full face method 中文意思是什麼

full face method 解釋
全面開挖法
  • full : adj 1 充滿的,裝滿的。2 充分的,豐富的;擠滿的;(吃、喝等)盡興的,3 (精神)飽滿的。4 完全的,...
  • face : n 1 臉,面孔;面貌,樣子;面子,威信。2 愁容,苦臉;〈口語〉老面皮,厚臉皮。3 外觀,形勢,局面。4...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Based on its special geological and mining conditions of qidong colliery, the cause of water bursting of loose aquifer in the 4th lineage in 7 ( subscript 1 ) 14 full - mechanized mining face of the first mining area was analyzed and technology method of preventing the 4th loose aquifer was discussed according to the occurrence characteristics of loose aquifer and damage characteristics of overburden rock in 7 ( subscript 1 ) coal seam

    摘要根據祁東煤礦特殊的地質采礦條件,結合鬆散含水層賦存特徵及7 (下標1 )煤層覆巖破壞特點,分析了一采區7 (下標1 ) 14綜采工作面第四系鬆散含水層出水的原因,探討了防治四含水的技術途徑。
  2. The paper introduces the progress and the statue quo of tunnel portal construction, discusses the condition to employ full face method, bench cut method, single side heading method and double sides heading method of portal construction, points out advantages and disadvantages of these methods. the order to adopt these methods of single track, double track and tri - track tunnel in shallow - depth, uneven pressure and incompact ground is also advised after compare

    討論了全斷面法、臺階法、單側壁導坑法和雙側壁導坑法在隧道洞口段施工中的使用條件和優缺點,對這四種施工方法從各個方面進行了比選,提出了單線、雙線和三線隧道的洞口段處于淺埋、偏壓、鬆散的地層中時各種施工方法選擇的先後順序。
分享友人