  1. 2 a guarantee period of 12 months shall start from the date of equipment acceptance certificate or 14 months start from the date of b / l, whichever comes earlier

    質保期應為設備驗收證書簽署之日起12個月,或海運提單日後14個月,以先到者為準。
  2. The guarantee period of the equipment supplied by the seller shall expire after 12 ( twele ) month counting from the date of final acceptance certificate as per chapter 7 of the present contract

    賣方所提供的設備保質期按照合同第七章的規定:從最終驗收合格證書接受日開始算起,有效期為壹年( 12個月) 。
  3. The guarantee period of the equipment supplied by the seller shall expire after 12 ( twelve ) month counting from the date of final acceptance certificate as per chapter 7 of the present contract

    賣方所提供的設備保質期按照合同第七章的規定:從最終驗收合格證書接受日開始算起,有效期為壹年( 12個月) 。
  4. For that equipment for which operation is started before the date of the final acceptance certificate, the guarantee period of 12 ( twele ) months shall commence from the date of operation and that part of the equipment shall be deemed as accepted

    如果在驗收合格證沒有下來之前運行設備的話,那麼就默認為已經接受該設備了,並自機器運行之日起開始計算保修期( 12個月) 。
  5. For that equipment for which operation is started before the date of the final acceptance certificate, the guarantee period of 12 ( twelve ) months shall commence from the date of operation and that part of the equipment shall be deemed as accepted

    如果在驗收合格證沒有下來之前運行設備的話,那麼就默認為已經接受該設備了,並自機器運行之日起開始計算保修期( 12個月) 。
  6. The main management work at the time of completion in project is handing over, acceptance check, guarantee and return visit etc. though every project of construction have his own characteristic, it is similar on management process and main management link, so long as we regard project under construction as a whole to manage systematically, we may make the good management result

    項目竣工期的管理工作主要是項目對業主的交接、驗收與保修和回訪等工作。盡管每一個工程建設施工項目都有自己的特點,但其管理過程和主要的管理環節是相似的,只要我們把施工項目當作一個整體加以系統管理,就有可能取得良好的管理效果。
  7. Firstly, it aims at the deficiency in cost managing of the project items in our country from the objective and subjective ways. the objective is the system of the lowest acceptance and growing material price and the system of cash guarantee ; the subject is the weaker cost managing and wrong reorganization of cost managing and the weaker controlling cost and neglecting the analyses of the other cost except for

    客觀方面分析了最低價中標制度、原材料價格上漲、現金保證金制度三個市場因素,主觀方面從成本管理意識薄弱、在工程成本管理認識上的誤區、成本管理體制的不完善、成本控制能力的薄弱、忽視除施工成本對的其他成本的分析控制、成本管理計算手段落後、缺乏分析檢查機制等七個方面進行了的分析和探討。
  8. As revealed by the study, following problems exist : 1 ) the supply of bank capital has a close relation with the fluctuation of stock market ; 2 ) the volume of bank capital flowing into stock market is large and it is estimated that there are 450 - 600 billion of bank capital exist on stock market, 2 / 3 of which are illegal ; 3 ) most bank capital are getting into stock market through illegal channels, such as illegal repurchase of government securities, illegal acceptance and discount of trade bill, embezzlement of customers " guarantee deposit, illegal interbank loan, illegal diversion of credit capital to other purpose, etc. the inflow of bank capital to stock market has dual influences on our economy and finance

    表現在: ( 1 )據估計我國進入股市的銀行信貸資金存量在4500 - 6000億元左右,其中滯留於一級市場的資金規模約為2000 - 3000億元,進入二級市場的規模在2000 - 2500億元之間,國有股和法人股轉讓市場涉及信貸資金規模約為500 - 600億元,然而,在這千億元進入股市的信貸資金中2 3左右都是違規流入的。 ( 2 )銀行資金入市除同業拆借、國債回購和股票質押貸款三種合法渠道外,多是通過非法渠道流入股市的,其途徑主要包括:違規國債回購、違規商業匯票承兌及貼現、挪用客戶保證金、違規拆借資金、企業違規挪用銀行信貸資金、個人違規使用銀行貸款等。
  9. Other documents, if any : - pre - acceptance certificate signed by both parties. - bank guarantee for 95 % of the total contract value issued by the sellers bank to cover the period until date of delivery to the buyers site

    其它單證文件,如有- - -雙方簽訂的預簽收證明;賣方銀行出具的在貨物到達買方之前保值95 %合同金額的銀行保證。
  10. X ) other documents, if any : - pre - acceptance certificate signed by both parties. - bank guarantee for 95 % of the total contract value issued by the sellers bank to cover the period until date of delivery to the buyers site

    其它單證文件,如有- - -雙方簽訂的預簽收證明;賣方銀行出具的在貨物到達買方之前保值95 %合同金額的銀行保證。
  11. Along with national macroscopic control, the market of road project becomes more and more competitive, such as the price of contract is worse. the industry is threshed by three market injections, that is increasing material price, the lowest acceptance and cash guarantee. the above make the industries of road project under the situation of the lower profit and harder capital running and greater competition pressure

    隨著國家的宏觀調控,公路工程建築市場競爭日愈加劇,其承包價格戰進入了白熱化階段,而且自2003年以來,還不斷受到建築原材料價格上漲、最低價中標制度、現金保證金制度三個市場因素的嚴酷沖擊,直接導致公路工程施工企業利潤大幅下滑和資金運轉困難,企業面臨極大的競爭壓力,生存環境不容樂觀。
  12. In terms of normal and past routine, free repair within the period of guarantee of equipment should be calculated from the date of acceptance check not the date of shipment

    按照通常和以往的慣例,設備的保修期應從設備開箱驗收合格之日起計算,而非貨物的裝運日期
  13. But with the expansion of the business of the banker ' s acceptance bill, its problems are exposed apparently day by day. it ' s urgent to study the legal system of the banker ' s acceptance bill. we ' d guarantee its circulation and use by the high principle of rule of law

    近年來,銀行承兌匯票正以其特有的優勢迅速推廣使用,但隨著銀行承兌匯票業務的擴展,其存在的問題也日益顯露,這就急需對銀行承兌匯票的法律制度進行研究,從法治高度保障其流通和使用。