高架龍門起重機,跨線起重機。

  • gantry : n. 1. 桶架。2. 【機械工程】龍門起重機;(起重機的)構臺[門架]。3. 【鐵路】跨軌信號架。4. 【宇宙空間技術】導彈拖車。5. 火箭平臺〈具有多層平臺並可移動,用以吊豎火箭及發射前檢修〉。
  • crane : n 克蘭〈姓氏〉。n 1 鶴;〈口語〉蒼鷺,鷺鷥,鸛;〈C 〉【天文學】天鶴座。2 起重機,吊車,攝影升降...
  1. At present, when people select equipment for container storage yards, rubber tyred gantry crane ( rtg ) has become their first selection. and as the " agnate brother " of rtg, rail mounted gantry crane ( rmg ) often neglected by them

    當前,在進行集裝箱碼頭堆場設備選配時,輪胎龍門起重機( rtg )已成為人們的第一選擇,而作為同族「兄弟」的軌道龍門起重機( rmg )往往被人們忽視。
  2. If the site is small, it may be commanded by a gantry crane.

    假如場地小,則可採用龍門式吊車進行操作。
  3. To be positioned and handled by hatch cover gantry crane

    用艙口龍門吊來吊放它們。
  4. Modification of dmq540 30 gantry crane

    30型門式起重機的改造
  5. Design scheme and optimization of dam gantry crane in shenwo reservoir

    參窩水庫壩上門機設計方案及優化
  6. Briefly talking of common failures of gantry crane and its countermeasures

    淺談門式起重機的常見故障及排除
  7. Speed controls for traction include not only electrical vehicles of horizontal transportation such as electrical trains, internal - combustion locomotives with electrical transmissions, underground metros, light fait locomotives, trolley buses, even magnetic suspension trains and electrical cars etc., but also electrical vertical traction systems such as elevators, automatic moving staircases, mine winding engines, and gantry crane trucks etc

    牽引調速既包括電氣火車、電傳動的內燃機車、地下鐵道、輕軌機車、無軌電車及磁懸浮列車和電動汽車等這類水平運輸電動車輛,也包括電梯、自動電梯、礦井卷揚機和龍門吊車等電動豎直牽引系統。
  8. When the prefabricated plant is under the viaduct, the monolithic box girder is lifted by the gantry crane and transported by the special rotary traversed platform, and then transported and erected by the bridge girder transporting and erecting machine

    當預制梁場設在高架橋下時,採用提梁機提起整孔箱梁,通過特製旋轉式橫移平臺喂梁,運架一體式架橋機運梁和架梁。
  9. The truck crane ( gantry crane, tower crane, mobile slewing crane, bridge crane, crawler crane ) can lift a weight of 15 tons

    這臺汽車起重機(龍門吊、塔式吊、懸臂汽車吊、橋式吊、履帶式起重機)能吊起15噸的重物。
  10. The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1, 140 meters, the auxiliary facilities have taken shape the main facility and the equipment include the 30, 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep, is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters, width 17 meters ; 16 tons portal crane 1 set, 16 tons gantry crane 1 set, mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation, coatings, the precision work equipment supplying air 120 m min, spraying grit more than 4, 000 m day, renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40, 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001, passed the national environmental protection appraisal in august 2002, was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002, the dry dock, passage channel, the turning area, fitting wharf are passed by passage safety appraisal in march, 2003

    主要設施和設備有: 3萬噸級干船塢一座長192米寬40米塢門凈寬32米深10米是福建省目前最大的干船塢舾裝碼頭一座長65米寬17米16噸門座起重機1臺10噸門吊1臺汽車吊8臺50噸1臺25噸1臺12噸2臺8噸4臺以及與其相配套的運輸噴塗精加工設備。每分種供氣120立方米,日噴砂面積4000多平方米,日換鋼板15 20噸。一般修船工期為7 10天。
  11. The first part. task analyse of handling technology design. is explain the place, basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design. the second part, project study out. is discuss the design contents the choice of the leading and the assistant engine, the form of the handling mechanisation system, project study out. the third part, size design, is count the berth pass capacity, the amount of handling engine, the area and capacity of yard, road and gate, the worker amount. the fourth part. technology and economy argumentation, commendable project confirm, is confirm the commendable project by technology and economy argumentation. in the end, considering the technology, economy and use. discourse commend the project of rubber - tyred gantry crane. at present. centre government is studying yangshan project, but in handling technology part of container terminal, the design is simply. so this discourse has important consult value. and has important value of economy and community too

    第一部分的裝卸工藝設計任務分析主要就洋山港區的地理位置、基礎設施、自然環境,設計前提條件,設計原則以及設計主要技術參數進行說明;第二部分的裝卸工藝方案擬定主要就工藝設計的主要內容,主要機械及輔助機械選擇,裝卸機械化系統組成以及工藝設計方案擬定進行論述;第三部分的裝卸工藝方案規模設計主要就泊位通過能力,裝卸機械臺數,堆場面積及堆存能力,道路及大門,司機及工人人數,工藝流程進行計算分析;第四部分的技術經濟論證及推薦方案確定主要就技術、經濟指標進行對比論證,並在此基礎上確定推薦方案。
  12. There is a idle workshop, the area is 913 square metres. there is a gantry crane of lifting weight 5 tons. producting and processing will be in the workshop

    市場院內有閑置廠房一座,建築面積913平方米,廠房內裝備起重量5砘的天吊1臺,可作為生產、加工車間聯合開發辦廠等。
  13. A new technique is put forward that high - low brace gantry crane wide double guiding girder method to construct bridge

    本文提出了高低支腿龍門吊寬幅雙導梁法這種新的橋梁工程施工方法。
  14. Through a real project - - - - - - " b " bid section of shijiazhuang south bridge. it is proved that high - low brace gantry crane wide double guiding girder method is a good and new technique of bridge construction

    經過實際工程(石家莊南環大橋b標段)的施工實踐驗證,證明高低支腿龍門吊寬幅雙導梁法是一種優良的橋梁工程施工新技術。
  15. For the design of mechanical systems and structures in a rubber tired gantry crane ( rtg ), the mechanical designer has to design the most useful safe and practical way to improve the equipment and its operation, to reach best performance and use ability of the rtg

    為輪胎式龍門吊的機械繫統和結構提供設計,機械設計員必須設計最安全並且實用的方法以改善設備和其運行,達到輪胎式龍門吊最佳的性能。
  16. Travelling gantry crane

    移動龍門起重機
  17. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁橋的鋼箱梁架設技術難題,重點闡述了施工方案,龍門吊、導梁設計,工藝要點等。
  18. In 2004, we established modern - garden enterprise in 56, 300 - sq. m jac fittings industrial garden, including 13, 300 - sq. m workshop 1, 620 - sq. m office building 3, 710 - sq. m dormitory building 720 - sq. m dining room. our company has abundant human resouce professional technician and modern management team. we ve possessed manufacturing installation maintenance reassembly licence for 50t bridge gantry crane, which has passed iso9001 quality control system authentication

    自2004年在合肥市崗集江淮汽車配件工業園徵收土地56300平方米,其中建立廠房13300平方米,辦公樓面積1620平方米,宿舍樓3170平方米,職工食堂720平方米,已建成現代花園式企業,公司有豐富的人力資源及現代化優秀的管理技術人員。
  19. In the base of information collection, discourse study handling technology in yangshan container terminal of the first phase. at one time. reference waigaoqiao and ningbo container terminal " s handling technologys compare the characteristic of handling technology, and analyse the index of the technology and the economy between rail - mounted transfer crane and rubber - tyred gantry crane. discourse is carved up four part. namely task analyse of handling technology design > project study out > size design s technology and economy argumentation, commendable project confirm

    同時,借鑒外高橋、寧波北侖等的集裝箱碼頭裝卸工藝設計,著重比較分析輪胎式龍門吊和軌道式龍門吊各自的裝卸工藝特點和技術經濟指標。全文共分四個部分,即裝卸工藝設計的任務分析、方案擬定、規模設計以及技術經濟論證和推薦方案的確定。