head installation 中文意思是什麼

head installation 解釋
首站設施
  • head : n 1 頭,頭部,首。2 頭腦,才能;智力,想像力,理解力。3 前部,上部;頂端,尖突部;船長;(書頁等...
  • installation : n. 1. 就職,就任,就職禮。2. 裝置,設備。3. 安裝;設置;安置。4. 軍事設施。
  1. Other features : vessel head high strength and durability of stainless steel d - rings ; paddle with the sliding lock locks connect parade as more flexible ; stern plate has a unique optimal angle, height and installation of aluminum alloy plate ; rope with haste, be lifesaving ; plus side of durable bull fender, the collision can play protective role

    其他特點:船頭部採用高強度和耐用的不銹鋼d型環;船槳鎖採用滑鎖連接,操所更加靈活;艉板具有獨特的最優角度,高度以及安裝有鋁合金墊板;裝有急用救生繩;船邊加有耐用防撞護舷,在碰撞時能起到保護作用。
  2. The computer manager is the administrative and technical head of the installation.

    計算機主任是計算機服務中心的行政和技術主管人。
  3. Analysis on transient process in low - head pumping installation during starting period

    低揚程水泵裝置起動過渡過程分析
  4. Analysis on transient process in low - head pumping installation during its suspending period

    低揚程泵裝置停泵過渡過程分析
  5. Step 6 : after complete the grouting and curing work between all the installation work in the liner ( including process piping, pipe support, etc. ) & liner and rock bed, complete the installation work of top elliptic head of liner using 35 / 50 ton hyd - crane and 25 ton truck crane

    第六步:待襯管內所有的安裝工作(包括工藝配管、管道支架等)及襯管與巖床間的灌漿、養護工作完成後,用35 / 50噸液壓起重機和25噸汽車起重機完成襯管頂部封頭的安裝工作。
  6. Elastic filter head, excellent installation seal

    濾袋頭一體成型與濾袋緊密貼合。
  7. This the production thread application plc carries on procedure control, and realizes to crowd out machine owner ' s electrical machinery and synchronization towing the mechanical and electrical machine is transferred fast ( ly ), and the installation has the good man - machine interface, and all technology parameters all can be set up and show by way of touching the screen, and producing to consult the menu, the order name was formerly fixed in the input, and whole production line just can be according to primary pipe specifications and speed production fixing every time ; cutting the function voluntarily fixed long ( ly ) cuts, and a pattern head temperature is controlled to use the import intellect warm accuse table ( making the temperature deviation within ), therefore having pledged the quality of tube

    本生產線採用plc進行程序化控制,實現擠出機主電機、牽引機電機的同步調速,並設置有良好的人機界面,所有工藝參數均可通過觸摸屏進行設置和顯示,每次生產只需查閱菜單,輸入原先設定序號,整條生產線就可按原設定的管子規格和速度生產;切割機能自動定長切割,模頭溫度控制採用進口智能溫控表(使溫度偏差在1內) ,因此保證了管材的質量。
  8. Sensing element, protective tube, connection head and fixed device for installation

    它是由感溫元件保護管接線盒及安裝
  9. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)水電站是黃河幹流上的一個梯級電站,為了減少征地移民損失,經對炳靈水電站(塔坪壩址)尾水斷面在劉家峽水庫不同運行方式下的水位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽水庫汛限水位,將電站樞紐選址在其電站庫尾內。
  10. The installation ceremony of professor leung yuen sang, professor of history of the university, as new head of college was also held in the service. the installation ceremony was officiated by mr. karl c. kwok, chairman of the college board of trustees

    而新任崇基學院院長梁元生教授就職典禮亦於本年度校慶感恩崇拜典禮中舉行,該就職典禮由中大崇基學院校董會主席郭志梁先生主持。
  11. The aerial head must fit at outdoors. dropped down the aerial head upgrade could see 360 of firmament in principle. the picture 6 gives out accurate and incorrect of installation

    天線頭要安裝在室外,原則上是順著天線頭往上看能夠看到360的天空。圖6給出了正確的和不正確的安裝的圖。
  12. Multi - point sheathed thermocouple as a late - model temperature sensor consist of connection head, multi - point sheath element and fixed device for installation. and are used for measuring temperature of different depth, layer and location

    多點鎧裝熱電偶阻可用測量各種場所不同深度不同載面不同位置的溫度,它是由接線盒,多支鎧裝元件,安裝固定裝置等主要部件組成的新型溫度傳感器。
  13. Separate head and body for convenient transportation and installation

    機頭和機架分離設計,便於運輸和安裝
分享友人