foundation pit excavation 中文意思是什麼

foundation pit excavation 解釋
挖基坑
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  • pit : n 〈美國〉(桃、杏等的)核。vt ( tt ) 除去…的核。n 1 坑,凹地,凹處;【礦物】礦井;煤坑;【植物...
  • excavation : n. 1. 開鑿;發掘;挖掘;挖土,剜通。2. 穴,洞;坑道,開鑿成的山路。3. 【考古】出土文物,發掘物。
  1. In order to make the best use of explosive energy in loosing soil or throwing it onto some area and ensuring the bottom meet some leveling requirements after blasting, a plane charge layout is often adopted according to blasting design and engineering quality requirements in open chamber blasting such as mine exploitation, field leveling and foundation pit excavation of construction

    摘要在礦山剝離、場地平整以及建(構)築物基坑開挖等露天爆破中,為了充分利用炸藥能量將巖石松動或拋擲到一定區域,並確保底板滿足一定平整度要求,按照爆破技術設計和工程質量要求,需要設計平面布藥結構。
  2. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有限元法模擬分析涵洞基坑開挖時,採用分層、分步模擬開挖過程的方法,即將計算域內單元分層「挖去」 ,使開挖表面成為無應力表面的方法,分析土體在卸載狀態時的應力場和位移場隨開挖深度的變化規律;在洞體施工后,回填土體時,據開挖完成時的應力場、位移場,通過逐級增加計算域內的單元數目,施加每級新增加單元的自重荷載,利用有限元法模擬基坑及上覆土體分層填築的施工過程,這不僅反映土體處于再加載應力狀態時,填土受力及變形的一般規律,而且這種將地基? ?涵洞? ?土體作為一個統一整體進行模擬的方法,量化了三者之間的相互作用關系。
  3. Study on tree - root pile applied to foundation pit excavation support for existing factory plant under special geologic conditions

    樹根樁圍護在老廠房內特殊條件下的施工研究
  4. This paper is based on the construction of jiangbei airport station of the chongqing no. 3 light railway, the control demolition applied to shallow covered and large foundation pit excavation under urban complicated condition is introduced

    摘要以重慶輕軌三號線江北機場站為例,介紹了城市復雜環境條件下淺埋隧道、大基坑開挖控制爆破施工方法。
  5. In the paper, other research results are summarized, and a big test model indoor of row pile retaining and protecting deep foundation pit is designed. for homogeneous soil or samdwich soil structure three different retaining and protecting kinds : dense pile, thin pile and without pile are designed, using excavation simulation and loading on the top of slope, the model test is divided into two stages : foundation pit excavation simulation stage and destroy test stage. in this paper, for three different retaining and protecting kinds, the relation between soil pressure and displacement of piles, the relation between soil stress and strain, interaction of pile and soil and retaining and protecting loss - stability destroy are systemic studied

    本文總結了前人研究成果,構築大型室內深基坑排樁支護試驗模型,在均質及層狀土層結構地基上,設計了密排樁、疏排樁及無支護三種不同支護型式,採用模擬開挖與坡頂均布加荷方式,進行了模擬基坑開挖和破壞性的兩個階段試驗,對三種不同支護型式的土壓力與樁位移、土體應力與變形、樁土共同作用及支護結構失穩破壞進行系統研究。
  6. Drotective mearures taken for pile foundation in the foundation pit excavation of

    上海科技城深大基坑開挖時對樁基的保護措施
  7. In addition, based on the biot theory of consolidation and considered the influence of seepage on deep foundation pit excavation, the mathematics model is established, which is applied to the coupling of seepage and stress and considers the free surface of seepage. it is understood that the influence on the stability of foundation pit by groundwater seepage formed during deep foundation pit excavation

    考慮到滲流對基坑開挖的影響,在biot固結理論的基礎上對基坑開挖進行了滲流場與應力場耦合分析,建立了耦合計算模型,由此分析在深基坑開挖過程中,由降水形成的地下水滲流對基坑開挖穩定性的影響。
  8. Numerical simulation of deep foundation pit excavation with double - row piles

    深基坑開挖中雙排樁支護的的三維有限元模擬
  9. Dewatering and drainage design for deep foundation pit excavation

    深基坑開挖降排水設計
  10. Foundation pit supporting structure and deep foundation pit excavation of zhuhai port square

    珠海口岸廣場支護結構與深基坑開挖
  11. ( 3 ) fem basic theory of foundation pit excavation stimulation is expounded, numerical model and method of construction simulation are determinated, which includes simplification of two - dimension problem and constitutive model of soil mass i. e. constitutive model of duncan - chang hyperbola model, numerical ways of initial situ stress, stimulation of equal nodal load of foundation pit excavation, nonlinear solutions of basic equations, fem disposing of inner supporting and pre - axial force etc. further fem code of stimulation of foundation pit excavation is compiled

    闡述了基坑開挖模擬的有限元基本理論,確定計算模型及施工模擬方法。包括二維問題的簡化、土體的本構模型,即鄧肯-張雙曲線本構模型、初始地應力場的計算方法、基坑開挖等效結點荷載模擬、基本方程的非線性解法、內支撐及預加軸力的有限元處理等,並編制了模擬基坑開挖的有限元程序。
  12. Based on a wide literature review including 141 case studies, the characteristics of the engineering geology and the main foundation pit excavations and support techniques in beijing were summarized and discussed, from which the present technical and application status of the typical foundation pit excavation and supporting techniques in beijing can be reflected

    本文在總結北京地區工程地質、水文地質條件以及基坑工程的一些主要特點的基礎上,對所搜集的北京地區141個基坑工程實例進行分析,討論、總結了一些常用的支護技術,從中可以看到北京地區基坑支護技術的概貌。
  13. Finite element numerical simulation of deep foundation pit excavation supported by frozen soil wall with nonhomogeneous temperature distribution

    非均勻溫度分佈凍土墻圍護深基坑開挖的有限元數值模擬
  14. Proposal design for foundation pit excavation support for east special area of traffic center in terminal section of shanghai pudong international airport phase project

    上海浦東國際機場二期交通中心東側特殊區域圍護方案的設計
  15. Proposal optimization and practice on large and deep foundation pit excavation support for main building in terminal section of shanghai pudong international airport phase project

    上海浦東國際機場二期航站區主樓深大基坑的圍護方案優化及實踐
  16. Secondly, another 2d - fem analysis is made on a practical engineering of foundation pit excavation supported by soil - nailed system. then the different distributions of tensile stress, shear stress, plastic failure zone and horizontal displacement obtained by analysis for non - supporting and soil - nailed supporting step - by - step excavation are compared with each other. some conclusions about mechanism of soil - nailed supporting system are reached from above comparisons

    在計算方法與本構模型研究中,重點對ansys中基於drucker - prager彈塑性本構模型的巖土體d - p材料作了分析,指出了此材料沒有對拉應力限制的缺陷並提出在計算過程中必須密切注意拉應力的大小及分佈;同時提出了基坑分步開挖與支護的數值模擬過程。
  17. Field observation and analysis on soil pressures of pit walls in foundation pit excavation

    基坑開挖坑壁土壓力原位監測與分析
  18. Study of land subsidence caused by from groundwater lowering during deep foundation pit excavation

    深基坑開挖降水導致地面沉降機理研究
  19. Simulating of an actual foundation pit excavation with three - dimensional elastic - plastic finite element method

    基坑開挖的三維彈塑性有限元模擬
  20. Construction monitoring and analysis of double large - diameter annular arched girders support system in double foundation pit excavation

    雙基坑大直徑雙環梁支護體系監測與分析
分享友人