geologic structure 中文意思是什麼

geologic structure 解釋
地質構造
  • geologic : adj. 地質學的,地質的。 a geologic survey 地質調查。adv. -ically
  • structure : n. 1. 構造,結構;組織;石理,石紋。2. 建造物。3. 【化學】化學結構。4. 【心理學】(直接經驗中顯現的)結構性,整體性;整體結構。adj. -d ,-less adj.
  1. In the light of the special chanacteristics of china ' s geologic structure, li siguang applied the method of geomechanics to study the law of crustal movement

    有鑒於我國地質結構的特點,李四光運用地質力學的方法,來研究地殼運動的規律。
  2. Moreover, there are drawbacks like difficulties in stimulation, complexity of calculation and heavy work in all these models because of many other factors. for example, the complexity of the dam structure, difficulties in measuring the physical and mechanical parameters of building materials and subgrade soil, stimulating the geologic structure of subgrade, predicting effects of loads, construction and environment on the dam and so on

    此外,由於大壩結構復雜,建築材料和地基巖土的物理力學指標難以測定,復雜地基的地質構造還很難模擬,荷載、施工及環境因素對水工建築物的影響還很難準確預測,應用各種模型都存在著模擬困難、計算復雜、工作量大等不足。
  3. 2. adopt varied exploration method to check up on geologic structure of the all demonstration area

    2 、採取綜合手段進行勘察論證,進一步查清各試驗區的工程地質條件。
  4. Through the geological survey of no. 1 main - canal project of zhangfeng reservoir, this paper analyzes and evaluates on the landform and geomorphy, physi - geologic phenomena, stratigrasphic - lithologic characteristics, hydro - geologic conditions and geologic structure of the main canal, and the geological conditions of the earthquake zone and the project zone

    通過對張峰水庫一干工程的地質勘測,對乾渠的地形地貌、物理地質現象、地層巖性、水文地質、地質構造及地震和工程區地質條件進行了分析與評價。
  5. The engineering geology condition from the sections of xiangshou county of shiping to dashizhui of hejin of the yellow river were introduced from the aspects relating to geology such as geo morphy, geologic structure, stratum and earthquake were introduced in the paper and the preliminary opinions on the problems of navigation development work were also proposed in the paper

    從地貌、地質構造、地層、地震及有關地質現象等方面,介招黃河石坪(鄉守縣)至河津(大石咀)段工程地質狀況,對該河段在航運開發工作中的問題提出初步意見。
  6. Analytic method about chaos time - series in mine geologic structure

    礦井構造系統的混沌時間序列分析
  7. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  8. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  9. Abstract : tight trips often occur for hole undergauge during drilling in east sichuan oilfield. the paper analysis the causes of hole undergauge, proposes preventive and treatment measures which are to optimize design from geologic structure features, to use suitable fluid column pressure, to select different drilling fluid types, to adopt advanced drilling technology and perfect field technical management. therefore, good economic benefit will be obtained

    文摘:川東構造在鉆探作業中因井眼縮徑造成起下鉆的阻卡時有發生,文中對造成井眼縮小的原因進行分析並劃分為五類因素,提出應在地質構造特徵方面優化設計,採用合適的液柱壓力,選擇不同的鉆井液類型,使用先進的鉆井工藝和完善現場技術管理等措施進行預防和處理,將取得重大的經濟效益。
  10. Deep hole becomes less crowded demolition technology in geologic structure to supposed

    深孔松動爆破技術在過地質構造中的應用
  11. Geologic structure modeling is one of the main aim of seismic forward modeling and inversion method, while most of the current modeling systems could not meet the needs of the scientific research and product practices. the geological model input is very complex and very clumsy, so it is high time we solved it by new model description methods and new model input techniques

    構造地質模型的建立是地震正演模擬和反演技術的主要目的之一,但目前已有的很多系統尚不能滿足科研與生產的實際需要,構造模型的建立尤其是輸入工作還是非常繁瑣、復雜,缺乏比較先進、實用的模型描述手段和模型輸入技術。
  12. The builder bravely made an attempt to a series of unfavorable geological feature, complex geologic structure, and bad mountainous working region

    該條公路在建設中遇到了諸多復雜的工程問題,針對一系列不良地質水文情況,復雜的地質構造,惡劣的山區築路環境,公路建設者進行了大膽的嘗試。
  13. 3d nonlinear finite element method, compatible displacement method of different mesh and response spectrum of mode - superposition are used to analyze the intake tower - intake slope static and dynamic interaction, since the complexity of geologic structure. the rational results provide a feasible way for the similar projects analysis in the future

    論文採用三維非線性有限元法、非一致網格位移協調解法、振型分解反應譜法對復雜地質條件下的百色水電站進水口邊坡與進水塔的相互作用進行了靜、動力分析,得出了一些合理的結論,為今後類似的工程計算分析提供了一種可行的方法。
  14. However, the geologic structure of the carstic formation is complicated and the design, construction, quality testing method of the high - pressure grouting is developing rapidly. we have engaged lots of experiments and studies in xiangshuiriver reservoir on this subject. one of the purposes subject is to guide the design, construction of the curtain grouting in the xiangshuiriver reservoir and optimize the grouting design, the other is to be a reference example for other similar engineering

    但由於巖溶地質條件的復雜性,且高壓灌漿作為一項技術和工藝,在設計、施工、質量檢驗及效果評價等方面,仍然處在不斷發展的過程中,正是基於以上兩個方面的考慮,本課題結合響水河水庫高壓帷幕灌漿工程進行了大規模的試驗研究,一方面指導帷幕灌漿的設計與施工,達到優化設計方案的目的;另一方面對試驗資料進行分析研究,以期對同類工程有所助益。
  15. Influence of conditions of complex geologic structure on underwater drilling and its solution

    復雜地質條件下水下鉆孔方法
  16. At last, the paper interprets the geological background of the forming of landslides, and reveals the landform, stratum, lithology and geologic structure based on the etm + image. and also, the paper interprets the location and distribution of the specific disaster bodies based on the quickbird image. through the analysis of the extracted information, the paper considers : the geologic structure of fengjie county is complex, and lithology is crashed ; the terrane in the canyon segment is fairly stable ; the terrane in some segments of the southern bank will be less stable after the water is stored, because the rock is in the same direction and is apt to slip with human project

    最後在etm +圖像上對滑坡發育的地質背景進行解譯,提取了地形、地層巖性、地質構造等信息,在quickbird影像上詳細地圈定了滑坡災害體的實體位置及發育范圍,通過對所提取信息進行分析,本文認為,奉節縣地質構造復雜,巖性破碎;峽谷段巖層穩定性較好;南岸部分地段為順向巖層分佈區,人類工程活動容易誘發順層滑坡,蓄水后庫岸整體穩定性下降。
  17. Technology of advance detection by electric method and accurate detection of water geologic structure

    電法超前探測技術與礦井含水構造精細探測
  18. In the article, from phenomenon to theory, we have studied the characteristics of strong group seismogenic earthquakes and group activities and tried setting up 3d finite element model and studied the mechanism of strong earthquakes group activities, particularly, aiming at sichuan - yunnan special region, applying the latest research result of geologic structure and deep physical geography. it is only the original intention to set up a theoretical basal platform for earthquake analysis and prediction and to search for some ways for physical prediction

    本文試圖從現象到理論,研究強震的成組孕育、成組活動特徵,特別是針對川滇這一特定地區,應用地質構造和深部地球物理的最新研究成果,建立三維有限元模型,研究強震成組活動的機制,為地震分析預測研究搭建一個有一定理論基礎的平臺,探索地震物理預測的一些途徑,這正是本論文的初衷。
  19. Qianjiangping landslide, the maximum volume sliding after the first stage of water impounding in the three gorges reservoir is a typical high - speed rocky - bedding slide, which is similar to the famous vaiont landslide in geologic structure, evoked process and movement mode

    摘要千將坪滑坡是三峽一期蓄水后三峽庫岸發生的最大體積滑坡,是典型的水庫型巖質順層高速滑坡。
  20. During interpolation, the original frequency of seismic signal is kept very well without negative effect to the subsequent processing. 5. cubic curves are used to geologic structure model input, and the formation boundary becomes smooth, which is good to the forward modeling. this method could hold true to various background

    成功地將樣條曲線應用於地質模型輸入環節,保證了地質模型界面的光滑連續,並能夠廣泛適應于各種質量的模型底圖,為正演模擬取得良好的效果奠定了基礎。
分享友人