golmud 中文意思是什麼

golmud 解釋
格爾木市
  1. Ximing city is the capital and a hub of communications of qinghai province. it has regular flights to beijing, guangzhou, shanghai, xian urumqi, chengdu and golmud and bus and train connections with other cities in qinghai or in the other provinces in china

    為黃教創始人宗喀巴的誕生地,西寧市是青海省的首府,也是交通樞紐,自西寧往北京廣州上海西安烏魯木成都及格爾木有定期及舊調重彈,通往省內外的公路鐵路以西寧為中心形成交通網。
  2. The first section, from beijing to golmud in qinghai province, was completed in 1984

    1984年青藏鐵路第一期工程-北京至青海格爾木段建成通車。
  3. The local residents are welcoming the arrival of the first train running from golmud to lhasa

    青藏鐵路是世界上海拔最高、線路最長的高原鐵路。
  4. Along with all of the aforementioned measures, the target of reducing the fixed number of employees and departments, enhancing productivity and efficiency, assuring safety and reducing labor intensity, should be realized. in this paper, ahp ( analytic hierarchy process ) method also be used to analysis and appraise the mode of mechanized track maintenance. the conclusion reflects that the mainframe - machine and mid - machine should be adopted in the section of the golmud - lhasa, minitype machine should be used as added equipment in the section of xining - golmud in order to complement the capability of the mai

    文章採用層次分析法( ahp法)對線路設備機械化維修模式進行綜合評價和分析,所得結論認為青藏鐵路格拉段宜採用大型機械化和中型機械化相結合的維修模式,西格段也是採用大型機械化和中型機械化相結合的維修模式最優,但仍可保留目前小型機械化作為補充維修力量,以補充大型和中型西南交通大學碩士研究生學位論文第頁機械能力的不足,充分發揮目前西格段的現有機械設備和維修經驗。
  5. Seismic fracture, fault fracture and permafrost fracture all gave negative effects on engineering construction and formed geological hazards at many localities along the golmud - lhasa highway and railway ice fractures formed in freezing rivers and lakes and on the top of pingos have not shown any hazard effect on engineering constructions up to the present

    地震破裂、斷層裂縫和凍土裂縫對青藏公路、青藏鐵路及沿線工程安全具有不良影響,這些地裂縫切割錯斷路基,形成路面破裂和路基滑塌,產生顯著的災害效應。
  6. Thoughts on water resources for sustainable development of golmud city

    對格爾木市水問題的思考
  7. About half of the golmud - lhasa 19 ) section was built over permafrost

    格爾木到拉薩段鐵道大約有一半是建在凍土上。
  8. The 1, 142 km ( 710 mile ) golmud - lhasa line certainly sounds impressive

    全長1 , 142公里( 710英里)的格爾木?拉薩線聽起來一定讓人印象深刻。
  9. But the 710 - mile section connecting golmud to lhasa was delayed indefinitely

    但格爾木至拉薩段由於種種原因被耽擱下來,最主要的是地理環境過于惡劣。
  10. The first half, from xining to golmud in qinghai province, has been running 14 ) regularly since 1984

    前半段從青海省的西寧到格爾木,早在1984年就開始定期行駛。
  11. The section of the golmud - lhasa started in 2001, is anticipated going into operation in 2006

    青藏鐵路格爾木?拉薩段已經於2001年正式開工,預計2006年投入運營。
分享友人