full scale test 中文意思是什麼

full scale test 解釋
全尺寸試驗
  • full : adj 1 充滿的,裝滿的。2 充分的,豐富的;擠滿的;(吃、喝等)盡興的,3 (精神)飽滿的。4 完全的,...
  • scale : n 1 (尺、秤等上刻劃的)分度,度數,標,標度,刻度;尺寸;尺,尺度。2 【音樂】(標度)音階;音列...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. By 1954, dr. knipling was ready for a full-scale test of his theory.

    1954年尼普林博士準備就他的理論進行大規模的試驗。
  2. Conversely, test made in full-scale boilers are usually difficult to reconcile.

    與此相反,在工業規模的鍋爐內所做的試驗,也難于互相一致。
  3. The results of full scale tests in this dissertation can reinforce international database of test and numerical analysis results for unstiffened tubular joints

    本文的試驗研究為國際節點數據庫增添了足尺節點試驗數據資料,並新增了kkt型節點的試驗數據。
  4. Through the dry and wet cycling experiment on unmarred beam and pre - cracked beam, the position of initial corrosion and influence of crack on the reinforcing bar corrosion are studied in this paper both the flexural bearing capacity performance and the material mechanical performance of the beams are studied on the test of full scale concrete beam a model of 3d fem is established to simulate the state of the actual full - sized rc beam and electronic accelerating test beams, computational results and test results are compared

    通過對混凝土梁的干濕循環試驗,研究了在混凝土梁中的鋼筋初始銹蝕情況,以及不同寬度的裂縫對于鋼筋初始銹蝕的影響。通過對足尺銹蝕混凝土梁的試驗,研究了混凝土梁在海洋環境侵蝕作用下的材料性能的變化和抗彎承載能力的變化。
  5. The results of full - scale tests in this dissertation canaugment international database of test and numerical analysis results for tubularjoints. based on the experimental study and numerical analysis, design proposal for theultimate tensile strength of gusset plate connections to slotted tubes is recommended. it has bigness significance to establish design formulae of gusset plate connections toslotted tubes and perfect design formulae of steel tension member and it also can givesome advices to practice engineering

    在試驗研究的基礎上,根據有限元分析的結果,本文提出了關于管板節點受拉極限承載力的設計公式,為我國鋼結構規范建立管板節點受拉極限承載力設計公式及有關拉桿的設計公式的進一步完善提供了有意義的參考,同時對實際工程也有一定的參考價值。
  6. The lifting - line and lifting - surface design method, the harmonic analysis method based on the panel method, new section design ways, the effective operating curves are integrated into a whole design system of the unsteady propeller, the design system is effective and reliable by the design example, the model test and the application to the full scale ship

    本文把升力線和升力面設計方法、基於面元法預報螺旋槳非定常性能的諧調分析方法,新剖面設計方法、有效運轉曲線計算方法組合為一套完整的非均勻流場中螺旋槳設計計算系統,經實例設計和模型試驗及實船的應用,該設計系統是可靠且有效的。
  7. Interaction of run - on slab and soil is simulated by “ m ” method, run - on slab is constrained by soil through the vertival and horizontal, advances computing model of new type semi - integral abutment bridge. ( 3 ) this paper takes hengyang dashuiting middle bridge for test supporting project, designs full scale model test which can reflect truly interaction of beam, run - on slab and the embankment behind the abutment of new type semi - integral abutment bridge

    通過「 」法來模擬搭板與土體之間的相互作用,用豎向彈簧和水平彈簧來實現土體對搭板的約束作用,建立了新型半整體式無縫橋梁的計算模型; ( 3 )以衡陽大水町中橋為試驗依託工程,設計了能真實反映新型半整體式無縫橋主梁、搭板以及臺后填土相互作用的足尺模型試驗。
  8. This dissertation generalizes the test on the full - scale reinforced concrete simply - supported slabs and three - span continuous slabs under fire at the normal loading condition. the conclusion can be drawn from the test about the deformation of the both kinds of slabs and the specimen section temperature distribution. meanwhile, the failure modes, mechanism and internal force redistribution of the continuous slabs are analyzed

    本文對足尺鋼筋混凝土簡支板、三跨連續板進行了恆載下的受火試驗研究,通過試驗,給出了鋼筋混凝土簡支板和連續板在高溫下的變形、構件截面溫度分佈規律;分析了連續板的內力重分佈和破壞機構的特點。
  9. Field pilot test. performance evaluation, pilot study report, design of full - scale system

    試驗結果評估,先導試驗報告書撰寫,整治系統設計規劃。
  10. Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible

    結合黃河小浪底水利樞紐工程在施工現場進行的採用雙層雙圈環形無粘結預應力鋼絞線和單圈有粘結預應力鋼絞線對排沙洞襯砌混凝土施加預應力的1 : 1模型試驗,對比分析了兩種后張預應力施工體系的優劣,歸納總結了預應力筋束張拉過程中預應力混凝土壓力管道結構管壁混凝土的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析結果的一致性,確定了預應力混凝土壓力管道理論計算方法的可行性。
  11. Full - scale test of battened tubular column in new beiyun international airport terminal

    新白雲國際機場航站樓鋼管綴板柱足尺試驗
  12. Seakeeping design and analysis of full - scale seakeeping test

    耐波性設計及實船試驗的分析研究
  13. Based on the date of full - scale measurements, modeling wind tunnel tests and theoretical researches of the wind loads on low - rise buildings available, involved the date of the wind tunnel test and computational numerical simulation fulfilled in this paper, the effects of wind loads on low - rise buildings have been studied systematicaly and extensively. it reveled properly the principle of the changes of the surface mean pressures, local pressures, and fluctuating pressures with the building geometry, roof type and slope, wind direction, eave configuration, cladding system, and dominate openings

    本文根據國內外有關低層房屋風荷載的全尺寸實測、模型風洞試驗及其理論方面的研究,包括本文進行的低層房屋屋面風壓分佈的風洞模型試驗和計算機數值模擬計算,對低層房屋的風荷載特性進行了系統而深入的研究,較好地揭示了低層房屋表面的平均風壓、局部風壓和壓力的波動隨房屋的幾何尺寸、屋面形式、屋面坡度、風向角、檐口構造、覆面材料和門窗開洞而變化的特點和規律。
  14. Test device design for full scale prestressed concrete beam on the spot

    足尺預應力混凝土梁現場試驗裝置設計
  15. The effects of goodroad enhanced asphalt mixture and glass fiber grid for resisting reflection cracking are proved by full - scale test, the resisting mechanism is analyzed, too

    通過反射裂縫足尺試驗來評價goodroad增強瀝青混合料和玻璃纖維土工格柵對抑制反射裂縫的效果,對抑制機理做了分析。
  16. Procedures of full scale test for oil country tubular goods makeup breakout tests for casing and tubing connections

    油井管全尺寸試驗方法油套管螺紋上卸扣試驗
  17. Based on some problems about random draft, energy conservation and ensemble efficiency of hydraulic - projects utilization, by the way of full - scale test, the application of frequency changer in agricultural water saving have been studied. it is the first time in china for the imagination that frequency changer has been used in tube - well irrigation in order to make the water pump keep constant transformation

    本項目針對目前農業節水灌溉工程中存在的隨機取水、節能問題和水利工程資源的綜合利用效率提高問題,以實地工程應用試驗為基礎,對變頻調速裝置在農業節水灌溉工程中的應用進行了研究。
  18. And it can help us to open up the utilization scope of frequency changer. the main content have been studied in this paper. for example, the energy saving effect of the frequency changer utilization in tube - well irrigation, spray irrigation and drip irrigation, the influence of the frequency changer to the degree of consistency in tube - well irrigation, spray irrigation and drip irrigation, and the full - scale test of the frequency changer used in tube - well irrigation

    本項目在國內首次提出了變頻調速裝置在管灌中使水泵進行「恆量變壓」變頻運行的設想,並首次對變頻調速裝置在農業節水灌溉中的應用進行了實地試驗研究,該研究成果對變頻調速裝置在管灌、微噴及大棚滴灌中的應用具重要的指導意義,對變頻調速裝置的設計研究及其應用范圍的拓展等具有一定的理論意義和很大的實用意義。
  19. Dr. knipling was ready for a full - scale test of his theory

    尼普林教授已在佛羅里達島進行了一些實地預備性實驗,並計劃大規模地實踐其理論
  20. The author compared the difference of steel - using amount between chinese codes and north american codes, and made the full - scale test. based on the theoretical analysis and the experimental research, the author puts forward the suggestion abolishing the limits on the thickness and only limiting the

    在理論分析及實驗研究的基礎上,提出了取消壁厚限制,只限制板件寬厚比的建議,可供編制《重慶市輕型鋼結構住宅技術規程》參考。
分享友人