  1. Compute parameter data in rock mass quality assessment of the three gorge project dam foundation rock mass, and compare the results with former conclusion. the results accord with practical engineering projects

    對長江三峽大壩壩基巖體質量分級的參數指標數據進行試算,並將得到的計算結果與原結論進行比較,結果符合工程實際。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  3. To stand on the three gorge dam, you could see at plate force of unequal than any other hydraupower plant on earth

    站在三峽大壩頂上,你看到的是地球上最壯觀的水力發電站。
  4. They are used for connecting the sluice of the three - gorge dam and the gantry or disconnecting them

    該液壓系統為三峽大壩泄洪閘實現與門機聯接或脫開的系統。
  5. Once the reservoir begins to hold water after the accomplishment of the three - gorge dam located in shanduoping, yichang, some of the historical relics, such as the white - powered wall, the staircase of meng liang and the ancient plank road located at the entrance to qutang gorge, will be inundated completely

    位於西陵峽中上段宜昌三斗坪的三峽大壩一俟完工正常蓄水后,雖然瞿塘峽入口處的「粉壁墻」 、 「孟良梯」 、 「古棧道」等景觀將被淹沒。
  6. Through applying above theories and methods, safety monitoring model of temporary shiplock and ship lift dam sections in three - gorge project is studied. varying rule of dam displacement during construction period is analyzed by viscoelastic finite element, and safety monitoring model of dam displacement and stress during construction period is founded. rationality and validity of the model is validated

    ( 4 )應用前述的理論和方法,對三峽工程臨時船閘壩段、升船機壩段的施工期安全監控模型進行了研究;對施工期壩體位移變化規律進行了粘彈性有限元分析,同時建立了大壩施工期位移和應力的安全監控模型,據此對模型的合理性和有效性進行了驗證。
  7. Controlled quarry blasting for dam - filling materials in spillway at gongbo gorge hydropower station

    公伯峽水電站溢洪道壩料開采爆破控制
  8. The method of dynamic optimizing control management has acquired prominence effect in the process of concrete construction management of three gorges sluicing dam by phase. it is effective, secure and on schedule, and it will exert more great effect for the accomplish of final aim of the three gorge project

    動態優化控制管理法在三峽泄洪壩混凝土施工管理過程的實踐應用,已經取得了階段性高效、安全、正點的顯著成效,並將為三峽工程最終目標的順利實現發揮更大作用。
  9. The knowledge, such as mathematics statistic, 3d viscoelastic finite element, together with the knowledge of dam engineering, are introduced into the dissertation, which performs analysis and study on safety monitoring model of three - gorge project during construction period

    本文以三峽大壩為例,運用數理統計、三維粘彈性有限元等理論,結合壩工理論知識,對三峽大壩施工期安全監控模型進行了分析研究。