heat and power plant 中文意思是什麼

heat and power plant 解釋
熱電廠
  • heat : n 1 熱;熱力;熱度;熱量。2 體溫;發燒。3 (氣候的)高溫,暑氣。4 【冶金】熔煉的爐次;裝爐量;一...
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  1. This kind of device effect fine, specially offer to heat power plant use for such as fluidized bed furnace, coal powder pipe line, furnace negative pressure and flue negative pressure measuring to blow continually, as to prevent coal powders and bacco ashes stop up the sampler, ensure automation instrument of power plant normally running and production security

    這種裝置效果良好,專供國內外火電廠硫化床爐煤粉管道爐膛負壓和煙道負壓測量中連續吹氣用,以防煤粉和煙灰堵塞取樣頭,確保電廠自動化儀表正常運行和生產的安全性。
  2. Tests and analyses performed by experts and technical personnels show that, the brown coal used by hongwei power plant is extremly prone to produce reside in the process of power generation. this paper discusses the problem of burning residue in the coal fired boiler 410t / h of hongwei heat & power plant

    本文對宏偉熱電廠410t / h燃煤鍋爐的煤灰特性等進行了試驗分析,試驗結果表明,宏偉熱電廠燃用的褐煤是一種有嚴重結渣傾向的煤,運行中極容易結渣。
  3. Through the study on the character of hydrokinetics and heat transfer and combustion and dynamic of cfbb, three kind of single fuzzy controllers and a kind of synthetically fuzzy controller are designed, and control system is analyzed in some one power plant, and the three kind of control scheme are simulated on deferent objects

    本文通過對循環流化床的流體動力學特性、傳熱學特性、燃燒特性和動態特性等的研究,設計了三種單模糊控制器和一種綜合模糊控制器,分析了某一電廠實際控制系統,並對這三種控制方案進行了變對象的模擬。
  4. Presents the steady - state programming with constant coolant average temperature and constant live steam pressure, an ideal programming for marine nuclear power plant ( npp ), under which, both the coolant average temperature and the live steam pressure of nuclear steam supply system ( nsss ) are constant when the steady state operating condition is varied, and points out that in comparison with the steadysate programming with constant coolant average temperature, the ideal programming can improve the overall operating performance of npp effectively, especially in low - load range, for instance, raise the heat efficiency of npp, decrease the operating noise of main coolant pump, and improve the conditions of design, operation and control of the secondary loop system

    雙恆定運行方案是船用壓水堆核動力裝置的理想運行方案.在這種運行方案下,當裝置穩態功率變化時,冷卻劑平均溫度與蒸汽壓都保持不變,與通常採用的冷卻劑平均溫度恆定運行方案相比,有效地改善了核動力裝置的總體運行性能,特別是在低負荷運行時,可以提高裝置經濟性、降低主泵運行噪聲、改善二迴路系統的設計、運行和控制條件,這對于提高船用核動力裝置的運行可靠性和安全性具有實際意義
  5. Subsequently, we introduce some monitoring model and implement currently used, then we release our model, which suit the 1 # boiler of beilun power plant, on the basis of the models before. our model is subdivided into three categories, each category suit the heat exchanger of deferent type : the furnace, convective surface and trisector air preheater, all these categories use clean factor as the indication of the soot desposition level

    首先介紹了鍋爐灰污染危害的現狀,對比研究了國內外的灰污染監測手段和監測模型,並針對北侖1 #鍋爐,建立了鍋爐各受熱麵灰污染監測模型,這些監測模型分為爐膛、對流受熱面、以及三分倉空預器三種類型,採用清潔因子作為受熱麵灰污染狀況的指標。
  6. The # 9 and # 10 142mw heat supply units in gansu xigu power plant, the steam extraction main pipe system adopt westation control system of westing house company and deb coordination control policy in design. the coordination control policy successfully expand the whole the running range, from the normal running condition to abnormity running condition and start or stop condition, which simplicity base on burthen and main steam pressure coordination control

    甘肅西固熱電廠# 9 、 # 10142mw抽汽母管制供熱機組,選用美國西屋公司westation控制系統,設計、應用了deb協調控制策略,從單純作為負荷和主蒸汽壓力控制協調的基本功能,成功擴展到整個運行范圍,即從正常運行工況到異常運行工況及啟、停工況。
  7. Zoo animals manure - facture power in germany berlin reuters - animals at a munich zoo will create their own power supply from friday when their manure is recycled to generate heat and electricity. a biogas plant at the muenchner tierpark hellabrunn will be fuelled by dung from elephants, rhinoceroses, buffaloes and antelopes, and any left - over animal food

    據路透社12月13日報道,德國慕尼黑市一家動物園里的動物們將會從12月15日起在能源使用方面做到真正意義上的「自力更生」 ,因為該動物園的管理者已經決定將動物糞便加以循環利用來產生熱能和電力。
  8. The technical measures for deep reducing coal moisture were urgent needed due to china devoting major effort to implement the new and high technologies used for coal liquefaction and preparation high purity coal. through the analyses of current situation of technical level for coal drying and dewatering, the paper suggests to take overheat steam produced from power plant as a heat source, use the disk dryer to deeply reduce coal moisture with simple working process and low production cost

    本文針對我國人力實施煤炭液化和超純煤制備等高新技術,迫切需要將煤中水分深度脫除的技術手段,通過對我國煤炭乾燥脫水技術現狀與水平的分析,提出以電廠過熱蒸汽為熱源,利用盤式乾燥機,以簡捷的乾燥工藝、低的乾燥成本,深度脫除煤中所含水分的技術方案。
  9. They can be applied to electric power automatic control in many fields such as heat power plant, heat - electric generating plant, hydroelectric power plant, electric network, substation, pumping station, hydro - junction etc. and for electric power dispatching telecontrol system by telemetering and remote control, and field electric energy monitoring of the utilization and distribution equipment in numerous enterprises, can widely apply to electric power, water conservancy, metallurgy, petrochemical industry, chemical industry, railway, port, municipal administration, construction material, post and telecommunication, tobacco, papermaking, spaceflight base, civil aviation airport, hospital and school etc, many profession and field

    適用於火電熱電水電電網變電站所泵站水利樞紐等方面的電力自動控制和進行遙控遙測的電力調度遠動系統,以及眾多企事業單位用電配電設備的現場電量監控等。可廣泛應用於電力水利冶金石化化工鐵路港口市政建材郵電煙草造紙航天基地民航機場以及醫院學校等多種行業或領域。
  10. Ash deposition on boiler heat exchanger surface is a common phenomenon in fossile fuel powered power plant. this paper focuses on the research building a suitable model of soot deposition status of heat exchanger surface, and constructs a online monitoring system based on the built models. this will provide a reliable foundation to the optimal scheduling of the soot blowers

    本文針對鍋爐受熱麵灰污染危害嚴重的普遍現象,以北侖電廠600mw1 #鍋爐作為研究對象,進行了有關電站鍋爐受熱麵灰污染在線監測的研究工作,為吹灰優化經濟運行提供了可靠的依據。
  11. Development of large coal mines, high - efficiency production technical equipment of coal, development and utilization of coal gas resources, high - efficiency and low - pollution large coa1 generating system, power plant of urban heat and power combined production, fine processing of coal, development of renewable energy resources

    大型煤田開發,煤炭高效生產技術裝備,煤氣資源開發利用,高效低污染大型燃煤發電系統,城市熱電聯產電廠,煤炭精深加工,可再生能源開發等。
  12. This paper analyses current situation of chp and situation of development, use evaluating energy utilization - - based on electricity comparing with state calculated method - - based on heat, calculates the operating data of baotou second thermal power plant heat supply system , extends the study of heat supply performance to heat net and heat consumer, synthetically analyses heat load characteristic 、 pipe net property and heat supply distance witch effect heat supply cost. the paper studies the thermal power performance of thermal power plant total energy system, discuss heat supply cost which effect the development of chp

    本文對熱電聯產的現狀及發展情況進行分析,採用能源利用系統性能評價指標體系及其評價指標? ?電量法與國家目前採用的法定計量方法? ?熱量法進行比較,通過對內蒙古包頭第二熱電廠供熱熱源系統及供熱熱網系統的熱電聯產運行數據進行分析計算,將供熱過程的熱力性能研究延伸至熱網和熱用戶,分析用戶終端的能源利用情況,針對內蒙古地區主力機組和地區條件,綜合分析了熱負荷特性、管網性能及供熱距離對供熱成本的影響,研究了熱電廠總能系統的熱力性能,對困擾熱電聯產的供熱成本進行了探討。
  13. The electricity design of 4 - star hotel of xu zhou hua mei mansion ( 29 stories on the surface and 2 stories underground, 60, 000m2 construction areas ) ( 2 ) the work - out of the electric equipment document for tenders of xin cheng heat - and - power plant. ( 3 ) the work - out of the feasibitity report of jeluk power palnt ( 2 125mw ) of pakistan

    徐州華美大廈四星級賓館(地面29層,地下二層,建築面積6萬平方米)的電氣設計工作沛縣新城熱電廠電氣設備招標文件的編制工作巴基斯坦傑魯克電廠( 2 125mw )可行性研究報告的編制工作。
  14. In this paper, the application of a new spraying foam used in desulfurization of gangue heat and power plant flue gas is introduced

    摘要介紹了一種新型噴淋泡沫塔在煤矸石熱電廠煙氣治理中的應用。
  15. Which is approved in contract and waiting for building. are located in along - the - river industrial park. electricity is plenty : an in - construction heat and power plant being located in high technical zone and central electricity and heat supply being available after the plant completion

    常熟發電廠和已簽約待建的常熟第二發電廠皆座落於沿江工業園區,電源充裕在建的開發熱電廠布局在高新技術區,竣工后可集中供電供熱。
  16. This original presents the universal insulation materials and the general testing and evaluating method for pipelines " insulation of the thermodynamics power generating plant ; performs the insulation testing and evaluating of the high temperature steam pipelines of longfeng heat and power plant ; takes composite structural research on the high temperature steam pipelines, and establishes the relevant optimizing physical and mathematical model of the insulation layer, confirms the constraint and boundary condition, carries on optimizing design for the thickness of insulating layer ; in order to more systematically analyzing the present situation of insulation of the installation and pipelines of longfeng heat and power plant, develops a suit of software namely " the information associated decisive system for the insulation project ", taking advantage of this software can achieve. the design, evaluation and direction to building for the insulation project, examine the criterion of design and building, the perform ance and manufacture data of different insulation material, which is convenient to the selection of insulation material

    在進行保溫結構優化的過程中,主要是針對高溫蒸汽管道進行復合結構研究,並建立相應的物理及數學模型,找出其約束條件和邊界條件。同時為了更加系統地對龍鳳熱電廠設備及管道的保溫現狀進行分析,開發了一套「絕熱工程信息決策系統」軟體,利用該軟體可以實現絕熱工程的設計、評估及施工指導,並可以查閱設計及施工標準、各種絕熱材料性能和生產廠家的資料,便於絕熱材料的選擇。該套軟體的設計填補了國內空白,避免了絕熱工程改造、設計及施工過程中的無序現象,規范了絕熟工程市場,從而為我國絕熱工程的選材、設計、施工及管理提供科學依據。
  17. Item estimation, engineering design, engineering cost and other likeness on fossil - fired power station, heat and power plant, gas turbine combined - cyde power plant

    火力發電廠和熱電廠、燃氣輪機聯合循環電廠等工程項目評估、工程設計、工程造價或類似方面的業務。
  18. Most of the high temperature steam pipelines of longfeng heat and power plant have been worn * and the heat is lost seriously, which directly causes the energy cost of the corporation increases and the economic efficiency decreases, what is more, thanks to the high temperature in the workshop, the environment that employee staying is bad

    在對管道進行評價過程中,本文對幾種評價方法進行了探討,並給出了適合高溫蒸汽管道的保溫狀況評價方法。在本文中,還給出了測試方案、測試條件及評價標準等,對保溫工程的測試和評價具有指導意義。
  19. Abstract : to counter the defects existing in the belt coal loader in a heat and power plant of a certain company, the overall improving designs are made, and good dustremoving results are achieved

    文摘:針對某公司熱電廠皮帶上煤機除塵系統所存在的問題,進行了全面的改造設計,取得了良好的除塵效果。
  20. Moreover, combined heat and power ( chp ) plants and industrial plant and / or machinery software are offered

    請您訪問我們的主頁,垂詢當前的產品系列和服務。
分享友人