guangzhou metro 中文意思是什麼

guangzhou metro 解釋
廣州地鐵
  • metro : n. 〈英國〉1. = the Metropolitan Railway. 2. 地下鐵道。3. 〈m-〉大都市地方政府。adj. 〈m-〉大都市的。
  1. Then it discusses the signaling system in guangzhou metro line no. 4 and points out the necessity and possibility of adopting the moving - block signaling technology for its linear motor carrying system

    在此基礎上,對廣州地鐵四號線信號系統的選擇進行了探討,指出了廣州地鐵四號線直線電機運載系統採用移動閉塞技術的必要性和可行性。
  2. With a brief introduction of the management organization, the compilatory and checking program, the safty inspection and encouragement regulations carried out in guangzhou metro line 1, the author holds that the management in metro line 1 has proved to be successful, but some faults in operation shall be taken as useful lessons as well

    摘要介紹了廣州地鐵1號線工程計劃管理的架構、編審程序、檢查及激勵機制等情況,總結了廣州地鐵1號線計劃管理的成功經驗及教訓。
  3. Application of sitras dpu96 to guangzhou metro line no

    96在廣州地鐵2號線的應用
  4. Based on a typical station in guangzhou metro line 5, in which the station hail floor and the platform floor are separated, the relationship between the building layout of metro station and the environmental conditions of station site, and some problems such as the indeterminacy, multiplicity and flexibility of the building layout are emphasized

    摘要通過分析廣州軌道交通5號線站廳、站臺層分離的典型車站,著重論述地鐵車站建築布置形式與站址環境條件之間的相互關系,以及建築布置形式的不確定性、多樣性和靈活性問題。
  5. Autocontrol of centralized cold station in guangzhou metro

    廣州地鐵集中冷站的自動控制
  6. Based on the engineering experience in guangzhou metro line 1 and line 2, the schemes of mobile communication system switches in various conditions are discussed, including switching between plots in the tunnels, between upper floor and lower floor in the interchange station, between inside and outside of the interchange stations and between tunnels and floor

    摘要結合廣州地鐵1 、 2號線工程經驗,對地鐵移動通信系統的各種條件下的切換方案設計進行探討,包括隧道間小區切換、換乘站的上下層切換、站內和站外切換、隧道和地面切換等。
  7. This paper analyzes the cause of small concaves around the welding seam in the long rail of guangzhou metro line 2, and presents preventive measures, such as increasing the under layer of the rail, limiting the weld seam, lowering the welding temperature etc

    摘要結合廣州地鐵2號線接觸焊焊接長鋼軌的實踐,分析了產生焊頭表面小凹痕的原因,提出改變墊高鋼軌的方式、縮小正火范圍、降低正火溫度、限制接頭錯牙量等預防措施。
  8. Based on the construction of guangzhou metro line 3 welding process and quality control, this paper introduces the mobile contact welding, analyzes some key points during the process of welding, such as welding of rails in curved sections, environmental protection, the measurement of straightness on the welding junctions located in curved sections, the maintenances of equipment etc., holds that more attention shall be given to these points

    摘要介紹了移動式接觸焊在廣州地鐵3號線中的施工工藝及施工過程;分析施工過程中應該注意的曲線鋼軌焊接、環境保護、曲線鋼軌焊接接頭平直度的測量、設備維修保養等技術要點。
  9. The design for automatic fas in guangzhou metro line

    廣州地鐵3號線火災自動報警系統的設計
  10. Based on the integrated debugging drill management experiences of guangzhou metro for the modified project of line 2, the first operating section of line 3 and the university - town section of line 4, the paper analyzes and discusses the management mode of the multi - line integrated debugging drill in urban rail transit, and demonstrates that the application of project integrated management is effective in large - scale integrated debugging drill of urban rail transit

    摘要系統地總結廣州地鐵2號線調整工程、 3號線首通段、 4號線大學城專線同時開通前的綜調演練管理經驗,通過對城市軌道交通系統的多線綜調演練管理模式的分析和探討,證明項目集成管理在城市軌道交通大規模綜調演練中的應用是可行有效的。
  11. Experiments have failed in the process of debugging station fire mode of the first opening segment of guangzhou metro line 3, the main reason is the delay protect module of wind valve which cut off power supply

    摘要廣州地鐵3號線首通段車站火災模式調試過程中,出現火災模式執行失敗,主要原因在於風閥延時保護模塊動作切斷電源。
  12. The application of network and communication techniques in scada system of guangzhou metro line no

    網路和通信技術在廣州地鐵1號線電力監控系統中的應用
  13. Guangzhou metro line 1 starts from guangzhou east railway station via tianhe sports center, along zhongshan road westward to zhongshan qilu and then turns southward, extends through zhujian channel and liwan districts and other old city areas

    廣州地鐵一號線由天河火車東站起,經天河體育中心,沿中山路向西,至中山七路折向南面,穿過珠江隧道,沿花地大道直至西朗站,橫跨越秀、荔灣等老城區。
  14. The guangzhou port group provides the heavy and large piece handling service. it has successfully discharged heavy machines for guangzhou metro, sinopec guangzhou and guangzhou ethylene

    重大件貨物作業是廣州港集團的重要服務產品之一。近年來,集團為廣州地鐵、廣州石化和廣州乙烯等重大工程項目安全、優質、高效地接卸了一大重大件設備。
  15. Through the analysis of karat geological conditions of guangzhou metro no. 2, 3, 5 and 6 number lines, the method and measures were proposed for metro survey and design

    摘要通過對廣州地鐵2 、 3 、 5 、 6號線經過地段的隱伏巖溶區地質條件的分析,提出地鐵勘察、設計的方法和措施。
  16. Based on the practice in psd system design in hongkong metro and guangzhou metro, the functions, social benefit, economic returns of psd system in metro arc presented, and its application prospect in building new metro lines and rebuilding old ones is put forward

    摘要結合香港地鐵、廣州地鐵屏蔽門系統的設計實際,闡述屏蔽門系統在地鐵中的功能以及社會效益、經濟效益,並指出屏蔽門系統在今後地鐵新線建設及舊線改造中的應用前景。
  17. Some experiences on guangzhou metro are summed up and some suggestions on the present design of shield driven tunnel are put forward

    總結了廣州盾構隧道設計中的成功經驗,並對當前盾構隧道設計中有關問題提出了建議。
  18. Construction options for the running tunnels on no. 3 line of guangzhou metro

    上跨既有地鐵盾構隧道的深基坑開挖支護技術
  19. The paper presents the development of the station network schemes for monitoring control system for electromechanical equipment of guangzhou metro, including local area network for communications within the station, plc controller and the configuration structure and characters of site concentration line and so on

    摘要主要介紹廣州地鐵機電設備監控系統車站級組網方案的發展及演變過程,包括站內通信局域網、 plc控制器、現場總線等的配置結構和特點。
  20. Taking appropriative train test line of guangzhou metro line 2 as an example, this paper introduces the equipment, function and characters of signal system and service conditions of interfaces

    摘要以廣州地鐵2號線的專用試車線為例,分析其信號系統的設備概況、功能及特點,介紹各介面的使用情況。
分享友人