which indicated and discussed the deficiency of the three - point method, and as a result an improved three - point method was put out ; secondly, by analyzing the characteristics of the process of the foundation settlement we put forward the model for predicting foundation settlement based on " law of massaction ". the predictive result was ideal as we applied it to the 3. rd coalfield project of wenzhou power plant and project of wenzhou peninsula, which shows that the model deserve use in much more projects

    本文在對國內外關于地基沉降預測理論的研究進行綜述的基礎上,首先對工程中常用的三點法進行了細致深入的研究,指出以工程實測數據證明的現有三點法在應用時存在的不足,針對該不足進行了探討,並在此分析基礎上提出了預測結果更為理想的改進三點法;其次區別傳統沉降預測方法的研究途徑,本文從沉降過程的發展特徵出發,根據描述物化反應過程發展特徵的質量作用定律原理,探討了一種新的地基沉降預測方法:地基沉降預測的「質量作用定律」模型;本文還以溫州三期煤場工程及溫州淺灘圍塗促淤工程為背景,對上述改進三點法、地基沉降預測的「質量作用定律」模型的工程應用與傳統的預測方法進行了比較,認為這些方法是可行的,並得出一些有用結論。
  15. In reference with the major earlier symptoms and index of agreement violation of loan put forward by bosnian a. roger, and combining the basic elements that influence credit risk forewarning of commercial banks, some key indexes have been selected to establish the prediction model of single loan credit risk. the model may serve as reference in the practice of controlling credit risk of commercial banks

    參考bosmana . roger提出的預測貸款違約主要先期跡象和指標,綜合影響商業銀行信用風險預警基本因素,遴選出一些關鍵指標建立銀行單筆貸款信用風險的預測模型,這個模型在商業銀行控制信用風險的實際操作中具有一定的參考價值。
  16. The resolution not only constitutes temporary criterio n to ship ' s maneuverability, but also puts forward to adopting math model to prediction of computer calculation in design phase. in addition, with development of the inland river shipping project, the scale of the inland river ship and fleet becomes more and more huge, especially for those hvge fleet which can be look on as corpulent ship with shallow draught. to ensure the security of the navigation, the special maneuverability is needed for them to passing through the bridge safely

    該決議在制定了船舶操縱性標準的同時,還提出在設計階段可採用數學模型進行計算機模擬預報來作為驗證符合標準的依據。另外,隨著內河航運事業的發展,內河船舶和分節頂推船隊的規模越來越大,特別是編隊龐大的頂推船隊,可以視為淺吃水的肥大船型,為保證航行安全,特別是順利通過大橋,對其操縱性也有特殊的要求。
  17. As a result, the model, which can make a prediction of customer ' s chum probability, put forward to the purposes desired are accomplished

    利用該模型能及時準確地掌握客戶流失情況,以此可以提高企業決策的針對性,降低客戶流失率。
  18. Based on sample of the index from april 3, 1991 to may 31, 2001, arima models have been built with tsp computer software guided by route of " from general to specific ". the models built have better fit goodness and one point forward prediction is highly precise. but ultra - sample prediction by c + + program shows prediction precision reduces fast as the length of prediction grows, long term prediction of the index is impossible

    建模表明利用tsp統計軟體結合從「一般到特殊」的建模方法,所建的模型對已有數據的擬合較好,向前一步單點預測準確性較高,但利用c語言程序進行進一步分析表明時間序列分析模型對深圳成分指數的長期預測效果明顯降低。
  19. Research and analysis of forward prediction technology using seismic reflection wave in tunnel and laneway in china

    中國隧道及井巷地震波法超前探測技術研究分析
  20. Taking in - situ toughened silicon nitride as a design object, principle component analysis ( pca ) is applied to study the microstructure and mechanical properties, to find out the main microstructure controlling factors, and to simplify the characterization variables and criterions ; fuzzy neural networks ( fnns ) is also applied to develop a design expert system for this material, which can realize the forward prediction from processing, microstructure to mechanical properties, and backward design from mechanical properties or microstructure to processing ; monte - carlo method is applied to simulate the grain growth of this material, and then crack propagation is simulated, which is another way based on physics and chemistry to developing prediction models from processing until to mechanical properties

    本文以自增韌氮化硅陶瓷為設計對象,運用主成分分析法( principlecomponentanalysis : pca )對自增韌si _ 3n _ 4陶瓷的顯微結構和力學性能進行數據空間降維,獲得自增韌si _ 3n _ 4陶瓷顯微結構控制的主要因素,進而簡化了表徵參量變量和準則;運用模糊神經網路( fuzzyneuralnetworks : fnn )建立了自增韌si _ 3n _ 4陶瓷設計專家系統,能實現工藝?微結構?性能的正向預測及反向設計;運用monte - carlo方法( mc )進行自增韌si _ 3n _ 4陶瓷的晶體生長模擬,然後進行裂紋擴展模擬,探索建立工藝?微結構?力學性能預測模型的思路。
分享友人