foundation lever 中文意思是什麼

foundation lever 解釋
基礎水平
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  • lever : n 利弗〈姓氏〉。n 1 桿,杠。 a ball lever 浮球桿。 a brake lever 閘桿。 a control lever 控制桿。 ...
  1. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  2. Water resource fee as one economic adjustment lever, is the prerequisite and foundation of realizing rational distributed of water resource by market mechanism

    水資源費作為一種經濟調節杠桿,是市場機制得以實現的前提與基礎。
  3. During the excavation of foundation pit, due to the wide variation in water lever, the huge head fall should result in drastic flow of the ground water, which will bring about a full influence on the deformation of the retaining wall and on the surrounding structures in a large - scale range

    在深基坑開挖過程中,需大幅度降低基坑水位,巨大的水頭差將使得土體孔隙中的水運動趨向激烈,從而影響到基坑支護結構的變形,並由此對較大范圍內的鄰近地段的安全產生影響。
  4. Being just unfolding, industrialized movements represents the contemporary developing requirements and forwareing direction of the advanced productivity, examining the reality and future, the drawback of changsha " s development lies in industry, also the advantage in industry and wishes in industry the development of changsha " s industry has the advantage of culture, geography, good relations, technology, industry and environment, while it also has the disadvantage of low industrialized lever, poor foundation and insufficient accumulation

    方興未艾的工業化運動,代表著當今先進生產力的發展要求和前進方向。審視現實與未來,長沙發展的差距在工業,優勢在工業,希望在工業。長沙工業的發展,既有文化、地緣、人緣、技術、產業、環境等方面的優勢,也有工業化水平低、基礎薄弱、積累不足等方面的劣勢;既有實現跨越式發展的良好機遇,又必須面對更為嚴峻挑戰的形勢。
分享友人