foundation structure 中文意思是什麼

foundation structure 解釋
基礎結構
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  • structure : n. 1. 構造,結構;組織;石理,石紋。2. 建造物。3. 【化學】化學結構。4. 【心理學】(直接經驗中顯現的)結構性,整體性;整體結構。adj. -d ,-less adj.
  1. The sedimentation is the foundation, affecting the basic pattern of the reservoir, and the sedimentary facies zones beneficial to the formation and evolution of the reservoir includes platform edge bank facies, introplatform point beach facies and acclivity sedimentary facies, etc. ; the diagenesis is the key factor, determining the pattern and scope of the final distribution of the reservoir and being of great influence on reservoir structure, and the diagenesis of promoting the formation of storage rooms is mainly the dissolution occurred during hypergene stage and burial stage ; and the tectonism is the condition of influencing the connectivity among various reservoir bodies and among the storage rooms within a single reservoir body

    該套儲層是在4億年左右的地質歷史中,由沉積、成巖和構造作用相互影響而形成的最終成果:其中沉積作用是基礎,影響著儲層的基本形態,有利於儲層形成與演化的沉積相為臺地邊緣灘、臺內點灘和上斜坡等沉積相帶;成巖作用是關鍵,決定了儲層的最終分佈形態和范圍,對儲層結構的影響至關重要,促進儲集空間形成的成巖作用主要有表生期和埋藏期的溶解作用;構造作用是條件,影響著各儲集體之間以及單一儲集體內部儲集空間的連通情況。
  2. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  3. So in that foundation this thesis proposed the amendatory expressions which can neglect the effect of secondary frame in computing structure lateral displacement, and this correction coefficient enhances the computation precision of that simplification method

    因此,本文在此基礎上提出了不考慮次框架影響時結構側移的修正公式,以提高此簡化方法的計算精度。
  4. Stability of rock slopes is generally controlled by the structure of rock masses, especially the soft structure surfaces. analysis of rock mass structures is a key to establish geological models and numerical simulation and a foundation to assess the stability of rock slopes. the weak structure surfaces are mainly bedding planes, faults, joints, schistosity plane and contact zones of intrusive bodies. since they are different in genesis and scale, the rock masses are different in features and mechanical intensities. based on the combination of rock structure bodies, 15 basic modes of deformation and failure of rock slope are systematically summarized. the deformation and failure of rock masses actually result from the recombination and rearrangement of these rock bodies. there are 11 types of rock mass structures and various deformation and failure of bank slopes are present in the reservoir area of the three gorge project

    巖體結構,特別是軟弱結構面對基巖斜坡變形與破壞具有顯著的控製作用,巖體結構模式分析是建立斜坡地質模型和數學模型的關鍵和評價斜坡穩定性的基礎。巖層層面斷裂構造節理裂隙片理與劈理以及侵入體和圍巖的接觸帶等是控制基巖斜坡穩定的軟弱結構面,這些成因不同大小不一的結構面將巖體分割成性質各異力學強度不均的各種巖體結構體,構成了15種基巖斜坡變形破壞的巖體結構基本模式。不同結構體的重新組合與排列是斜坡失穩的內在原因。
  5. Based on vc and opengl software platform, as a part of integrate planar mechanism analysis and simulation cai, the mechanism theory has been adopted to analysis the movement trace and profile of linkage ; adopt oriented object method to capsulate the class module. each corresponding class module complete parameter storage and process ; adopt message - map, message - trigger to organize the programming and response the user " s input ; use the document - view structure of the visual vc + + mfc class foundation as the basis of the programming architecture to complete those functions. use oriented object method to product the following class module : control class, render class, document class, mechanism class and other classes ; adopt opengl library to draw the three dimensional graph based on the result of mechanism analysis ; use model transforming, lighting, material, color, frame - buffer, display - list, graphics - component combine etc to draw the three - dimension mechanism and make the simulation of linkage has high reality

    本文敘述了平面連桿機構運動分析和可視化模擬的理論演算法及其編程實現方法,基於微機vc平臺,採用opengl圖形庫編程,利用面向對象的方法對機構進行功能封裝,利用vc + +的文檔視結構作為最基本的窗架,生成並控制三維繪制類、文檔類、主窗口類和一些輔助類,利用windows平臺的消息映射、事件驅動來組織程序運行和響應用戶反饋,利用機構分析得出坐標數據驅動opengl庫繪制三維機構圖形。
  6. Correlativity between slope displacement and form of braced structure for deep foundation pit

    基坑支護形式與邊坡位移的相關性分析
  7. Along with the higher and higher requirements for the cosiness and stability of subway vehicle, it is necessary to know better the dynamic characteristics of the car body through the modal analysis technology, so as to provide foundation for a rational structure design

    摘要隨著對地鐵列車舒適性、平穩性要求的提高,有必要運用模態分析技術了解其結構動力特性,為車體結構的合理設計提供依據。
  8. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數值計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  9. Comparing with the conventional method, interactive method is more security and economy to design tall frame structure. in the past, the superstructure was considered as a single element whose bottom was fixed on the foundation. apparently this approximately approach was unsuitable well for the real structure, so the design was insecurity or diseconomy

    在以往的常規設計中,將上部框架看成是柱底固定的獨立結構進行計算,不考慮上部結構、基礎和地基之間的共同作用,與實際結構的受力與變形存在較大差異,使設計出的結構不安全或不經濟。
  10. So the topic for farther discussion will be developed on the ground of soil - foundation - structure interactions, and em phasizes particularly on the investigation for dynamic effects on interaction of pile - supported structures subjected to lateral seismic load at layered - soil media. it will provide engineering application with practical and concise computational method, but also provides the aseismatic design for pile - supported structures with proper theory foundations and schemes to some extent on condition that definite codes are absent at present. the full article is divided into six chapters, as follows : 1

    本論文工作將圍繞地基-基礎-上部結構共同作用這一課題作進一步探討,側重於水平地震作用下層狀地基土中的樁基-建築物的動力相互作用的研究,為實踐應用提供了適合於工程目的的、比較簡捷的實用計算方法,亦擬為沒有明確規范指導的樁(土)基礎-結構抗震設計提供一定的理論依據和設計建議。
  11. In the 5th chapter, aiming at the case part of complex structure, the information description method based on foundation - structure - unit and azimuth - structure - unit - tree is presented, and hierarchical information model of case part is defined

    第五章針對復雜結構的箱體類零件,建立了基礎結構單元與方位結構單元樹信息描述方法,定義了層次結構的箱體零件信息模型。
  12. Selection of the foundation structure for the reinforced concrete coal silo

    談鋼筋混凝土圓筒儲煤倉基礎結構選型
  13. The analytical methods about foundation - structure interaction have two main categories. they are analytic methods and numerical methods. at present, finite element method, sub - structural analysis method and mixture method are common methods

    地基與結構的相互作用的分析方法有解析法和數值解法,目前常用的方法是有限元法和子結構法以及雜交法。
  14. Large diameter prestressed concrete tubular pile is one of the new type of pile foundation structure developed in the period of sixth five - years plan, the category and specifications of this kind of concrete tubular pile improved continually from the only one al type to a, b, c three category including seven types with the development of harbor industry, and applied in more than forty large scale harbor and bridge projects. the advantages of this product such as better structure performance, lower investment and higher construction speed were fully embodied in such projects

    大直徑預應力混凝土管樁是我國從「六五」期間開始的新的樁基結構形式,隨著港口事業的發展,大直徑預應力混凝土管樁的品種與規格不斷得到拓展,從原來的單一的a1型樁發展到a 、 b 、 c三類7種規格的系列產品,在全國四十多座大型碼頭和橋梁工程中得到應用,充分體現了大管樁這一產品結構性能好,投資省,速度快的優勢。
  15. On reliability study of bridge pile foundation structure system

    橋梁樁基結構系統的可靠性研究
  16. Caisson - cylindrical foundation structure is a new type of structure for breakwaters developed successfully in recent years

    摘要箱筒型結構是近年來開發成功的一種新型防波堤基礎結構。
  17. This article incorporates with the practice for construction of mass concrete foundation structure of handan big world department store, according to the features in foundation structure design and the conditions of winter construction in this region, introduces micro - expansion concrete mix proportion design, pouring technology for mass concrete structure, the solution of the strengthen joint - strip and post - pouring joint strip in concrete foundation work, and temperature control for mass concrete

    結合大世界商城底板大體積混凝土的施工實例,針對基礎結構的設計特點和當地冬季施工的氣候條件,介紹了補償性混凝土配合比設計、大體積混凝土澆築工藝、基礎混凝土加強帶和后澆帶施工工藝、底板混凝土溫度控制和自動化監測等多項綜合性技術。
  18. Foundation structure design in soft soils is a very difficult engineering problem. the elastic foundation beam method has some merits such as easy calculation pattern and definite model and m - method is fit to practical situation, so it is used comprehensively and welcome by constructors, thus m - method is recommended by many codes. but it is difficult to select a m - value to some soils, and the codes provides a scope of m - values, and they are different in varied regions and soil conditions, thus it is optional to choose m - value of a soil layer for engineering designers. so it is necessary to calculate m - values by back - analysis method using measured datu of deep foundation pit

    軟土地區的深基坑支護結構設計是一個十分復雜的工程問題,由於彈性地基梁法具有計算模式明確、計算過程簡單的優點,尤其是m法較符合軟土基坑工程的實際情況,因而受到廣大工程設計人員的歡迎,大多規范也推薦此法。但是m法計算參數的選取是工程界的一大難題,一般規范都給出了m值的大致范圍,而且每個地區的地質條件千差萬別,因而m的取值具有很大的隨意性,有必要根據一個地區的工程實測資料對m值進行反演分析,以便為地層相近或附近地區的基坑工程設計提供參考和依據。
  19. As a part of the project aided by nature science national fund, 《 analysis of soil - foundation - structure dynamic interaction 》 ( no. 50278033 ), some issues about test research and simulation analysis on soil - box foundation - rc frame structure are discussed in this thesis. these issues include the development in contact modal of dynamic analysis with soil - box foundation interaction, the effect on dynamic interaction with transform in parameter both of superstructure and soil, the research on seismic isolation by changing soil stiffness and introducing research result to the seismic structure design

    結合國家自然科學基金課題《地基-基礎-上部結構相互作用體系動力特性研究》 ( no . 50278033 ) ,本文圍繞土-箱形基礎- rc框架結構動力相互作用這一課題,在前人研究成果的基礎上,對動力分析中的接觸模型作了新的探討,並通過試驗分析和數值計算上作了相應的研究對比;同時研究了上部結構與土的各項動力參數對動力相互作用的實際影響,並且進一步利用上述研究得出的結果,通過數值分析探討了關于採用換土改變地基剛度而起到隔震的效果,將土-動力相互作用研究的成果引入工程抗震設計的實際工作去。
  20. If, under the contract, the employer is required to give ( to the contractor ) possession of any foundation, structure, plant or means of access, the employer shall do so in the time and manner stated in the specification

    如果合同要求僱主賦予(承包商)對基礎、結構、永久設備或通行手段的佔用權,則僱主應在規范註明的時間內按照規范中規定的方式履行該職責。
分享友人