head river 中文意思是什麼

head river 解釋
河源段
  • head : n 1 頭,頭部,首。2 頭腦,才能;智力,想像力,理解力。3 前部,上部;頂端,尖突部;船長;(書頁等...
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  1. The head of the police, who had driven out that morning by count rastoptchins command to set fire to the barques in the river, and had received for that commission a large sum of money, at that moment in his pocket, ordered his coachman to stop on seeing a crowd bearing down upon him

    局長這天上午奉伯爵之命去燒毀貨船,執行任務時撈到了一大筆錢,這筆錢正揣在他口袋裡,看到朝他走來的人群,叫車夫停車。
  2. The upper of the east model boundary remains constant head and the at the lower of it, there might exists a diffluent interface. so the east and west sides of the diffluent interface are respectively the drainage area of east and west karst - groundwater of yellow river

    模型東界上部以黃河水位為第一類水頭已知邊界,下部必存在一個分流面,分流面東西兩側分別是黃河東西兩塊巖溶水的排泄區,該分流面可視為零流量邊界。
  3. Head push experiment of mulberry of british the name of a river in shaanxi and henan provinces to stand, have edaphic sample of near 200 years, make the important material that studies climate change and soil now

    首推英國洛桑實驗站,有將近兩百年的土壤樣品,現在成為研究氣候變化和土壤的重要資料。
  4. Baise hydraulic power plant lies in the head of yujiang river, which is 22km away from baise city

    百色水電站位於鬱江上游,在百色上游22km處。
  5. Su min hotel in the world natural and cultural heritage in wuyishan national tourism resort downtown center - su min walk street east, a beautiful environment, convenient transportation ; and scenic areas from across the river, raised considerable shan king, bow the head upon hydroacoustic

    蘇閩大酒店位於世界自然與文化遺產地武夷山國家旅遊度假區繁華中心-蘇閩步行街東段,環境優美,交通便捷與風景區隔溪相望,仰頭可觀山景,俯首可聽水聲。
  6. From mediterranean harbor and head for lost river delta

    前往失落河三角洲。先去取得新游樂設施
  7. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪水位、河床以及杭州灣北岸深槽的影響
  8. What impeded bloom from giving stephen counsels of hygiene and prophylactic to which should be added suggestions concerning a preliminary wetting of the head and contraction of the muscles with rapid splashing of the face and neck and thoracic and epigastric region in case of sea or river bathing, the parts of the human anatomy most sensitive to cold being the nape, stomach, and thenar or sole of foot

    布盧姆原想對斯蒂芬做一些有關衛生和預防方面的勸告,並且想告訴他,在進行海水浴或河水浴之前,應該先把頭部弄濕,還往面龐頸背胸部與上腹部猛然澆水, ?使筋肉收縮,因為人體對低溫最敏感的部位乃是后頸胃部和腳心。
  9. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  10. The congarees, a frontier fort on the west bank of the congaree river, was the head of navigation on the santee river system

    位於congaree河流西岸的congarees是一個貿易邊境站,同時也是santee流域的領航點。
  11. So, river capture can be taken as the time and space scale of geomorphologic evolution in quaternary in csmasr it can represent the process of river head wards erosion, expand of lincheng period denudation surface and the broken of yangping period denudation surface

    認為河流襲奪是判斷地貌演進,即臨城期(第四紀)溯源侵蝕與仰平期剝夷面解體破碎的時空標尺,並據此探討了臨城期河流溯源侵蝕的時空格局。
  12. I ducked down, pushed between two men, and ran for the river, my head down.

    我身子往下一閃,推開兩個人,低著頭往河邊直跑。
  13. This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station

    本文針對黃河上游即將開工建設的拉西瓦水電站700mw水輪機的參數選擇進行了研究,通過對國內外的大容量、高水頭水輪機的比轉速統計計算,利用水輪機的相似理論,採用回歸統計計算方法,統計出了比轉速統計方程,並進行了水輪機主要參數選擇論證,提出了適合拉西瓦水電站水輪機的主要目標參數。
  14. Using this as our base, the first day we go to hsitzuwan bay to swim and watch the sunset. at night you can stroll along the ai river and enjoy the evening scenery. early next day we head to takao hill to observe the macaque monkeys, and in the afternoon we visit the import shops at new chueh chiang and old chueh chiang

    以此為基點,首日到西子灣游泳觀夕照,夜晚愛河邊散步賞夜景,隔日清晨上柴山觀獼猴,下午則到新舊堀江兩處舶來品商場購物,同時滿足愛好名牌與年輕品味的觀光客。
  15. Discussion on optimizing design of stilling pool in low - head sluice across river

    低水頭攔河閘消力池優化設計探討
  16. I went up and set down on a log at the head of the island, and looked out on the big river and the black driftwood and away over to the town, three mile away, where there was three or four lights twinkling

    我上了岸,坐在島頂端一根圓木上,朝外一望,只見前邊是大河,還有黑森森漂流著的木頭,三英里路外便是鎮上了,只見三四點光亮在閃閃爍爍。
  17. Based on the urgent need that pier protective device primarily designed needed to be tested its crashworthiness by the impact of ship in multi - situation, etc in multi - angle and multi - water, the writer analyzed the critical elements that affect the simulation of the collision between ship and pier protective device, and found the feasible way to deal with the conflict between calculation efficiency and precision. using this method and employing ansys / ls - dyna program, which is the universal nonlinear dynamic analysis software, a head - on collision between ship and pier protective device designed for guanzhou river bridge is simulated and presented, the simulation of time history course of full - scale mini - collision between ship and pier protective device was taken into reality with a spot of elements ( less than 21000 ) and scanty time ( 9 hours on p4 pc )

    本文在前人研究的基礎之上,結合船橋碰撞實例,對碰撞計算機模擬模擬的關鍵技術進行了研究,在效率與精度的矛盾中找到平衡,對一艘2000噸級散貨船橫橋向正撞廣東管洲河大橋橋墩防撞鋼套箱這一種工況進行了計算機模擬模擬,實現了以較小的單元和較短的時間模擬碰撞的時間歷程,模擬滿足工程精度要求,解決了目前碰撞模擬計算周期太長的問題,同時模擬模擬得到的結論對該類防撞裝置提供了有價值的參考。
  18. In the end, he came to a river and took a bath. then he made a rope bed among eight sal trees, with each direction has two. he lied on his side, right hand supporting his head, the other resting on his body

    佛在毗舍離城的時候,已經有了重病,在那裡度過雨季,偕弟子們向西北走去,路上受了鐵匠純陀供獻的食品,病更加劇,最後走到拘屍那伽一條河邊,洗了澡,在一處四方各有兩棵娑羅樹的中間安置繩床,枕著右手側身臥著。
  19. Visual modflow computer code was selected to simulate heads distribution, calculate the zone budgets of the area, evaluate the effect of external stresses on the groundwater head, to determine how much water would be diverted from the river as the result of pumping and to demonstrate how the groundwater model can be used as a comparative technique to formulate a new approach for the quantitative groundwater vulnerability assessment in order to optimize utilization of the resource

    在分析河床沉積物滲透性對模型結果的影響時,採用了實際野外水文地質條件而不像前人所採用的假想模型。本論文用visualmodflow建立數值模型模擬預測了地下水水頭分佈,計算區域的水均衡,分析源匯項對地下水水位的影響。在此基礎上進行了全區的地下水脆弱性評價,為地下水資源的合理開發利用提供依據。
  20. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多沙河流上,無論是高壩大庫的高水頭電站,還是低水頭河床式樞紐,電站進水口的取水排沙歷來是一個倍受關注的問題。
分享友人