general project 中文意思是什麼

general project 解釋
一般型計畫
  • general : adj (opp special)1 一般的,綜合的,通用的。2 普通的,廣泛的,通常的。3 全體的,總的;全面的,普...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. The first one is a general introduction about the research background, project significance, project source, project task, the auctorial work

    第一章概述了本課題的研究背景和意義、課題來源和課題任務、作者所做的工作以及論文組織結構。
  3. Professor kenneth chau, dean of faculty of social science, the chinese university of hong kong, ms gu xiao - jin, secretary general of china youth development foundation, mr zhang yin - xi, vice director of the project hope national supervisory committee, and dr allen choate, director of program development, the asia foundation officiated at the opening ceremony

    香港中文大學社會科學院院長周健林教授、中國青少年發展基金會秘書長顧曉今女士、全國希望工程監察委員會副主任張銀喜先生及亞洲基金會業務發展主任邱越倫博士應邀為主禮嘉賓。
  4. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  5. Presently has to emphatically take eight methods for it : taking township project for locomotive to earnestly do well the general grogram on new countryside and new pasture construction ; fulfilling " six great engineering " to accelerate township ' s basic facilities construction of new countryside and new pasture and reinforce socialistic affairs development ; implementing " transformation 、 expansion and promotion " three strategies to increase production and lift efficiency of agriculture and stock breed and raise farmers and nomads ' incomes ; accelerating policy support and financial investments to strengthen the development impetus in countryside and pasture ; further do well program work to lay fundament for prodding the economy rapidly developed in new countryside and new pasture ; enhancing farmers and nomads ' skill training to bring up a group of socialistic new - type farmers and nomads who being cultured, skillful and understanding managements ; entirely deepen the reform in countryside and pasture to enhance the driving force and vitality of development of new countryside and new pasture ; realistically respect and protrude the main body position of farmer and nomad to basically change their traditional value concepts on production and livelihood

    目前要著力採取八項措施:以村鎮規劃為龍頭,認真做好新農村新牧區建設總體規劃;實施「六大工程」 ,加速新農村新牧區村鎮基礎設施建設和社會事業發展;實施「轉變、拓展、提升」三大戰略,加速農牧業增產增效和農牧民增收;加大政策扶持和資金投入力度,增強農牧區發展的動力;進一步做好項目工作,為推動新農村新牧區經濟快速發展打好基礎;加速農牧民技能培訓,造就一批有文化、懂技術、會經營的社會主義新型農牧民;全面深化農村牧區改革,增強新農村新牧區發展的動力和活力;切實尊重和突出農牧民的主體地位,從根本上轉變農牧民傳統的生產、生活方式和價值觀念。
  6. The newly - built projects " construction supervision system should adopt independent social form and implement the supervision of omnibearing and full process ( mainstay project, field interplant project and the supervision manufacture of equipment ), which will be favorable to the optimal achievement of the project ' s general aim, cutting down the latent danger of quality and reducing the cost of operation and management

    高揚程梯級提水灌溉工程新建項目的建設監理制宜採用獨立第三方的社會監理形式,並推行從規劃設計到工程實施的全過程、全方位(主幹工程,田間配套工程,設備監造)的監理,以利於工程總體目標的最優實現,減少工程投運后的質量隱患,降低運行管理費用。
  7. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基坑支護工程越來越多,綜合青島市區的地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑施工時需要爆破施工,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑支護工程越來越引起了各方面的重視。
  8. Second, it presents the project design of an astronauts ’ kinetic measurement system that can precisely measure the forces and moments of key points on motorial person. it presents a principle and flow of the project design of an astronauts ’ kinetic measurement system. and it particularly discusses the demarcate of camera system, the gathering and storage of experiment pictures, pick - up of the symbol data, the parameter calculating method of target movement, and the general design of assistant equipment

    然後給出航天員作用力測量實驗系統的設計方案,該系統能夠克服重力影響,較精確地得出運動時人體各關鍵點產生的力和力矩;給出了航天員運動參數測量實驗系統的原理及流程,並詳細論述了攝像系統標定,實驗圖像的採集與存儲,標志點數據的提取及目標運動參數解算的方法;給出了輔助設備的概要設計。
  9. State general project information, goals, and relevant background information for the site redesign. this paragraph should be a statement overview of the project as a whole

    陳述一般專案資訊,目標跟適當這次重新設計的背景資訊。這段應該是整個專案的縮影。
  10. The integrated management information system for inspection and surveying of import & export mechanical and electric products, which was approved in 2000 by aqsiq ( the state general administration for quality supervision and inspection and quarantine ), is mainly a query - centric project

    進出口機電產品檢驗監管綜合管理信息系統是國家質檢總局2000年下達的,一個以數據查詢為主的項目。
  11. General view of swc project

    深港西部通道工程府覽
  12. With the purpose that people in countryside and rural area can listen to the sounds of communist party and chinese government, “ xi xin project ” has been carried out state general bureau of the radio and television and set up tens of 500kw sw radio transmitters, ten of them were installed, whom were th558 with find power amplifier, a kind of ultrahigh power mental - ceramic tetrode from french thomson company

    為使我國廣大農村和邊遠山區群眾能聽到黨和政府的聲音,國家廣播電視總局組織實施了「西新工程」 ,部署了數十部500kw短波廣播發射機,其中十部的末級功率放大管採用法國湯姆遜( thomson )公司生產的th558超大功率金屬陶瓷四極管。
  13. The strong human resources are base of execution of customization crm, involving management, project preparation, project execution and system operation. that is the weak force for small scale corporate. so it is good idea for middle - small scale corporate to choose general crm system, not customization crm

    中小企業要實施定製式crm系統必須有很強的人力資源基礎,在企業管理、項目準備、項目執行和系統運行方面都需要強大的人力支撐,而這正是大多數的中小企業所缺乏的,所以對於一般的中小企業來講,需要強大的人力支撐,選擇通用型的crm系統而非依據業務特點定製的crm系統是更明智的方式。
  14. This paper presents the general project design firstly, and then introduces the system hardware circuit design in detail which includes the choice of chips, the loop filter parameters computation and the design of the power amplifier ' s peripheral matching circuit

    在介紹了系統總體方案設計之後,本文詳細介紹了系統的硬體電路設計,包括晶元的選擇,環路濾波器參數的設計,以及功率放大器外圍匹配電路的設計。
  15. Children were much willing to comprehension - accept it, thought it much unjust and their negative emotion was stronger in the circumstance of " do n ' t know the offender " than in the one of " do n ' t expose the offender ". ( 6 ) there were differences in their responses of comprehension - acceptance, justice, and taking - responsibility - trend to collective responsibility between two situations. children were less willing to comprehension - accept it, thought it much unjust and had less taking - responsibility - trend in the situation of " general project " than in the one of " role - taking project " and there was no difference about the children ' s negative emotion between them

    本研究運用「財物損壞」 、 「人身傷害」 、 「榮譽損害」三方面的情境故事,每一故事均有「不知道犯過者」和「不揭發犯過者」兩種情況,同時設置了「一般投射」和「角色承擔」兩種投射情境,以211名7 ? 15歲兒童為被試,探究了他們面對集體責任時在理解認同、公正判斷、內心體驗和承擔責任傾向上的反應特點。
  16. It demonstrates the general project of vehicles mutual moving - state detection and control system, which use a frequency modulated continuous wave ( fmcw ) radar with the antenna replaced by a frequency scanning array as the basis of detecting sensor

    文中闡述了汽車相互運動狀態監控系統的總體方案,使用調頻連續波( fmcw )雷達作為探測傳感器的基礎,並在天線部分作了改進,採用了獨立的頻率掃描天線。
  17. The general project structure in maven is already documented see

    有許多資料介紹maven中的通用項目結構(請參閱
  18. The results were as follows : ( 1 ) the 10, 12, 14 - year - old children had the value indicators of cognitive - judgment, acting - incline, affective - experience and behavior - repeating - trend. the 16 - year - old children had the value indicators of cognitive - judgment, acting - incline and behavior - repeating - trend, their scores on the aspects of cognitive - judgment, acting - incline and affective - experience were less than others, and their score on behaving - repeating - trend was higher than others. ( 2 ) comparing the two different project situations, the scores of all subjects at different ages were higher in the " role - taking project " one than in the " general project " one

    結果發現: ( 1 )在誠信價值觀的各項指征上, 10 - 14歲兒童已基本具有了認知判斷、行為傾向、內心體驗和行為重復的價值觀指征; 10 - 16歲兒童卻都不具有情感分享的價值觀指征; 16歲兒童基本具有了認知判斷、行為傾向和行為重復的價值觀指征,他們在認知判斷、行為傾向和內心體驗上卻均比10 - 14兒童較低,但行為重復傾向比10 - 14歲兒童較高。
  19. We have developed gallstone dissolving instrument to realizing this method, then expatiated the work principle, general project, construction design, control system design and adjust, operation etc, all in details

    為了實現這一治療方法,研發了膽石溶解儀,並對膽石溶解儀的工作原理、總體方案、機械結構設計、電控系統設計、調試及儀器操作等進行了較詳盡的闡述。
  20. Some project defaults derive from the style sheets that are applied when you update properties in the project defaults section of the general project configuration page see

    某些項目默認設置是從樣式表導出的,這些樣式表是在常規項目配置頁的「項目默認設置」節中更新屬性時應用的樣式表,請參見
分享友人