geologic dam 中文意思是什麼

geologic dam 解釋
地質堤
  • geologic : adj. 地質學的,地質的。 a geologic survey 地質調查。adv. -ically
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. Moreover, there are drawbacks like difficulties in stimulation, complexity of calculation and heavy work in all these models because of many other factors. for example, the complexity of the dam structure, difficulties in measuring the physical and mechanical parameters of building materials and subgrade soil, stimulating the geologic structure of subgrade, predicting effects of loads, construction and environment on the dam and so on

    此外,由於大壩結構復雜,建築材料和地基巖土的物理力學指標難以測定,復雜地基的地質構造還很難模擬,荷載、施工及環境因素對水工建築物的影響還很難準確預測,應用各種模型都存在著模擬困難、計算復雜、工作量大等不足。
  2. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  3. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  4. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性靜、動力有限元分析程序對圍壩的4個典型剖面進行了靜、動力模擬模擬,模擬計算了壩體自填築至蓄水運行和發生7地震各階段壩體及壩基的變形以及應力分佈,地震應力響應和地震引起的超靜振動孔隙水壓力分佈以及永久變形。判斷了壩體和壩基中出現裂縫、塑性區以及地震液化的可能性。
  5. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  6. Engineering geologic problem of dam foundation excavation in guanyinge reservoir

    觀音閣水庫壩基開挖中的主要工程地質問題
  7. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  8. 3. based on the topography and geologic character of niutoushan arch dam abutment and base, and the interlayer and internal faults, which control the stability of the project, we build the three - dimensional geomechanical model and carry out the upto failure test by overload method. 4

    結合牛頭山拱壩壩肩壩基的地形、地質特徵,以及對穩定起控製作用的層間、層內斷層的分佈狀況,建立了三維地質力學模型,運用超載法對整體模型進行了破壞試驗。
分享友人