foundation dredging 中文意思是什麼

foundation dredging 解釋
地基開挖
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  • dredging : 干法塗搪
  1. The work of this paper lays the solid foundation for the experimental research on dredging pump performance and hydraulic transport properties

    本文所作的工作為疏浚泥泵與管道水力輸送實驗系統的實驗研究打下了堅實的基礎。
  2. By analyzing on nature, society and economy conditions as well as distribution characteristics of sand source in the lower lhasa river valley, put forward a series of comprehensive renovation scheme to harness sand sources, mainly including dredging channel, planting farmland shelter - forest network, constructing arbor - bush - herb shelter forest and shifting sand stabilization, this scheme will not only control blown - sand threat, and improve local ecological environment ; at the same time, also lay the strong foundation for enlarging lhasa city space and effectively utilizing local resource, embody a sustainable thought on how to make comprehensive renovation in high cold valley region

    摘要在深入分析本區自然社會經濟條件和風沙源分佈特徵基礎上,提出把拉薩河下遊河道疏浚與風沙源治理相結合,以河道疏浚、農田防護林、喬灌草防風護沙林和流沙固定等物理工程、生物和機械措施為主體,進行風沙源綜合整治,一方面可有效控制風沙災害的威脅,改善河谷區生態環境,同時為拉薩市城市空間發展和當地資源的有效利用奠定了基礎,體現了在高寒河谷區進行風沙源綜合整治的可持續性思路。
  3. The rock fill mound foundation has the merit of simple construction method. after dredging the soft marine clay, the rock fill is then laid into position by barge until the desired elevation is reached

    -毛石堆地基的優點是建造方法簡單,只需在挖走松軟的海泥后,以躉船把石填料投放在適當位置至所需的高度。
  4. The scheme of natural draining and pre - compression with stacking load has not only treated the dredging region, but also prepared a great deal of rocks for the second - stage construction of dayaowan and saved time for backfill work. and it will be possible that the berth 11 # of the second - stage construction is put into production as soon as possible. the scheme simplifies the unnecessary process of foundation treatment and its direct economic benefit and the social benefit are very remarkable

    在隨后進行的大窯灣吹填區兩個場地堆載處理的工程實踐中,借鑒了本次方案研究的成果,採用自然排水堆載預壓方案,既進行了吹填區的處理,也為大窯灣二期準備了大量的開山石料,節省了回填工期,從而使二期11泊位盡早投產成為可能;從經濟效益角度分析,採用此方案簡化了不必要的基礎處理過程,直接效益與社會效益非常顯著。
  5. The mat foundation could transfer the vertical and the horizontal loads of the cwps directly onto the dredging level

    -席式地基會把冷卻用水抽水站的橫向及縱向負荷直接傳至進行挖掘的水平。
分享友人