ground installation 中文意思是什麼

ground installation 解釋
地面設備
  • ground : adj 碾碎了的,磨過的,磨成粉的。 ground and polished piston 【機械工程】研磨活塞。n 1 地,地面;...
  • installation : n. 1. 就職,就任,就職禮。2. 裝置,設備。3. 安裝;設置;安置。4. 軍事設施。
  1. First installation in canada ( edmonton, alta. ). invention of small dial and two - wire system eliminating ground at subscriber ' s station

    電話系統首次在加拿大(阿爾塔省埃德蒙頓)安裝。發明小型撥號盤和二線系統,並取消用戶端的地線。
  2. Installation methods of power cables buried ground

    地下電力電纜的敷設方法
  3. This paper resolved the radar instructions based upon ground to the radar antenna control instructions by using the carrier aircraft attitude data provided by inertial navigation system of the aircraft and the radar installation data provided by radar database

    用載機慣導系統提供的載機姿態數據和雷達數據庫提供的雷達安裝數據,把基於大地的雷達指令解算為雷達天線控制指令。
  4. Available options and accessories such as ground plate, lift off protection, upper welding plate and welding gauge make the module extremely versatile and ensure a very easy installation and safe operation under rugged conditions

    可選配件有接地板吊裝保護上焊接板及焊縫檢查樣板。這些配件使模塊能用於各種用途,保證安裝方便,且在凹凸不平的情況下也能安全操作。
  5. By 1955 the sea hawk performance was already considered mediocre which led to the installation of the more powerful 5, 200 lb thrust nene 103 and the use of the sea hawk as a ground attack aircraft, cleared to carry external stores, a task at which the sea hawk excelled

    到1955年,因為「海鷹」的表現只能說是差強人意,所以換裝了推力為5 , 200磅的「尼恩」 103發動機,同時, 「海鷹」的角色也轉變為一架對地攻擊機, 「海鷹」攜帶的外掛武器完全可以勝任。
  6. Performance requirement for machinery electrization installation of fiber - optical communication equipment. machinery installation requirement for fiber - optical communication equipment of stationary ground

    光纖通信設備機械電氣安裝技術要求.地面固定式光纖通信設備機械安裝要求
  7. Performance requirement for machinery electrization installation of fiber - optical communication equipment. electrization installation requirement for fiber - optical communication equipment of stationary ground

    光纖通信設備機械電氣安裝技術要求.地面固定式光纖通信設備電氣安裝要求
  8. Practice has proven that metal oxide material used as deep well anode ground bed has the merits of maintenability, replaceability and easy installation

    實踐證明,金屬氧化物材料應用於深井陽極地床,具有可維護、可更換、施工方便的特點。
  9. Position the fuser film sleeve into heater, and the end of the film with ground ring should be in good contact with the conductive rubber gear of pressure roller or the conductive brush after installation

    請在安裝新定影膜前,在塑料架與定影膜接觸的部位均勻塗上硅脂,盡量在有棱的地方多塗點,以保證定影膜與塑料架的充分潤滑。
  10. Aeronautical ground lighting electrical installation. isolating transformer. equipment specifications and tests

    航空地面照明電子設備.絕緣變壓器的設備規范和試驗
  11. Aeronautical ground lighting electrical installation - isolating transformer - equipment specifications and tests

    航空用地面照明電氣設施.隔離變壓器.設備規范和試驗
  12. The installation area must be capacious and clean, lay paper or pearl brocade on the ground to prevent it from contacting the ground directly during installation

    安裝場地必須寬敞、干凈,將紙皮或珍珠棉平鋪在地上,避免傢具部件在安裝過程中與地面直接接觸。
  13. Supply, installation and commissioning of a ground reception system for meteorological data from multi - functional transport satellite for the hong kong observatory from date of acceptance to fulfillment of contractual obligations

    承投為香港天文臺供應一套多用途輸送衛星氣象數據地面接收系統,包括安裝及試機服務,由發出接納書當日至履行合約訂明的責任為止
  14. In case of the real limitations given by the objective circumstances where the requirement of 2. 5 meters in height can by no means be met, the height of installation may be appropriately lowered with the examination and approval of the district / county environmental protection departments in the locality, but the minimum height from the ground outside to the bottom of the racks shall be no less than 1. 9 meters

    確因客觀條件所限,無法達到規定高度的,經所在地的區、縣環境保護部門審批同意,可以適當降低安裝高度,但空調設備托架底端距室外地面的最低高度不得小於1 9米。
  15. Height form mold installation surface to ground

    模具安裝面至地面高度mm
  16. Supply of concentrate haemodialysis solution with bicarbonate powder buffer to the hospital authority and the department of health as a 24 - month contract from date of acceptance design, supply, delivery, installation, commissioning, maintenance of hardware, software and related services for the implementation of the automated tag and information display system for the immigration department on or before december 2006 supply of 320 000 kg. of polyelectrolyte type ii to the drainage services department as a 36 - month contract from date of acceptance provision of dental laboratory work for the department of health as a 24 - month contract from date of acceptance supply, installation and commissioning of a ground reception system for meteorological data from multi - functional transport satellite for the hong kong observatory from date of acceptance to fulfillment of contractual obligations supply and installation of 1 set of automated dna sequencing system to the department of health from date of acceptance to fulfillment of contractual obligations

    承投為醫院管理局和?生署供應高濃度血液滲析液連炭酸氫鹽緩沖粉劑,合約由發出接納書日期開始,為期24個月為入境事務處於2006年12月或之前推行自動化籌號及資訊顯示系統供應硬體和軟體,包括設計、送貨、安裝、試機、保養及有關服務為渠務署供應320000公斤高分子電解質(第ii類) ,合約由發出接納書日期開始,為期36個月為?生署提供牙科製品服務,合約由發出接納書日期開始,為期24個月為香港天文臺供應一套多用途輸送衛星氣象數據地面接收系統,包括安裝及試機服務,由發出接納書當日至履行合約訂明的責任為止為?生署供應和安裝一套核酸序列自動測定系統,由發出接納書當日至履行合約訂明的責任為止
  17. In view of the problems in the design of the large andmedium - sized indoor substations built by guangzhou power bureau in recent years, points for attention in the design of indoor substations are expounded in terms of ventilation, cable channel, reservation of hangers and space for transportation and installation, ground wire, lighting for the whole substation, etc

    僅僅推力頭軸、孔存在間隙時,推力頭其它零件製造質量與安裝質量達到設計要求,是不會影響精確徑向定位的.爾王莊泵站9機組出現的環鍵與平鍵斷裂情況,可能不是由軸、孔間隙過大引起,而是其它尚未查明的原因
  18. Standard guide for installation of direct push ground water monitoring wells

    直接推動式地下水監測井安裝的標準指南
  19. The installation of pig receiver & launcher is divided into above ground installation and underground installation

    收發球筒安裝分地面安裝及地下安裝兩種形式。
  20. For above ground installation, the receiver & launcher shall be horizontal, which center is about 1m high from ground, and shall be connected to underground pipe by nozzle stub and bend but not skewed crossing connection

    地面時,收發球筒為臥式,中心距地面高度一般為1米左右,通過短管及彎管與地下管線連接,不宜採取斜交叉連接。
分享友人