girder post 中文意思是什麼

girder post 解釋
大樑支承柱
  • girder : n. 【建築】縱梁,大樑,撐柱,撐桿,大型工字梁。 a framed girder構桁。adj. -less
  • post : n 1 (被指定的)地位,崗位;職位,職守。2 【軍事】哨所,站;哨兵警戒區;〈轉義〉哨兵,衛兵。3 基...
  1. Overcoming post - downwarping of long span pc continuous rigid frame girder by design measures

    連續剛構橋後期下撓設計措施
  2. Application of prestressed concrete in plate girder bridge with post - tensioning method without splice

    后張無粘結部分預應力砼在板梁橋中的應用
  3. Quality supervision on prestressed hollow girder construction with post - tensioning method

    后張法預應力空心板梁的施工質量監理
  4. Prestressing of post - tensioned prestressed concrete box girder

    后張法預應力砼箱梁的預制施工
  5. Post - tensioned pre - cast concrete simple - supported girder for railway bridge pro - stress

    預應力混凝土鐵路橋簡支梁靜載彎曲試驗方法及評定標準
  6. In this paper, the reinforcement method with steel plate adhering to a real queen - post girder in bridge was analyzed by using the space entity simulation model, and the effect was validated by load test on site

    摘要針對某座橋梁下部結構蓋梁採用粘鋼法進行加固,對其加固效果採用有限元模型進行模擬分析計算,並通過現場荷載試驗進行驗證。
  7. Analysis and evaluation of the reinforcement effect of steel plate adhering to the queen - post girder

    蓋梁粘鋼法加固的效果分析評價
  8. Especially the bridge engineering has to be concerned with high, new and difficult technologies. new technologies firstly adopted are post - tensioned prestressed concrete simply - supported box girder, assembly two - way prestressed concrete simply - supported t - girder, reinforced concrete continuous rigid frame, and steel - concrete composite continuous girder. all these have formed a series of new bridge structures taking prestressed concrete simply - supported box girder as main feature

    由於秦沈客運專線的特殊技術要求,在鐵路建設史上首次採用了后張法預應力混凝土箱形簡支梁、裝配式雙向預應力混凝土t形簡支梁、鋼筋混凝土剛構連續梁、鋼與混凝土結合連續梁等橋跨結構,形成了以預應力簡支箱梁橋跨結構為主要特徵的一系列橋梁新結構。
  9. Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load, temperature changes, shrinkage and creep of concrete and live loads, and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and live loads

    其次重點對跨徑為40m標準設計的裝配式后張預應力混凝土斜梁橋在恆載、溫度變化、混凝土收縮和徐變、活載作用下主梁的正應力、豎向變形和恆載、活載作用下主梁的剪應力進行計算分析。計算分析橫隔板在二期恆載、溫度變化、混凝土收縮、活載作用下的正應力、剪應力。
分享友人